Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
M1-07-MECHANICAL-ROOF-PLAN-Rev.1
T MECHANICAL 702 ERV-3 ERV-4 ERV-1 ERV-2 1 M3-01 28"x10" 28"x10" 2 M3-01 EUH-3 EUH-4 EF-3 DSCU-5DSCU-6 DSCU-7 DSCU-8 CU-3-1 CU-4-1 CU-5-1 CU-6-1 CU-3-2 CU-4-2 CU-5-2 CU-6-2 CU-3-3 CU-4-3 CU-6-3CU-5-3 CU-3-4 CU-4-4 CU-5-4 CU-6-4 CU-2-2 CU-1-1CU-2-1 10" 5 8 11 11 12 17 21 21 23 23 26 26 28 28 30 30 32 32 D D F F J L L P T 1 1 Y Y U U A A 94 18 18 K N N 7 W W 31 31 R R 201615 15 29 29 27 2725 25 146 13 E G G X S V 2 2 3 10 22 24 B B Q M ZZ 19 19 C H 9.2 L.5 A.7 6.7 21 21 21 3 3 3 3 3 5 6 6 6 6 6 6 7 8 4 4 9 10 13 M5-01 13 M5-01 7 M5-01 7 M5-01 7 M5-01 7 M5-01 7 M5-01 7 M5-01 6 7 M5-01 6 M5-01 1 M5-01 1 M5-01 1 M5-01 1 M5-01 EWH-13 10 M5-01 10 M5-01 10 M5-01 11 30"x14" 28"x10" 28"x10" 28"x10" 13 12 12 12 MD L-1 EF-3 EV-3 EV-1 EV-2 8" 8" 8" 8" 14 14 GENERAL NOTES: 1. REFER TO M0-01 FOR ADDITIONAL GENERAL NOTES. 2. REFER TO PIPING PLANS FOR THERMOSTAT LOCATIONS. 3. REFER TO M6-01 FOR VRF PIPE SIZES. 4. REFER TO M0-01 FOR INSULATION NOTES. DRAWING NO. DATE GSB PROJECT NO. DRAWING TITLE 3555 NW 58TH Street Suite 700-W Oklahoma City, OK 73112 T: 405.848.9549 F: 405.848.9783 www.gsb-inc.com Copyright © GSB, Inc M1-07 03/22/19 MECHANICAL ROOF PLAN 171528 CARMEL, INCARMEL, IN HOTEL CARMICHAEL AT CITY CENTER 2018 ARCHITECT GSB, INC 3555 NW 58th Street, Suite 700W Oklahoma City, OK 73112 405 / 848-9549 CIVIL ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 STRUCTURAL ENGINEER StructurePoint 7260 Shadeland Station Indianapolis, IN 46256 317 / 547-5580 MEP ENGINEER DEEM 6831 E. 32nd Street, Suite 200 Indianapolis, IN 46226 317 / 860-2990 INTERIOR DESIGNER HBA Hirsch Bedner Associates 171 17th Street NW, Suite 600 Atlanta, GA 30363 404 / 873-4379 FOOD SERVICE CONSULTANT Ricca Design Studios 5325 South Valentia Way Greenwood Village, CO 80111 303 / 928-1333 NORTH 1/8" = 1'-0"M1-07 1 MECHANICAL ROOF PLAN # PLAN NOTES: 1 ALL EXPOSED ROOF DUCTWORK SHALL BE INSULATED FOR EXTERIOR EXPOSURE INCLUDING 2" FIBERGLASS BOARD INSULATION.WITH STAGGERED JOINTS AND FIELD APPLIED ALUMINUM JACKET. VAPOR BARRIER REQUIRED. 2 EXPOSED ROOF DUCTS MUST BE HUNG, SUPPORTED, AND SECURED TO WITHSTAND ADDITIONAL LOADS, INCLUDING SNOW ACCUMILATION AND 30 MPH WIND FORCES. JACKETING/INSULATION ON TOP OF DUCTS SHOULD BE SUPPORTED PER DETAILS TO PREVENT WATER ACCUMILATION. 3 REFRIGERANT PIPING DOWN THROUGH ROOF. REFER TO VRF PIPING DIAGRAMS FOR PIPE SIZES. PROVIDE ROOF CURB AT REFRIGERANT PIPING ROOF PENETRATIONS. 4MOUNT AT 8'-0" A.F.F. 5 SUPPLY AND EXHAUST DUCTWORK DOWN THROUGH ROOF TO SERVE FIRST AND SECOND FLOOR. 6 INSTALL CONDENSING UNITS ON CURB RAILS. 7 SEMI-RECESSED ELECTRIC WALL HEATER. MOUNT AT 12" A.F.F. TO BOTTOM OF HEATER. 8 SEAL EXHAUST FAN DUCT PENETRATION WATERTIGHT. 9 FLUE FROM WOOD BURNING FIRE PLACE. 10 INSTALL BOTTOM OF LOUVER AT 8'-6" A.F.F. INTERLOCK MOTORIZED DAMPER WITH EF-3. 11 REFRIGERANT PIPING ROUTED AS HIGH AS POSSIBLE. COORDINATE PIPING WITH ALL OTHER TRADES. REFER TO VRF PIPING DIAGRAMS FOR PIPE SIZES. 12 ELEVATOR VENT EQUAL TO GREENHECK PEV-400. 13 PROVIDE FIRE DAMPER AND DUCT ACCESS PANEL WHERE SUPPLY AND EXHAUST DUCTS PENETRATE DOGHOUSE WALL. 14 TERMINATE FLUE AT SIDEWALL WITH VENT HOOD. PAINT TO MATCH WALL. NO. DATE DESCRIPTION 6 10/23/19 MISC. CHANGES