Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
E-603-Electrical-Schedules-Rev.4
DRAWING NO. DATE CDG PROJECT NO. DRAWING TITLE 3555 NW 58TH Street Suite 700-W Oklahoma City, OK 73112 T: 405.848.9549 F: 405.848.9783 www.gsb-inc.com Copyright ©GSB, Inc E-603 08/27/18 Electrical Schedules 17089 CARMEL, INCARMEL, IN 2018 ARCHITECT GSB, INC 3555 NW 58th Street, Suite 700W Oklahoma City, OK 73112 405 / 848-9549 CIVIL ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 STRUCTURAL ENGINEER StructurePoint 7260 Shadeland Station Indianapolis, IN 46256 317 / 547-5580 MEP ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 INTERIOR DESIGNER HBA Hirsch Bedner Associates 171 17th Street NW, Suite 600 Atlanta, GA 30363 404 / 928-1333 FOOD SERVICE CONSULTANT Ricca Newmark Design 5325 South Valentia Way Greenwood Village, CO 80111 303 / 928-1333 Notes: O 0.00 kVA 0.00% 0.00 kVA R 0.00 kVA 0.00% 0.00 kVA L 0.18 kVA 100.00% 0.18 kVA Receptacle 523.13 kVA 50.96% 266.57 kVA Power 198.30 kVA 100.00% 198.30 kVA Other 88.99 kVA 100.00% 88.99 kVA Motor 682.80 kVA 100.00% 682.80 kVA Lighting - Exterior 36.42 kVA 125.00% 45.52 kVA Total Est. Demand:2480 A Lighting 217.68 kVA 125.00% 272.10 kVA Total Conn.:2713 A Kitchen Equipment - Non-Dwelling Unit 2.20 kVA 65.00%1.43 kVA Total Est. Demand:2061.64 kVA Heating 126.63 kVA 100.00% 126.63 kVA Total Conn. Load:2255.45 kVA HVAC 379.15 kVA 100.00% 379.15 kVA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:2713 A Total Conn. Load:2255.45 kVA 20 19 18 17 16 15 14 13 TND 3 125 A 125 A 35.16 kVA 12 TNK 3 225 A 225 A 174.67 kVA 11 HSK 3 400 A 400 A 129.34 kVA 10 HN5 3 125 A 125 A 1.47 kVA 9 HN3 3 125 A 125 A 2.05 kVA 8 HN2 3 125 A 125 A 21.60 kVA 7 HN1 3 225 A 225 A 86.51 kVA 6 HDPN7 3 800 A 800 A 701.14 kVA 5 HLR1 3 400 A 400 A 41.84 kVA 4 HDPN2 3 400 A 400 A 94.65 kVA 3 TN5 3 400 A 400 A 322.17 kVA 2 TN3 3 400 A 400 A 302.12 kVA 1 TN1 3 400 A 400 A 342.71 kVA CKT Circuit Description # of Poles Frame Size Trip Rating Load Remarks Notes: Enclosure:Type 1 MCB Rating:2500 A Mounting:Surface Wires:4 Mains Rating:3000 A Supply From:Phases:3 Mains Type: Location:Space 40 Volts:480/277 Wye A.I.C. Rating:42 KAIC Switchboard: HDPN Notes: Total Est. Demand:822 A Receptacle 45.60 kVA 60.96% 27.80 kVA Total Conn.:843 A Power 13.50 kVA 100.00% 13.50 kVA Total Est. Demand:683.65 kVA Motor 640.80 kVA 100.00% 640.80 kVA Total Conn. Load:701.14 kVA Lighting 1.24 kVA 125.00% 1.55 kVA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:845 A 844 A 842 A Total Load:234.10 kVA 233.74 kVA 233.30 kVA 83 ---- --8.80... 5.80... -- -- --84 81 ---- -- 8.80... 5.80... -- -- --82 79 CU-2-2B 30 A 3 8.80... 5.80...3 25 A CU-6-2 80 77 ---- --10.00... 10.00... -- -- --78 75 ---- -- 10.00... 10.00... -- -- --76 73 CU-2-2A 40 A 3 10.00... 10.00...3 40 A CU-1-1B 74 71 ---- --8.80... 10.00... -- -- --72 69 ---- -- 8.80... 10.00... -- -- --70 67 CU-1-1A 40 A 3 8.80... 10.00...3 40 A CU-2-1B 68 65 ---- --8.80... 5.80... -- -- --66 63 ---- -- 8.80... 5.80... -- -- --64 61 CU-2-1A 40 A 3 8.80... 5.80...3 25 A CU-5-2 62 59 ---- --5.80... 5.80... -- -- --60 57 ---- -- 5.80... 5.80... -- -- --58 55 CU-3-2 30 A 3 5.80... 5.80...3 30 A CU-4-2 56 53 ---- --5.80... 5.80... -- -- --54 51 ---- -- 5.80... 5.80... -- -- --52 49 CU-6-3 25 A 3 5.80... 5.80...3 30 A CU-4-3 50 47 ---- --5.80... 