Loading...
HomeMy WebLinkAboutM2-02-MECHANICAL-PIPING-FLOOR-PLAN-LEVEL-2-Rev.3DNTTTTTTTTTTTTTTTTTTTMECHANICAL248STAIR #12ST1SERVICE236CORRIDOR235BALLROOM246PREFUNCTION242WOMEN238MEN239HOLDING KITCHEN237JAN245CORRIDOR234BELL ACCESS233ELEVATOR LOBBY208STORAGE241COATS240BREAKOUT243MEETING201COVERED PORCH205CART STOR.216LOBBY202CART STOR.216VESTIBULE204CART STOR209LOBBY BAR207CORRIDOR203LIBRARY210BOARDROOM211REVENUE214GM212VEST213FURNITURE STORAGE217F&B219CATERING218CORR220CORRIDOR247LUGGAGE232F.O. MANAGER231VEST228WORK227UNISEX225RETAIL226SERV229WELCOME DESK230WOMEN223JAN224MEN222VEST221STAIR #22ST2VEST215A/V ROOM244VRF-2-04VRF-2-10VRF-2-09VRF-2-11VRF-2-03VRF-2-02VRF-2-08VRF-2-06VRF-2-05VRF-2-01VRF-2-15VRF-2-12DS-4VRF-2-14VRF-2-16VRF-2-17VRF-2-19VRF-2-13VRF-2-18VRF-2-07EBH-1EBH-2EBH-3ERH-1ERH-2ERH-35811111217212123232626282830303232DDFFJLLPT11YYUUAA941818KNN7WW3131RR2016151529292727252514613EGGXSV223102224BBQMZZ1919CH9.2L.5A.70.96.7BSB-2-2AVRF-2-03VRF-2-10VRF-2-09VRF-2-04VRF-2-11VRF-2-01VRF-2-12VRF-2-15VRF-2-14VRF-2-16VRF-2-17VRF-2-19VRF-2-18VRF-2-13VRF-2-08VRF-2-02VRF-2-06VRF-2-05VRF-2-0712121212121212121212121212121212121212333COCOCOCOCOCOCOCOCOCOCOCOCO556666547668666666666666687861 1/2" CD1 1/2"1 1/2"BSB-2-1BBSB-2-1A991010111212888888GENERAL NOTES:1. REFER TO M0-01 FOR ADDITIONAL GENERAL NOTES.2. REFER TO PIPING PLANS FOR THERMOSTAT LOCATIONS.3. REFER TO M6-01 FOR VRF PIPE SIZES.4. REFER TO M0-01 FOR INSULATION NOTES.DRAWING NO.DATEGSB PROJECT NO.DRAWING TITLE3555 NW 58TH StreetSuite 700-WOklahoma City, OK 73112T: 405.848.9549F: 405.848.9783www.gsb-inc.comCopyright ©GSB, Inc M2-0203/22/19MECHANICAL PIPINGFLOOR PLAN LEVEL 2171528CARMEL, INCARMEL, INHOTELCARMICHAELAT CITYCENTER2018ARCHITECTGSB, INC3555 NW 58th Street, Suite 700WOklahoma City, OK 73112405 / 848-9549CIVIL ENGINEERCircle Design Group9229 Delegates Row, Suite 150Indianapolis, IN 46240317 / 706-2075STRUCTURAL ENGINEERStructurePoint7260 Shadeland StationIndianapolis, IN 46256317 / 547-5580MEP ENGINEERDEEM6831 E. 32nd Street, Suite 200Indianapolis, IN 46226317 / 860-2990INTERIOR DESIGNERHBA Hirsch Bedner Associates171 17th Street NW, Suite 600Atlanta, GA 30363404 / 873-4379FOOD SERVICE CONSULTANTRicca Design Studios5325 South Valentia WayGreenwood Village, CO 80111303 / 928-1333NORTH 1/8" = 1'-0"M2-021MECHANICAL PIPING FLOOR PLAN LEVEL 2# PLAN NOTES:1 VRV CONCEALED DUCT MOUNTED FAN COIL UNIT. COORDINATE INSTALLATIONWITH LIGHTS, PLUMBING, TECHNOLOGY SYSTEMS, SPRINKLERS ANDSTRUCTURAL STEEL. INSTALL VRV UNITS PER MANUFACTURERSRECOMMENDATIONS.2 FINAL PIPING CONNECTIONS TO FAN COIL UNIT PER MANUFACTURERSSUBMITTAL AND RECOMMENDATIONS.3 VRV BRANCH SELECTOR BOX LOCATED ABOVE THE CEILING. INSTALL BRANCHSELECTOR BOX PER MANUFACTURERS RECOMMENDATIONS.4 LIQUID, SUCTION AND HOT GAS REFRIGERANT LINES FROM ROOF MOUNTEDCONDENSING UNITS. REFER TO M1-07 FOR CONDENSING UNIT LOCATIONS.5 DX SPLIT REFRIGERANT PIPING UP TO CONDENSING UNIT ON ROOF. REFER TOM2-03.6 1-1/2" CONDENSATE RISER FROM ABOVE.7 TERMINATE CONDENSATE DRAIN LINE 2" ABOVE FLOOD LEVEL OF MOP BASIN.FASTEN CONDENSATE LINE TO WALL WITH PADDED PIPE CLAMPS.8 CONDENSATE DRAIN LINES FROM INDIVIDUAL FAN COIL UNITS TO BE 1" UNLESSNOTED OTHERWISE, TYPICAL.9 CENTER TO TRIM. REFER TO PA-EL10.0.10 CENTER TO TRIM. REFER TO PA-EL2.0.11 CENTER TO TRIM. REFER TO PA-EL7.1.12 CENTER TO TRIM. REFER TO PA-EL6.0.NO. DATE DESCRIPTION3 05/08/2019 VRF REVISIONS8 12/10/2019 MISC. CHANGES8