Loading...
HomeMy WebLinkAboutF-104-Fire-Suppression-Reflected-Ceiling-Plan-Level-1-Rev.1CONCEALED HEAD WITH COVER PLATE1.2.3.4.SIDEWALL MOUNTED PENDANT HEADSEMI-RECESSED HEAD WITH ESCUTCHEONEXPOSED BRASS UPRIGHT PENDANT HEAD5588111112121717212123232626282830303232DDFFJJLLPPTT11YYUUAA99441818KKNN77WW3131RR2020161615152929272725251414661313EEGGXXSSVV2233101022222424BBQQMMZZ1919CCHH9.29.2L.5L.5A.7A.70.90.96.76.712222224" F4" F4" F4" F4" F6" F4" F6" F4" F4" F4" F33333344444444444GENERAL FIRE NOTESA. REFER TO SHEET M-000 FOR GENERAL SYMBOLS AND ABBREVIATIONS.B. ALL WORK SHALL BE IN ACCORDANCE WITH THE BEST QUALITY STANDARDS OF THE TRADE AND SHALL CONFORM WITH ALL FEDERAL, STATE AND LOCAL CODES AND STANDARDS. THE SAME ARE MADE A PART OF THESE CONTRACT DOCUMENTS, THE SAME AS IF REPEATED HEREIN.C. CONTRACT DOCUMENTS CONSIST OF BOTH THE PROJECT MANUAL AND DRAWINGS AND BOTH ARE INTENDED TO BE COMPLIMENTARY -ANYTHING APPEARING ON EITHER MUST BE EXECUTED THE SAME AS IF SHOWN ON BOTH.D. THE CONTRACTOR SHALL INCLUDE IN BID PROPOSAL ALL COSTS REQUIRED TO COMPLETELY AND PROPERLY INSTALL ALL WORK REQUIRED FOR THE PROJECT AND SHALL EXAMINE THE SCOPE OF WORK OF OTHER TRADES PRIOR TO SUBMITTING A BID PROPOSAL.E. CONSTUCTION DOCUMENTS SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE, HOWEVER, SYSTEMS HAVE BEEN SHOWN DIAGRAMATICALLY AND IN SOME CASES, ENLARGED FOR CLARITY. ANY OFFSETS, ADDITIONAL FITTINGS AND/OR APPURTENANCES REQUIRED TO PROVIDE A COMPLETE AND COORDINATED SYSTEM SHALL BE BORNE BY THE CONTRACTOR.F. PROVIDE AND INSTALL AUTOMATIC SPRINKLER SYSTEMS AS REQUIRED IN ALL AREAS UNLESS OTHERWISE NOTED. THE FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND ADJUST HIS WORK ACCORDING TO ANY VARIATIONS OR DEVIATIONS FROM THOSE SHOWN ON THE PLANS.G. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND INSTALLATION OF THE FIRE PROTECTION SYSTEMS AND SHALL CONFORM TO THE NATIONAL FIRE PROTECTION ASSOCIATION CODES (NFPA) STANDARDS AND RECOMMENDED PRACTICES, LATEST EDITIONS ADOPTED BY THE STATE, ALL APPLICABLE STATE AND LOCAL FIRE PREVENTION BUREAU'S STATUTES, CODES AND REQUIREMENTS OF OWNER'S INSURANCE UNDERWRITER. INCLUDE ALL PIPE AND FITTINGS, APPROVED WATER FLOW DETECTING ALARM DEVICES, PRESSURE GAUGES, SPRINKLER HEADS, INDICATING VALVES, FIRE DEPARTMENT CONNECTIONS AND OTHER MATERIALS NEEDED TO PROVIDE A COMPLETE AND OPERABLE CODE COMPLIANT SYSTEM, BASE ON THE DATE OF THE CONSTRUCTION DESIGN RELEASE.H. SPRINKLER PIPING INSTALLATION SHALL BE COORDINATED WITH OTHER TRADES, EQUIPMENT, DUCTWORK, STRUCTURAL STEEL, ELECTRICAL PANELS, RACEWAYS, ARCHITECTURAL DESIGN INTENT; INCLUDING REFLECTED CEILING PLANS AND CEILING TILE DIMENSIONS PRIOR TO INSTALLATION. PIPING NOT COORDINATED MAY NEED TO BE