5.80... -- -- --48 45 ---- -- 5.80... 5.80... -- -- --46 43 CU-5-3 30 A 3 5.80... 5.80...3 30 A CU-3-3 44 41 ---- --8.80... 8.80... -- -- --42 39 ---- -- 8.80... 8.80... -- -- --40 37 CU-6-1 40 A 3 8.80... 8.80...3 40 A CU-5-1 38 35 ---- --8.80... 8.80... -- -- --36 33 ---- -- 8.80... 8.80... -- -- --34 31 CU-4-1 40 A 3 8.80... 8.80...3 40 A CU-3-1 32 29 ---- --5.80... 5.80... -- -- --30 27 ---- -- 5.80... 5.80... -- -- --28 25 CU-4-4 20 A 3 5.80... 5.80...3 20 A CU-3-4 26 23 ---- --5.80... 5.80... -- -- --24 21 ---- -- 5.80... 5.80... -- -- --22 19 CU-6-4 25 A 3 5.80... 5.80...3 30 A CU-5-4 20 17 ---- --4.50... 0.00... -- -- --18 15 ---- -- 4.50... 0.44... -- -- --16 13 ELEVATOR #2 25 A 3 4.50... 0.80...3 100 A HN7 14 11 ---- --15.20... 15.20... -- -- --12 9 ---- -- 15.20... 15.20... -- -- --10 7 ERV-4 80 A 3 15.20... 15.20...3 80 A ERV-3 8 5 ---- --18.60... 18.60... -- -- --6 3 ---- -- 18.60... 18.60... -- -- --4 1 ERV-1 90 A 3 18.60... 18.60...3 90 A ERV-2 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating: Mounting:Surface Wires:4 Mains Rating:800 A Supply From:HDPN Phases:3 Mains Type:MLO Location:MECHANICAL 702 Volts:480/277 Wye A.I.C. Rating:42KAIC Branch Panel: HDPN7 Notes: Heating 42.30 kVA 100.00% 42.30 kVA Spare 0.00 kVA 0.00% 0.00 kVA Kitchen Equipment - Non-Dwelling Unit 0.00 kVA 0.00% 0.00 kVA Total Est. Demand:107 A Motor 0.00 kVA 0.00% 0.00 kVA Total Conn.:104 A Other 0.42 kVA 100.00% 0.42 kVA Total Est. Demand:88.72 kVA Receptacle 0.00 kVA 0.00% 0.00 kVA Total Conn. Load:86.51 kVA Lighting 4.86 kVA 125.00% 6.08 kVA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:103 A 101 A 109 A Total Load:28.42 kVA 27.91 kVA 30.19 kVA 41 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 42 39 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 40 37 Spare 20 A 1 0.00... 0.00...1 20 A Spare 38 35 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 36 33 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 34 31 Spare 20 A 1 0.00... 0.00...1 20 A Spare 32 29 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 30 27 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 28 25 Spare 20 A 1 0.00... 0.00...1 20 A Spare 26 23 ---- --2.40... 10.67... -- -- --24 21 ---- -- 2.40... 10.67... -- -- --22 19 EDH-1-22 15 A 3 2.40... 10.6...3 50 A EAC-1 20 17 ---- --3.43... 3.43... -- -- --18 15 ---- -- 3.43... 3.43... -- -- --16 13 EDH-1-01 20 A 3 3.43... 3.43...3 20 A EDH-1-21 14 11 LEVEL 1 BACK OF HOUSE LIGHTING 20 A 1 3.10... 5.82...-- -- --12 9 ---- -- 1.33... 5.82... -- -- --10 7 ---- -- 1.33... 5.82...3 50 A DWBP-1 8 5 DOCK LEVELER 20 A 3 1.33... 0.00... 1 20 A Spare 6 3 LEVEL 2 FACADE LIGHTING 20 A 1 0.83... 0.00... 1 20 A Spare 4 1 LEVEL 1 OUTSIDE LIGHTS 20 A 1 0.76... 0.81...1 20 A LEVEL 1 FRONT OF HOUSE 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Enclosure:Type 1 MCB Rating: Mounting:Surface Wires:4 Mains Rating:225 A Supply From:HDPN Phases:3 Mains Type:MLO Location:Space 40 Volts:480/277 Wye A.I.C. Rating:22k HN1 Notes: Total Est. Demand:27 A Total Conn.:26 A Power 18.00 kVA 100.00% 18.00 kVA Total Est. Demand:22.33 kVA Other 0.65 kVA 100.00% 0.65 kVA Total Conn. Load:21.60 kVA Lighting 2.98 kVA 125.00% 3.72 kVA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:34 A 22 A 22 A Total Load:9.44 kVA 6.16 kVA 6.00 kVA 23 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 24 21 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 22 19 Spare 20 A 1 0.00... 