Loading...
HomeMy WebLinkAboutEP102-Power-Floor-Plan-Level-2-Rev.8DN T T T T T T T T T T T T TT T T TTT J J J J S SC C CCJ J J J J J J SS S C C C C SS5 5 8 8 11 11 12 12 17 17 21 21 23 23 26 26 28 28 30 30 32 32 D D F F J J L L P P T T 1 1 Y Y U U A A 9 9 4 4 18 18 KK N N 7 7 W W 31 31 RR 20 20 16 16 15 15 29 29 27 2725 25 14 14 6 6 13 13 EE G G XX SS VV 2 23 3 10 10 22 22 24 24 B B QQ M M ZZ 19 19 C C HH 9.2 9.2 L.5L.5 A.7 A.7 0.9 0.9 6.7 6.7 HN2 HLR2 LN2B A/V ROOM 244 JAN 245 HOLDING KITCHEN 237 WOMEN 238 MEN 239 ELEVATOR LOBBY 208 LUGGAGE 232 F.O. MANAGER 231 VEST 228 WORK 227 F&B 219 CATERING 218 FURNITURE STORAGE 217 STAIR #2 2ST2 VEST 215 MEN 222 JAN 224 WOMEN 223 VEST 221RETAIL 226 SERV 229 WELCOME DESK 230 CORRIDOR 234 BELL ACCESS 233 STORAGE 241 COATS 240 STAIR #1 2ST1 BALLROOM 246 PREFUNCTION 242 BREAKOUT 243 MEETING 201 COVERED PORCH 205 LOBBY 202 CORRIDOR 203 REVENUE 214 VEST 213 CORRIDOR 247 HDPN2 HDPN2 - 7,9,11 LOBBY BAR 207 BOARDROOM 211 VESTIBULE 204 CART STOR 209CART STOR. 216 CORRIDOR 247 GM 212 LIBRARY 210 UNISEX 225 CORR 220 TERRACE 249 CORRIDOR 203 E-406 2 7 WP WP 7 1 1 1 DWH-4 WS-1 MECHANICAL 248 LN2B - 1 LN2B - 1 LN2B - 1 LN2B - 1 LN2B - 2 LN2A - 16 LN2B - 3 LN2B - 3 LN2B - 22 LN2B - 22 LN2A - 16 LN2A - 16 LN2A - 16 CORRIDOR 203 CORRIDOR 203 CORRIDOR 203 CORRIDOR 203 LN2C - 29 LN2B - 5 LN2B - 5 LN2B - 5 LN2B - 5 LN2B - 3 LN2B - 4 LN2B - 4 LN2B - 6 LN2B - 6 LN2B - 27 LN2C - 15 LN2C - 14 LN2B - 7 LN2C - 13 LN2C - 12 LN2C - 9 LN2C - 9 LN2C - 9 LN2C - 10 LN2C - 10 LN2C - 10 LN2C - 10 LN2C - 11 LN2A - 32LN2A - 32LN2A - 32 LN2C - 5 LN2C - 5 LN2C - 5 LN2C - 1 LN2C - 1 LN2C - 1 LN2C - 4 LN2C - 4 LN2C - 4 LN2C - 2 LN2C - 2LN2C - 8 LN2C - 6 LN2C - 26 LN2C - 26 LN2C - 18LN2C - 18 LN2C - 17 LN2C - 17 LN2C - 17 LN2A - 3LN2A - 3 LN2A - 13 LN2A - 13 LN2A - 4 LN2A - 2 LN2A - 2 LN2A - 2 LN2A - 2 LN2A - 1 LN2A - 1 LN2A - 1 LN2A - 1 LN2A - 4 LN2A - 4 LN2A - 14 LN2A - 14 LN2A - 14 LN2A - 14 LN2A - 14 LN2A - 15 LN2A - 17 LN2A - 18 LN2A - 18 LN2A - 18 LN2A - 18 LN2A - 13 LN2A - 20 LN2A - 20 LN2A - 20 LN2A - 20 LN2A - 20 LN2A - 21 LN2A - 21 LN2A - 21LN2A - 21 LN2A - 22 LN2A - 22 LN2A - 22 LN2A - 31 CORRIDOR 203 LN2D LN2D - 13,15 LN2D - 14,16 3 E-404 2 5 5 WP WP WP WP LN2A - 19 LN2A - 19 LN2A - 19 LN2A - 19 LN2C - 5 1 LN2A - 1 LN2A - 2 E-404 3 E-404 4 TND 4 LN2A - 4 1 4 LN2A - 18 LN2C - 14 LN2C - 14 4 LN2C - 2 LN2C - 7 LN2C - 7 LN2C - 7 LN2C - 7 LN2C - 6 LN2C - 6 LN2C - 27 LN2C - 27 LN2C - 27 LN2C - 27 LN2C - 16 LN2C - 29 LN2C - 29 LN2C - 31 LN2C - 29 LN2C - 30 LN2C - 31 LN2C - 30 LN2A - 10 LN2A - 10 LN2C - 2 6 6 5 USB USB USB LN2C - 9 2 2 2 LN2C - 28 2 2 2 2 22 2 2 2 2 LN2A - 12 LN2A - 12 LN2A - 12 LN2A - 10 LN2A - 12 LN2A - 12 LN2C - 28 LN2C - 28 LN2C - 28 LN2C - 28 LN2C - 28 LN2C - 28 LN2A - 12 1 LN2B - 4 LN2B - 6 6 6 6 6 6 6 6 5 5 5 5 8 5 LN2A - 25 LN2A - 23 LN2A - 27 LN2A - 26 LN2A - 29 LN2A - 24 LN2A - 28LN2A - 30 9 9 LLR1 - 6 LLR1 - 5 LLR1 - 8 LN2B - 43 LN2B - 44 10 11 12 3LN2D - 22 LN2D - 21 HN2 - 4,6,8 HN2 - 5,7,9 HN2 - 10,12,14 LN2D - 34 LN2D - 36DTMV-2 LN2D - 23 14 14 LN2A - 5,7 LN2A - 6,8 LN2A - 9,11 LN2A LN2C LN2C - 7 LN2C - 7 LN2A - 18 LN2A - 18 16 LN2A - 2 1 LN2A - 44,46,48 LN2A - 43,45,47 17 18 17 18 LN2A - 18 EUH-7 LN2D - 58,60 EUH-6 LN2D - 54,56 LN2D - 35,37 ERH-2ERH-1 ERH-3 FCU-2-13 FCU-2-18 FCU-2-19 LN2D - 53,55 FCU-2-17 FCU-2-16 FCU-2-14 LN2D - 57,59 DS-4 EDH-2-17 EDH-2-18 HDPN2 - 19,21,23 HDPN2 - 20,22,24 FCU-2-15 FCU-2-12 EDH-2-15 EDH-2-12 LN2A - 54,56 HDPN2 - 14,16,18 LN2A - 58,60 HDPN2 - 8,10,12 LN2A - 42 LN2A - 42 4 EBH-1 EBH-2 EBH-3 EDH-2-03 EDH-2-04 FCU-2-9 HDPN2 - 25,27,29 HDPN2 - 43,45,47 LN2B - 54,56 EUH-5 FCU-2-7 LN2C - 40,42 ? ? AHU-1 KEF-1 KEF-2 KEF-3 EF-2 DWH-3 LN2C - 1 TN3 FCU-2-6 FCU-2-4 FCU-2-2 FCU-2-8 FCU-2-5 FCU-2-10 FCU-2-11 FCU-2-3 FCU-2-1 BSB-2-2A 19 20 20 1 LN2A - 30 LN2A - 28 LN2A - 27 LN2A - 26 LN2A - 23LN2A - 25LN2A - 24LN2A - 29 LN2D - 8 LN2D - 10,12 A. SEE SHEET E-000 FOR ELECTRICAL SYMBOLS AND ABBREVIATIONS. B. SEE E-400 SERIES SHEETS FOR ENLARGED PLANS. C. SEE E-500 SERIES SHEETS FOR ELECTRICAL DETAILS. D. SEE E-602 FOR ELECTRICAL CONNECTIONS TO MECHANICAL AND PLUMBING EQUIPMENT SCHEDULE. E. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL INTERCONNECT WIRING FURNISHED BY OTHER TRADES INCLUDING BUT NOT LIMITED TO HVAC, PLUMBING AND KITCHEN. F. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE RAINPROOF AND WEATHER TIGHT. G. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR. USE SOLID CONDUCTOR FOR SIZE #10AWG AND SMALLER. USE STRANDED CONDUCTOR FOR LARGER SIZES. H. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A COLOR TO MATCH THE AREA COLOR SCHEME AS DIRECTED BY INTERIOR DESIGNER. I. ALL RECEPTACLES AND SWITCHES SHALL BE FLUSH MOUNTED UNLESS NOTED OTHERWISE. J. REFER TO ARCHITECTURAL AND INTERIOR DESIGN DRAWING FOR DIMENSIONS, ROOM AND AREA FINISHES, CEILING PLANS, DOOR SWINGS, FIRE RATED PARTITIONS, CABINET AND CASEWORK DETAILS. K. FINAL DETERMINATION OF FIRE STOPPING REQUIREMENTS SHALL BE BASED ON LOCAL CODE REQUIREMENTS. SEE ARCHITECTURAL COVER SHEET FOR ADDITIONAL INFORMATION. L. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES AND ORDINANCES PERTAINING TO THE WORK ON THIS PROJECT. M. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT RIGHT ANGLES TO THE BUILDING LINES. N. SEE E-800 SERIES SHEETS FOR ONE-LINE DIAGRAMS. O. SEE SHEET E-611 FOR ELECTRICAL CONNECTIONS TO KITCHEN EQUIPMENT SCHEDULE. P. VERIFY MOUNTING HEIGHT FOR ALL CLOCK RECEPTACLES WITH INTERIOR DESIGN DRAWINGS PRIOR TO ROUGH-IN. Q. SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR LOCATIONS OF ACOUSTICALLY ISOLATED SPACES AND ADDITIONAL