Loading...
HomeMy WebLinkAboutET102-Technology-Floor-Plan-Level-2-Rev.6DN T T T T T T T T T T T T TT T T TTT J JJ JS S FS TS FS TS SSSS S S S E S S S S S S S S S S E S SS S D S D S S S SCCCCC CCCCC CCC C CFAA S SHHHHH HH HH HHHH HHHH H H H H H H H HH H HH F H H S S S S S S 5 5 8 8 11 11 12 12 17 17 21 21 23 23 26 26 28 28 30 30 32 32 D D F F J J L L P P T T 1 1 Y Y U U A A 9 9 4 4 18 18 KK N N 7 7 W W 31 31 RR 20 20 16 16 15 15 29 29 27 2725 25 14 14 6 6 13 13 EE G G XX SS VV 2 23 3 10 10 22 22 24 24 B B QQ M M ZZ 19 19 C C HH 9.2 9.2 L.5L.5 A.7 A.7 0.9 0.9 6.7 6.7 A/V ROOM 244 JAN 245 HOLDING KITCHEN 237 WOMEN 238 MEN 239 ELEVATOR LOBBY 208 LUGGAGE 232 F.O. MANAGER 231 VEST 228 WORK 227 UNISEX 225 F&B 219 CATERING 218 FURNITURE STORAGE 217 STAIR #2 2ST2 VEST 215 MEN 222 JAN 224 WOMEN 223 VEST 221RETAIL 226 SERV 229WELCOME DESK 230 CORRIDOR 234 BELL ACCESS 233STORAGE 241 COATS 240 SERVICE 236 STAIR #1 2ST1 PREFUNCTION 242 BREAKOUT 243 Room 200 MEETING 201 COVERED PORCH 205 LOBBY 202 CORRIDOR 203 REVENUE 214 VEST 213 CORR 220 CORRIDOR 247 BALLROOM 246 VESTIBULE 204 LOBBY BAR 207 BOARDROOM 211 1 1 A A E-406 2 GM 21211 1 2 2 44 TERRACE 249 2 3 3 4 4 4 4 6 5 4 4 4 44 4 4 4 4 4 4 4 4 4 44 WP WP WP 2 7 2 8 AC 3 MECHANICAL 248 MECHANICAL 248 CORRIDOR 235 CO CO CO CO A. REFER TO SHEET E-000 FOR ELECTRICAL SYMBOLS AND ABBREVIATIONS. B. SEE E-500 SERIES DRAWINGS FOR ELECTRICAL DETAILS. C. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A COLOR TO MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR DESIGNER. D. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES AND ORDINANCES PERTAINING TO THE WORK IN THIS PROJECT. E. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT RIGHT ANGLES TO BUILDING LINES. F. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGNATION AND LISTING OF FIRE RATED ASSEMBLIES. COORDINATE ALL DESIGN EFFORTS WITH FIRE RESISTANCE OF MATERIALS AND CONSTRUCTION. G. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE WEATHER PROOF AND RAIN TIGHT. H. EACH TELE/DATA OUTLET SHALL HAVE A MINIMUM OF ONE CAT 6 CABLE. A NUMBER DESIGNATION NEXT TO A TELE/DATA OUTLET INDICATES THE QUANTITY OF CAT 6 CABLES PULLED TO RESPECTIVE OUTLET. I. HOUSINGS FOR ALL FIRE ALARM EQUIPMENT SHALL BE WHITE WITH RED LETTERS. J. SEE LOW VOLTAGE DRAWINGS FOR ADDITIONAL WORK. K. SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR LOCATIONS OF ACOUSTICALLY ISOLATED SPACES AND ADDITIONAL REQUIREMENTS. COORDINATE ALL MEP ITEMS WITH ACOUSTICAL ISOLATION SYSTEMS, INCLUDING BUT NOT LIMITED TO DUCTS, PIPES, WIRES, CONDUITS, ANCHORS, HANGERS, AND EQUIPMENT.COORDINATE INSTALLATION WITH GENERAL CONTRACTOR. GENERAL SHEET NOTES DRAWING NO. DATE CDG PROJECT NO. DRAWING TITLE 3555 NW 58TH Street Suite 700-W Oklahoma City, OK 73112 T: 405.848.9549 F: 405.848.9783 www.gsb-inc.com Copyright ©GSB, Inc ET102 08/27/18 Technology Floor Plan Level 2 17089 CARMEL, INCARMEL, IN 2018 ARCHITECT GSB, INC 3555 NW 58th Street, Suite 700W Oklahoma City, OK 73112 405 / 848-9549 CIVIL ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 STRUCTURAL ENGINEER StructurePoint 7260 Shadeland Station Indianapolis, IN 46256 317 / 547-5580 MEP ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 INTERIOR DESIGNER HBA Hirsch Bedner Associates 171 17th Street NW, Suite 600 Atlanta, GA 30363 404 / 928-1333 FOOD SERVICE CONSULTANT Ricca Newmark Design 5325 South Valentia Way Greenwood Village, CO 80111 303 / 928-1333 1/8" = 1'-0" Technology Floor Plan Level 21016'8'4' N SHEET KEYNOTES 1 SEE KEYNOTE #8 ON SHEET EP102 FOR ADDITIONAL INFORMATION. 2 MOUNT CENTER OF DEVICE 6" ABOVE TOP OF COUNTERTOP BACKSPLASH. 3 MOUNT CENTER OF DEVICE +5'-0" AFF. VERIFY FINAL LOCATION WITH INTERIOR DESIGNER PRIOR TO ROUGH IN. 4 ACCESS POINT ROUGH-IN. SEE LOW VOLTAGE DRAWINGS FOR MOUNTING HEIGHT. 5 SEE KEYNOTE #9 ON SHEET EP102 FOR ADDITIONAL INFORMATION. 6 TELE/DATA OUTLET MOUNTED IN CASE WORK. VERIFY FINAL LOCATION WITH APPROVED CASE WORK SHOP DRAWINGS. 7 EXTERIOR LIGHTING SCENE CONTROLLER SC-N. 8 (1) CAT 6 CABLE BACK TO NEAREST IDF ROOM. REVISIONS NO. DATE DESCRIPTION 1 08/27/2018 Issued for Construction 6 03/22/2019 Revision 8 12 09/06/2019 Revision 18 19 11/14/2019 Revision 21 19