REMOVED AND/OR REPLACED. ANY REMOVAL REQUIRED DUE TO INCOMPLETE COORDINATION, SHALL BE DONE BY THE SPRINKLER CONTRACTOR, ALL COST SHALL BE BORNE BY THE SPRINKLER CONTRACTOR.I. THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE AND INSTALL CEILING ACCESS PANELS FOR ACCESS TO SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. LOCATED ABOVE NON-ACCESSIBLE CEILINGS. COORDINATE LOCATION OF ACCESS PANELS WITH ARCHITECT/ENGINEER.J. ALL ELECTRICAL AND MECHANICAL ROOMS SHALL BE SPRINKLED WITH HIGH TEMPERATURE SPRINKLER HEADS.K. NO PIPING SHALL BE ROUTED OVER OR THRU ELECTRICAL OR IT CLOSETS, UNLESS IT IS TO SERVICE EQUIPMENT OR DEVICES IN THE SPACE.L. REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS.M. MAINTAIN EGRESS PATH CLEARANCE IN STAIRS.N. WATER FLOW TEST DATA IS THE FIRE PROTECTION CONTRACTORS RESPONSIBILITY TO ENSURE ADEQUACY OF FLOW AND PRESSURE.O. SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR LOCATIONS OF ACOUSTICALLY ISOLATED SPACES AND ADDITIONAL REQUIREMENTS. COORDINATE ALL FIRE PROTECTION ITEMS WITH ACOUSTICAL ISOLATION SYSTEMS, INCLUDING BUT NOT LIMITED TO PIPES, WIRES, CONDUITS, ANCHORS, HANGERS AND EQUIPMENT. COORDINATE INSTALLATION WITH GENERAL CONTRACTOR.P. SPRINKLER HEADS SHOWN ARE FOR ARCHITECTURAL INTENT AND BIDDING PURPOSES ONLY. SUCCESSFUL FIRE PROTECTION CONTRACTOR SHALL HAVE THE SPRINKLER HEAD LAYOUT REVIEWED AND APRROVED BY THE ARCHITECT PRIOR TO INSTALLATION.SPRINKLER HEAD LEGENDDRAWING NO.DATECDG PROJECT NO.DRAWING TITLE3555 NW 58TH StreetSuite 700-WOklahoma City, OK 73112T: 405.848.9549F: 405.848.9783www.gsb-inc.comCopyright ©GSB, Inc ISSUED FOR CONSTRUCTIONF-10408/27/18Fire Suppression ReflectedCeiling Plan Level 117089CARMEL, INCARMEL, IN2018ARCHITECTGSB, INC3555 NW 58th Street, Suite 700WOklahoma City, OK 73112405 / 848-9549CIVIL ENGINEERCircle Design Group9229 Delegates Row, Suite 150Indianapolis, IN 46240317 / 706-2075STRUCTURAL ENGINEERStructurePoint7260 Shadeland StationIndianapolis, IN 46256317 / 547-5580MEP ENGINEERCircle Design Group9229 Delegates Row, Suite 150Indianapolis, IN 46240317 / 781-6200INTERIOR DESIGNERHBA Hirsch Bedner Associates171 17th Street NW, Suite 600Atlanta, GA 30363404 / 873-4379FOOD SERVICE CONSULTANTRicca Newmark Design5325 South Valentia WayGreenwood Village, CO 80111303 / 928-1333 1/8" = 1'-0"Fire Suppression Reflected Ceiling Plan Level 11N016'8'4'SHEET KEYNOTES1 PROVIDE SIDEWALL MOUNTED SPRINKLER HEAD.2 PROVIDE CONCEALED SPRINKLER WITH COVER PLATED PAINTED TOMATCH CEILING FINISH.3 PROVIDE RECESSED SPRINKLER HEAD AND ESCUTCHEON CENTERED INCEILING TILE SYSTEM.4 PROVIDE A DRY TYPE SIDEWALL MOUNTED SPRINKLER HEAD TO SERVEAREAS SUBJECT TO FREEZING.NO. DATE DESCRIPTION1 08/27/2018 Issued for construction