Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
M2-01-MECHANICAL-PIPING-FLOOR-PLAN-LEVEL-1-Rev.2
UP24" x 42"24" x 36"24" x 42"18" x 42"18" x 42"18" x 48"18" x 36"18" x 42"18" x 48"24" x 36"24" x 36"24" x 36"18" x 42"18" x 42"18" x 42"18" x 48"14" x 60"18" x 30"18" x 36"18" x 30"18" x 48"18" x 48" 18" x 48"21" x 48"21" x 42"24" x 42" 24" x 36"24" x 60"24" x 42"SB SB SBTTTTTTTTTTTTTTT TTTTTTCAN154RECYCLING153STAIR #11ST1HOTEL KITCHEN140COLD STOR151VESTIBULE150DRY STOR149RESTAURANT & BAR145PRIVATE DINING152COVERED DINING146MONON ENTRY143VESTIBULE144MEN147WOMEN148MONON LOBBY102ELEVATOR LOBBY108COLLECTION141HOLDING132CORRIDOR139SECURITY133STOR142WORK131SOILED128SALES129SALES130FIRE PUMP138CLEAN127HR126CORRIDOR121MDF123ELEC156EMER POWER155STAIR #21ST2VESTIBULE157BREAK ROOM125CORRIDOR120CORRIDOR122SERVICE114GREEN115UNISEX TLT116MEN'S LOCKER134WOMEN'S LOCKER135SERVICE136FEINSTEIN'S CLUB110VESTIBULE113BAR112OFFICE117CLUB OFFICE119HOUSEKEEPING118CHEM159CLUB STOR124HK STORAGE160PRIVATE DINING111RECEPTION109VESTIBULE106COATS & STORAGE107RAMP105JAN.158WOMEN104MEETING101EAC-1DS-1DS-2DS-3EPUH-1VRF-1-22EUH-1EUH-2EF-1VRF-1-20VRF-1-21VRF-1-18VRF-1-19VRF-1-17VRF-1-02VRF-1-04VRF-1-08VRF-1-06VRF-1-07VRF-1-16VRF-1-15VRF-1-12VRF-1-10VRF-1-09VRF-1-11VRF-1-13VRF-1-14VRF-1-01EWH-5EWH-14EWH-7EWH-6EWH-8EWH-4EWH-1EWH-2EWH-35811111217212123232626282830303232DDFFJLLPT11YYUUAA941818KNN7WW3131RR2016151529292727252514613EGGXSV223102224BBQMZZ1919CH9.2L.5A.70.96.7BSB-2-2BVRF-1-05BSB-1-1ABSB-1-1BVRF-1-11VRF-1-09VRF-1-13VRF-1-14VRF-1-10VRF-1-07VRF-1-06VRF-1-05VRF-1-16VRF-1-15VRF-1-02VRF-1-01VRF-1-04VRF-1-08VRF-1-17VRF-1-19VRF-1-18VRF-1-21VRF-1-20VRF-1-22121212121212121212121212121212121212121233COCOCOCOCOCOCOCOCOCOCOCOCOCOBSB-1-1C3668849779VRF-1-1238591 1/2" CD1 1/2" CD1 1/2" CD1" CD1" CD1" CD1" CD1 1/4" CD1 1/2" CD1 1/4" CD1" CD1" CDVRF-1-0388GENERAL NOTES:1. REFER TO M0-01 FOR ADDITIONAL GENERAL NOTES.2. REFER TO PIPING PLANS FOR THERMOSTAT LOCATIONS.3. REFER TO M6-01 FOR VRF PIPE SIZES.4. REFER TO M0-01 FOR INSULATION NOTES.DRAWING NO.DATEGSB PROJECT NO.DRAWING TITLE3555 NW 58TH StreetSuite 700-WOklahoma City, OK 73112T: 405.848.9549F: 405.848.9783www.gsb-inc.comCopyright ©GSB, Inc M2-0103/22/19MECHANICAL PIPINGFLOOR PLAN LEVEL 1171528CARMEL, INCARMEL, INHOTELCARMICHAELAT CITYCENTER2018ARCHITECTGSB, INC3555 NW 58th Street, Suite 700WOklahoma City, OK 73112405 / 848-9549CIVIL ENGINEERCircle Design Group9229 Delegates Row, Suite 150Indianapolis, IN 46240317 / 706-2075STRUCTURAL ENGINEERStructurePoint7260 Shadeland StationIndianapolis, IN 46256317 / 547-5580MEP ENGINEERDEEM6831 E. 32nd Street, Suite 200Indianapolis, IN 46226317 / 860-2990INTERIOR DESIGNERHBA Hirsch Bedner Associates171 17th Street NW, Suite 600Atlanta, GA 30363404 / 873-4379FOOD SERVICE CONSULTANTRicca Design Studios5325 South Valentia WayGreenwood Village, CO 80111303 / 928-1333NORTH 1/8" = 1'-0"M2-011MECHANICAL PIPING FLOOR PLAN LEVEL 1# PLAN NOTES:1 VRV CONCEALED DUCT MOUNTED FAN COIL UNIT. COORDINATE INSTALLATIONWITH LIGHTS, PLUMBING, TECHNOLOGY SYSTEMS, SPRINKLERS ANDSTRUCTURAL STEEL. INSTALL VRV UNITS PER MANUFACTURERSRECOMMENDATIONS.2 FINAL PIPING CONNECTIONS TO FAN COIL UNIT PER MANUFACTURERSSUBMITTAL AND RECOMMENDATIONS.3 VRV BRANCH SELECTOR BOX LOCATED ABOVE THE CEILING. INSTALL BRANCHSELECTOR BOX PER MANUFACTURERS RECOMMENDATIONS. WHERE BRANCHSELECTOR IS INSTALLED ABOVE A HARD CEILING, AN ACCESS PANEL ISREQUIRED.4 LIQUID, SUCTION, AND HOT GAS REFRIGERANT LINES FROM ROOF MOUNTEDCONDENSING UNITS. REFER TO M1-07 FOR CONDENSING UNIT LOCATIONS.5 DX SPLIT REFRIGERANT PIPING UP INTO MECHANICAL ROOM ABOVE. REFER TOSHEET M4-03 FOR CONTINUATION.6 1-1/2" CONDENSATE RISER FROM ABOVE.7 TERMINATE CONDENSATE DRAIN LINE 2" ABOVE FLOOD LEVEL OF MOP BASIN.FASTEN CONDENSATE LINE TO WALL WITH PADDED PIPE CLAMPS.8 TERMINATE CONDENSATE DRAIN LINE AT FLOOR DRAIN.9 CONDENSATE DRAIN LINES FROM INDIVIDUAL FAN COIL UNITS TO BE 1" UNLESSNOTED OTHERWISE, TYP.NO. DATE DESCRIPTION4 05/29/2019 VRF REVISIONS8 12/10/2019 MISC. CHANGES