Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
E-100-Electrical-Site-Plan-Rev.4
WREN BUILDING (FUTURE) RESTROOM BUILDING (FUTURE) E.T. E.T. E.T.WB-40AASHTO 2011 (US)(c) 2014 Transoft Solutions, Inc. All rights reserved.WB-40AASHTO 2011 (US)(c) 2014 Transoft Solut ions, Inc. Al l rights reserved.2 3 WINDSOR BUILDING (FUTURE) 4 45 DUKE ENERGY TRANSFORMER SERVING HOTEL DUKE ENERGY TRANSFORMER SERVING WREN BUILDING DUKE ENERGY TRANSFORMER SERVING WINDSOR BUILDING A. SEE SHEET E-000 FOR ELECTRICAL SYMBOLS AND ABBREVIATIONS. B. SEE E-500 SERIES SHEETS FOR ELECTRICAL DETAILS. C. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE RAINPROOF AND WEATHER TIGHT. D. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR. USE SOLID CONDUCTOR FOR SIZE #10AWG AND SMALLER. USE STRANDED CONDUCTOR FOR LARGER SIZES. E. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES AND ORDINANCES PERTAINING TO THE WORK ON THIS PROJECT. F. SEE SHEETS E-801 AND E-802 FOR ONE-LINE DIAGRAMS. G. SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR LOCATIONS OF ACOUSTICALLY ISOLATED SPACES AND ADDITIONAL REQUIREMENTS. COORDINATE ALL MEP ITEMS WITH ACOUSTICAL ISOLATION SYSTEMS, INCLUDING BUT NOT LIMITED TO DUCTS, PIPES, WIRES, CONDUITS, ANCHORS, HANGERS, AND EQUIPMENT. COORDINATE INSTALLATION WITH GENERAL CONTRACTOR. H. SEE SHEET C501/C502 FOR DUKE PRIMARY CONDUIT. INSTALLED BY OTHERS. GENERAL SHEET NOTES DRAWING NO. DATE CDG PROJECT NO. DRAWING TITLE 3555 NW 58TH Street Suite 700-W Oklahoma City, OK 73112 T: 405.848.9549 F: 405.848.9783 www.gsb-inc.com Copyright ©GSB, Inc E-100 08/27/18 Electrical Site Plan 17089 CARMEL, INCARMEL, IN 2018 ARCHITECT GSB, INC 3555 NW 58th Street, Suite 700W Oklahoma City, OK 73112 405 / 848-9549 CIVIL ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 STRUCTURAL ENGINEER StructurePoint 7260 Shadeland Station Indianapolis, IN 46256 317 / 547-5580 MEP ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 INTERIOR DESIGNER HBA Hirsch Bedner Associates 171 17th Street NW, Suite 600 Atlanta, GA 30363 404 / 928-1333 FOOD SERVICE CONSULTANT Ricca Newmark Design 5325 South Valentia Way Greenwood Village, CO 80111 303 / 928-1333 N 0 40'20'10' SHEET KEYNOTES 1 NOT USED. 2 PAD MOUNT UTILITY TRANSFORMER ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT REQUIRED BY UTILITY COMPANY. COORDINATE WITH MS. CHRISTINA GIROD OF DUKE ENERGY. MS. GIROD CAN BE REACHED AT (317)273-9596 OR CHRISTINA.GIROD@DUKE-ENERGY.COM. 3 TRANSFORMER SECONDARY CONDUIT/WIRE. SEE ONE-LINE FOR SIZING INFORMATION. COORDINATE EXACT ROUTING WITH CIVIL PLANS. 4 TRANSFORMER SECONDARY CONDUITS BY OTHERS PRIOR TO PLACEMENT OF CONCRETE SLABS AND TRANSFORMERS. 5 E.C. SHALL INSTALL (1) 3" CONDUIT FOR RESTROOM BUILDING SERVICE TURN UP AND CAP AT RESTROOM BUILDING. 1" = 20'-0" Electrical Site Plan1 6 6 6 6 6 REVISIONS NO. DATE DESCRIPTION 09/12/2018 ADD #2 1 08/27/2018 Issued for Construction 3 12/03/2018 Revision 3 6 03/22/2019 Revision 8