0.00...1 20 A Spare 20 17 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 18 15 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 16 13 Spare 20 A 1 0.00... 2.00...-- -- --14 11 Spare 20 A 1 0.00... 2.00... -- -- --12 9 ---- -- 2.00... 2.00... 3 35 A ERH-3 10 7 ---- -- 2.00... 2.00...-- -- --8 5 ERH-2 35 A 3 2.00... 2.00... -- -- --6 3 N FACADE LIGHTS 20 A 1 0.16... 2.00... 3 35 A ERH-1 4 1 LEVEL 2 LIGHTING 20 A 1 2.32... 1.16...1 20 A LEVEL 2 LIGHTING 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating: Mounting:Surface Wires:4 Mains Rating:125 A Supply From:HDPN Phases:3 Mains Type:MLO Location:MECHANICAL 248 Volts:480/277 Wye A.I.C. Rating:22k Branch Panel: HN2 Notes: Total Est. Demand:3 A Total Conn.:2 A L 0.00 kVA 0.00% 0.00 kVA Total Est. Demand:2.30 kVA Other 1.09 kVA 100.00% 1.09 kVA Total Conn. Load:2.05 kVA Lighting 0.99 kVA 125.00% 1.24 kVA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:6 A 3 A 0 A Total Load:1.49 kVA 0.66 kVA 0.00 kVA 23 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 24 21 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 22 19 Spare 20 A 1 0.00... 0.00...1 20 A Spare 20 17 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 18 15 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 16 13 Spare 20 A 1 0.00... 0.00...1 20 A Spare 14 11 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 12 9 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 10 7 Spare 20 A 1 0.00... 0.00...1 20 A Spare 8 5 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 6 3 FACADE LIGHTING 20 A 1 0.26... 0.39... 1 20 A NORTH FACADE COLUMN LIGHTING 4 1 LIGHTING LEVEL 3 CORRIDOR 20 A 1 0.80... 0.73...1 20 A Other 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating: Mounting:Surface Wires:4 Mains Rating:125 A Supply From:HDPN Phases:3 Mains Type:MLO Location:Space 126 Volts:480/277 Wye A.I.C. Rating:22K Branch Panel: HN3 Notes: Total Est. Demand:2 A Total Conn.:2 A Total Est. Demand:1.57 kVA Other 1.09 kVA 100.00% 1.09 kVA Total Conn. Load:1.47 kVA Lighting 0.38 kVA 125.00% 0.48 kVA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:5 A 0 A 0 A Total Load:1.47 kVA 0.00 kVA 0.00 kVA 23 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 24 21 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 22 19 Spare 20 A 1 0.00... 0.00...1 20 A Spare 20 17 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 18 15 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 16 13 Spare 20 A 1 0.00... 0.00...1 20 A Spare 14 11 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 12 9 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 10 7 Spare 20 A 1 0.00... 0.00...1 20 A Spare 8 5 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 6 3 Spare 20 A 1 0.00... 0.00... 1 20 A Spare 4 1 LIGHTING LEVEL 5 CORRIDOR 20 A 1 0.75... 0.73...1 20 A CORRIDOR LIGHTING 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating: Mounting:Surface Wires:4 Mains Rating:125 A Supply From:HDPN Phases:3 Mains Type:MLO Location:Space 271 Volts:480/277 Wye A.I.C. Rating:22K Branch Panel: HN5 NO. DATE DESCRIPTION 09/12/2018 ADD #2 1 08/27/2018 Issued for Construction 6 03/22/2019 Revision 8 7 05/15/2019 Revision 10 7