REQUIREMENTS. COORDINATE ALL MEP ITEMS WITH ACOUSTICAL ISOLATION SYSTEMS, INCLUDING BUT NOT LIMITED TO DUCTS, PIPES, WIRES, CONDUITS, ANCHORS, HANGERS, AND EQUIPMENT.COORDINATE INSTALLATION WITH GENERAL CONTRACTOR. R. FOR ALL FAN COIL UNITS (FCU) INSTALL A THERMAL SWITCH CONNECTION. GENERAL SHEET NOTES DRAWING NO. DATE CDG PROJECT NO. DRAWING TITLE 3555 NW 58TH Street Suite 700-W Oklahoma City, OK 73112 T: 405.848.9549 F: 405.848.9783 www.gsb-inc.com Copyright ©GSB, Inc EP102 08/27/18 Power Floor Plan Level 2 17089 CARMEL, INCARMEL, IN 2018 ARCHITECT GSB, INC 3555 NW 58th Street, Suite 700W Oklahoma City, OK 73112 405 / 848-9549 CIVIL ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 STRUCTURAL ENGINEER StructurePoint 7260 Shadeland Station Indianapolis, IN 46256 317 / 547-5580 MEP ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 INTERIOR DESIGNER HBA Hirsch Bedner Associates 171 17th Street NW, Suite 600 Atlanta, GA 30363 404 / 928-1333 FOOD SERVICE CONSULTANT Ricca Newmark Design 5325 South Valentia Way Greenwood Village, CO 80111 303 / 928-1333 1/8" = 1'-0" Power Floor Plan Level 21 N 0 16'8'4' SHEET KEYNOTES 1 MOUNT CENTER OF DEVICE AT +6" ABOVE TOP OF COUNTERTOP BACK SPLASH. VERIFY FINAL LOCATION WITH INTERIOR DESIGNER. 2 MOUNT DEVICE HORIZONTALLY. MOUNT CENTER OF DEVICE 6" BELOW CEILING. 3 DOMESTIC HOT WATER RECIRCULATION PUMPS. VERIFY FINAL LOCATION WITH PLUMBING CONTRACTOR 4 MOUNT CENTER OF DEVICE AT +5'-0" AFF. VERIFY FINAL LOCATION WITH INTERIOR DESIGNER PRIOR TO ROUGH-IN. 5 FIRE RATED POKE THROUGH BY HUBBELL #SIR4PTQUADXXX WITH #SIR4CVRXXX COVER. FINISH SELECTION BY INTERIOR DESIGNER. 6 MOUNT CENTER OF DEVICE AT +4'-0" A.F.F. 7 MOUNT CENTER OF DEVICE AT +3'-6" A.F.F. 8 FIRE RATED POKE THROUGH BY HUBBELL #SIR6PTXXX WITH #SIR6CVRXXX COVER. FINISH SELECTION BY INTERIOR DESIGNER. 9 POWER CONNECTION FOR AUTOMATIC DOOR OPERATOR. VERIFY FINAL LOCATION IN FIELD WITH GENERAL CONTRACTOR PRIOR TO ROUGH-IN. 10 LIGHTING CONTACTOR LC-N. SEE ELECTRIAL DETAILS FOR ADDITIONAL INFORMATION. 11 SCENE CONTROLLER SC-N. SEE E-601 FOR ADDITIONAL INFORMATION. 12 LIGHTING CONTACTOR LC-LR. SEE ELECTRIAL DETAILS FOR ADDITIONAL INFORMATION. 14 DOMESTIC HOT WATER PUMPS. VERIFY FINAL LOCATION WITH PLUMBING CONTRACTOR. 16 MOUNT CENTER OF DEVICE AT +7'-0" A.F.F. 17 (4) #6, #10 GROUND, 1" CONDUIT. 18 RECESSED NEMA 14-60R. MOUNT CENTER OF DEVICE +1'-6" AFF. 19 DISCONNECT SERVING LDPN3. SEE SHEET E-801 FOR MORE DETAILS. 20 SEE REVISION 10 NARRATIVE FOR CHANGES IN THIS AREA. PLAN SHEET WILL REFLECT CHANGES ONCE MODEL UPDATE IS RECEIVED. REFER TO SHEET M2-02 FOR FURTHER DETAILS. NO. DATE DESCRIPTION 1 08/27/2018 Issued for Construction 6 03/22/2019 Revision 8 7 05/15/2019 Revision 10 10 06/25/2019 RFI-086 19 11/14/2019 Revision 21 20 12/20/2019 Revision 22 20