Loading...
HomeMy WebLinkAboutM2-06-MECHANICAL-PIPING-FLOOR-PLAN-LEVEL-6-Rev.1T TT TT TT T TTTTTTTTTTTTT T TTTTTTTTTTTTT STAIR #1 6ST1 MECH 604CORRIDOR 603 GUESTROOM KING 613 GUESTROOM KING STUDIO 610 GUESTROOM KING STUDIO 611 ADA COMM. GUESTROOM LUXURY SUITE B 612 GUESTROOM KING 614 GUESTROOM KING 616 GUESTROOM KING 615 GUESTROOM KING W/ ADA COMM. 617 GUESTROOM KING 618 GUESTROOM KING 619 ELEVATOR LOBBY 608 ELEC 606GUESTROOM KING 620 HOUSEKEEPING 607 GUESTROOM KING 627 ADA GUESTROOM LUXURY SUITE A 621 GUESTROOM QQ 622 GUESTROOM KING 623 GUESTROOM KING 624 GUESTROOM KING 625 CORRIDOR 602 CORRIDOR 601 GUESTROOM KING 626 GUESTROOM QQ 628 GUESTROOM KING 630 GUESTROOM KING 632 GUESTROOM KING 634 GUESTROOM KING 636 GUESTROOM QQ W/BALCONY 638 GUESTROOM QQ W/ ADA COMM. 640 STAIR #2 6ST2 GUESTROOM JUNIOR SUITE 639 GUESTROOM KING 637 GUESTROOM KING 635 GUESTROOM KING 633 GUESTROOM KING 631 GUESTROOM KING 629 FCU-B BSB-6-3 BSB-6-2 BSB-6-4 FCU-B FCU-B FCU-B FCU-B BSB-6-1 DS-8 2 M4-01 3 M4-01 1 M4-01 1 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-01 2 M4-011 M4-02 2 M4-02 2 M4-01 2 M4-01 4 M4-01 6 M4-01 5 M4-01 2 M4-01 5 M4-01 5 8 11 11 12 17 21 21 23 23 26 26 28 28 30 30 32 32 D D F F J L L P T 1 1 Y Y U U A A 94 18 18 K N N 7 W W 31 31 R R 201615 15 29 29 27 2725 25 146 13 E G G X S V 2 2 3 10 22 24 B B Q M ZZ 19 19 C H 9.2 L.5 A.7 6.7 FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-BFCU-B FCU-B FCU-B FCU-B FCU-BFCU-BFCU-BFCU-BFCU-BFCU-B FCU-C FCU-A FCU-B FCU-B FCU-BFCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-B FCU-BFCU-BFCU-BFCU-B FCU-BFCU-B FCU-BFCU-B FCU-B FCU-B FCU-B FCU-B FCU-BFCU-BFCU-B FCU-A FCU-B FCU-BFCU-B FCU-B FCU-B FCU-B FCU-B FCU-BFCU-B FCU-BFCU-B FCU-B FCU-B FCU-B FCU-B 1 2 3 444444444444 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 1 212121212121212121212 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 5 6 3333 333333 3 3 3 3 3 3 3 3 3 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD1 1/4" CD 1" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD 1 1/4" CD1 1/4" CD1 1/4" CD1 1/4" CD1 1/4" CD1 1/4" CD1 1/4" CD 1 1/4" CD 1 1/4" CD 3 6 5 5 5 6 6 6 FCU-C GENERAL NOTES: 1. REFER TO M0-01 FOR ADDITIONAL GENERAL NOTES. 2. REFER TO PIPING PLANS FOR THERMOSTAT LOCATIONS. 3. REFER TO M6-01 FOR VRF PIPE SIZES. 4. REFER TO M0-01 FOR INSULATION NOTES. DRAWING NO. DATE GSB PROJECT NO. DRAWING TITLE 3555 NW 58TH Street Suite 700-W Oklahoma City, OK 73112 T: 405.848.9549 F: 405.848.9783 www.gsb-inc.com Copyright © GSB, Inc M2-06 03/22/19 MECHANICAL PIPING FLOOR PLAN LEVEL 6 171528 CARMEL, INCARMEL, IN HOTEL CARMICHAEL AT CITY CENTER 2018 ARCHITECT GSB, INC 3555 NW 58th Street, Suite 700W Oklahoma City, OK 73112 405 / 848-9549 CIVIL ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 STRUCTURAL ENGINEER StructurePoint 7260 Shadeland Station Indianapolis, IN 46256 317 / 547-5580 MEP ENGINEER DEEM 6831 E. 32nd Street, Suite 200 Indianapolis, IN 46226 317 / 860-2990 INTERIOR DESIGNER HBA Hirsch Bedner Associates 171 17th Street NW, Suite 600 Atlanta, GA 30363 404 / 873-4379 FOOD SERVICE CONSULTANT Ricca Design Studios 5325 South Valentia Way Greenwood Village, CO 80111 303 / 928-1333 NORTH 1/8" = 1'-0"M2-06 1 MECHANICAL PIPING FLOOR PLAN LEVEL 6 # PLAN NOTES: 1 VRV CONCEALED DUCT MOUNTED FAN COIL UNIT. COORDINATE INSTALLATION WITH LIGHTS, PLUMBING, TECHNOLOGY SYSTEMS, SPRINKLERS AND STRUCTURAL STEETL. INSTALL VRV UNITS PER MANUFACTURERS RECOMMENDATIONS. 2 FINAL PIPING CONNECTIONS TO FAN COIL UNIT PER MANUFACTURERS SUBMITTAL AND RECOMMENDATIONS. 3 1-1/4" CONDENSATE RISER. 4 CONDENSATE DRAIN ROUTED ABOVE CEILING. SLOPE CONDENSATE 1/8" PER 1'-0". COORDINATE ROUTING OF CONDENSATE DRAIN WITH ALL OTHER TRADES AND STRUCTURAL STEEL. 5 VRV BRANCH SELECTOR BOX LOCATED ABOVE THE CEILING WHERE BRANCH SELECTOR IS INSTALLED ABOVE A HARD CEILING, AN ACCESS PANEL IS REQUIRED. CONTRACTOR TO INSTALL BRANCH SELECTOR BOX PER MANUFACTURERS RECOMMENDATIONS. 6 REFRIGERANT PIPING FROM CONDENSUNG UNIT ON ROOF. REFER TO SHEET M1-07. NO. DATE DESCRIPTION 6 10/23/19 MISC. CHANGES