Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
M2-05-MECHANICAL-PIPING-FLOOR-PLAN-LEVEL-5-Rev.1
TTTTT TTTTTTTT TTT T T T T T T T T T T TTTTTTT TT STAIR #1 5ST1 MECH 504 GUESTROOM KING 513 CORRIDOR 503 GUESTROOM KING STUDIO 510 GUESTROOM KING STUDIO 511 GUESTROOM LUXURY SUITE B 512 GUESTROOM QQ 514 GUESTROOM KING 516 GUESTROOM KING 515 GUESTROOM KING 517 GUESTROOM KING 518 GUESTROOM KING 519 CORRIDOR 502 ELEVATOR LOBBY 508 ELEC 506 HOUSEKEEPING 507GUESTROOM KING 520 ADA COMM. GUESTROOM LUXURY SUITE A 521 ADA GUESTROOM QQ 522 GUESTROOM KING 523 GUESTROOM KING 524 GUESTROOM KING 525 GUESTROOM KING 526 GUESTROOM QQ W/ ADA COMM. 528 GUESTROOM KING 530 GUESTROOM KING 532 GUESTROOM KING 534 GUESTROOM KING 536 GUESTROOM QQ W/BALCONY 538 GUESTROOM QQ 540 CORRIDOR 501 VEST 505 STAIR #2 5ST2 ADA GUESTROOM JUNIOR SUITE 539 GUESTROOM KING 537 GUESTROOM KING 535 GUESTROOM KING 533 GUESTROOM KING W/ ADA COMM. 531 GUESTROOM KING 529 GUESTROOM KING 527 FCU-B FCU-B FCU-B FCU-B FCU-B DS-7 EWH-12 EWH-11 2 M4-01 3 M4-01 1 M4-01 1 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-012 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-011 M4-02 2 M4-02 2 M4-01 2 M4-01 4 M4-016 M4-01 5 M4-01 2 M4-01 2 M4-01 5 8 11 11 12 17 21 21 23 23 26 26 28 28 30 30 32 32 D D F F J L L P T 1 1 Y Y U U A A 94 18 18 K N N 7 W W 31 31 R R 201615 15 29 29 27 2725 25 146 13 E G G XX S V 2 2 3 10 22 24 B B Q M ZZ 19 19 C H 9.2 L.5 A.7 6.7 FCU-BFCU-BFCU-BFCU-BFCU-BFCU-B FCU-B FCU-AFCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-BFCU-B FCU-B FCU-B FCU-BFCU-B FCU-B FCU-B FCU-BFCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-BFCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-A FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-BFCU-B 1 2 3 444444444444 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 1 212121212121212121212 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 5 6 3333 333333 3 3 3 3 3 3 3 3 3 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD BSB-5-1 1 1/4" CD1 1/4" CD1 1/4" CD1 1/4" CD1 1/4" CD1 1/4" CD1 1/4" CD 1 1/4" CD 1 1/4" CD BSB-5-2 BSB-5-3 5 5 6 3 BSB-5-4 5 6 6 6 FCU-B GENERAL NOTES: 1. REFER TO M0-01 FOR ADDITIONAL GENERAL NOTES. 2. REFER TO PIPING PLANS FOR THERMOSTAT LOCATIONS. 3. REFER TO M6-01 FOR VRF PIPE SIZES. 4. REFER TO M0-01 FOR INSULATION NOTES. DRAWING NO. DATE GSB PROJECT NO. DRAWING TITLE 3555 NW 58TH Street Suite 700-W Oklahoma City, OK 73112 T: 405.848.9549 F: 405.848.9783 www.gsb-inc.com Copyright © GSB, Inc M2-05 03/22/19 MECHANICAL PIPING FLOOR PLAN LEVEL 5 171528 CARMEL, INCARMEL, IN HOTEL CARMICHAEL AT CITY CENTER 2018 ARCHITECT GSB, INC 3555 NW 58th Street, Suite 700W Oklahoma City, OK 73112 405 / 848-9549 CIVIL ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 STRUCTURAL ENGINEER StructurePoint 7260 Shadeland Station Indianapolis, IN 46256 317 / 547-5580 MEP ENGINEER DEEM 6831 E. 32nd Street, Suite 200 Indianapolis, IN 46226 317 / 860-2990 INTERIOR DESIGNER HBA Hirsch Bedner Associates 171 17th Street NW, Suite 600 Atlanta, GA 30363 404 / 873-4379 FOOD SERVICE CONSULTANT Ricca Design Studios 5325 South Valentia Way Greenwood Village, CO 80111 303 / 928-1333 NORTH 1/8" = 1'-0"M2-05 1 MECHANICAL PIPING FLOOR PLAN LEVEL 5 # PLAN NOTES: 1 VRV CONCEALED DUCT MOUNTED FAN COIL UNIT. COORDINATE INSTALLATION WITH LIGHTS, PLUMBING, TECHNOLOGY SYSTEMS, SPRINKLERS AND STRUCTURAL STEEL. INSTALL VRV UNITS PER MANUFACTURERS RECOMMENDATIONS. 2 FINAL PIPING CONNECTIONS TO FAN COIL UNIT PER MANUFACTURERS SUBMITTAL AND RECOMMENDATIONS. 3 1-1/4" CONDENSATE RISER. 4 CONDENSATE DRAIN ROUTED ABOVE CEILING. SLOPE CONDENSATE 1/8" PER 1'-0". COORDINATE ROUTING OF CONDENSATE DRAIN WITH ALL OTHER TRADES AND STRUCTURAL STEEL. 5 VRV BRANCH SELECTOR BOX LOCATED ABOVE THE CEILING. WHERE BRANCH SELECTOR IS INSTALLED ABOVE A HARD CEILING, AN ACCESS PANEL IS REQUIRED. INSTALL BRANCH SELECTOR BOX PER MANUFACTURERS RECOMMENDATIONS. 6 REFRIGERANT PIPING FROM CONDENSUNG UNIT ON ROOF. REFER TO SHEET M1-07. NO. DATE DESCRIPTION 6 10/23/19 MISC. CHANGES