Loading...
HomeMy WebLinkAboutP000.2CW GAS HWR HW � � �� GM � � lyl Q SYM BOLS PIPWG LINETYPES COLD WATER DOMESTIC GAS NATURAL OR PROPANE HEATMG WATER RETURN �OMESTIC HEATMG WATER SUPPLV DOMESTIC PIPING SYMBOLS ANCHOR/HANGER BALLVALVE CHECK, SWING VALVE DROP GAS METER BALANCWG VALVE P'TRAP PEN�ANT STYLE FIRE SUPPRESSION HEA� PIPE GUI�E PITCH �OWN IN �IRECTION OF ARROW PLUG VALVE PRESSUREGAUGE RISER RUN OUT OFF BOTTOM OF MAIN RUN OUT OFF TOP OF MAIN TEE OFF SI�E OF MAIN TEST PLUG THERMOMETER UNION WATER METER "Y" STRAMER ABBREVIATIONS AFF BTUH CO CW EC FD FT FS GC GM GPM GL HW HWR IN LAV MAN MFR MC MS PC PD PRV P51 RPM RPZB snN SK TMV �oN UR VIF V�R WC WH ABOVE RNISHED FLOOR BRITISH THERMAL UNIT PER HOUR CLEAN OUT COLD WATER ELECTRICALCONTRACTOR FLOOR DRAIN FEET FLOOR SINK GENERALCONTRACTOR GAS METER GALLONS PER MINUTE GREASE LINE HOT WATER HOT WATER RETURN INCH LAVATORY MANUAL MANUFACTURER MECHANICALCONTRACTOR MOP SINK PLUMBING CONTRACTOR PRESSUREDROP PRESSURE RELIEF VALVE POUNDS PER SQUARE INCH REVOLUTIONS PER MINUTE REDUGED PRESSUREZONED BAGKFLOW SANITARY SEWER SINK THERMAL MIXING VALVE UNLESS OTHERWISE NOTED URINAL VERIFY IN FIELD VENTTHORUGH ROOF WATER CLOSET WATER HEATER RELEASED FOR CONSTRl1CTI0N Su6jec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel `�j sv�� �\o�v�AWnT � � DATE: OZ�O4�20 PLUMBING SPECIFICATIONS GENERAL 1. BI� INSTRUCTIONS: CONTRACTORS SHALL PROVI�E BASE BI� IN STRICTACCORDANCE WITH DESIGN BASIS EQUIPMENTAND MATERIALS. PROJECT DOES ENCOURAGE COMPETITIVE PRIQNG AND ALLOWS FOR SUBSTITUTIONS OF EpUAL EpUIPMENT AND MATERIALSAGAINSTTHEBASISOFDESIGN. Sl1BSTITUTEITEMS WILL BE COMPARED AGAINST DESIGN BASIS DURMG SUBMITTAL PROCESS ENGMEER RESERVES THE RIGHT TO REJECT SUBSTITUTIONS FOUND NOTTO BE EpUAL TO ITEMS LISTED IN DESIGN BASIS. 2 PRIORTOPROCUREMENTCONTRACTORSHALLSUBMITTO ARCHITECT FULL SUBMITTALS FOR ALL ENERGY CONSUMMG OR PRODUCING ITEMS AND FOR ALL PLUMBING FlXTURES, VALVES, DRAINS, QEAN OUTS, PIPING, PIPING ACCESSORIES, INSULATION AND PIPWG HANGERS. SUBMITTALS SHALL BE DELINEATED WITH TAGS INDICATED ON PRINTS, CONTRACTORS NAME, PROJECT NAME. QEARLY INDICATE ALL MODEL NUMBERS AND ALL ACCESSORIES AND OPTIONS BEING PROVIDED. SUBMISSIONS SHALL BE IN PDF FORMAT.ENGMEER RESERVES THE RIGHT TO REJECT ANY SUBSTITUTE ITEM. 3. CONTRACTORSHALLBERESPONSIBLETOVISITTHESITETO EXAMME ALL CONDITIONS THAT MAY IN ANY WAY AFFECT THE EXECUTION OF HIS WORK. HE SHALL ALSO EXAMME THE DRAWINGS AND SPEQFlCATIONS FOR OTHER BRANCHES OF WORK MAKING REFERENCE TO THEM FOR DETAILS OF EXISTWG BWLDMG CONDITIONS. NO EXTRAS WILL BE ALLOWED FOR FAILURE TO INCLUDE ALL RE�UIRED WORK IN THE BID. CONTRACTOR SHALL GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE. 4. THEDRAWWGSINTHISSECTIONAREDIAGRAMMATICANDARENOT INTENDED TO DEFlNE EXACT QUANTITIES, LOCATIONS OR CODIFlED REDUIREMENTS. DRAW INGS SHOW GENERAL INTENT OF SVSTEMS. P.C. SHALL PROVIDE AND PAV FOR ALL REpUIRED PERMITS. 5. UPONCOMPLETIONOFTHEPWMBINGINSTALLATION, �EMONSTRATE TO THE ENGINEER AN�IOR THE OWNER'S SATISFACTION THATTHE SYSTEMS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE DRAWINGS, SPEQFlCATIONS AND APPLICABLE CODES. DEMONSTRATE THE DYNAMIC OPERATION OF EACH SVSTEM. VERIFV PROPER OPERATION OF EQUIPMENT, FlLTERS ARE CLEAN AN� COMPONENTS OF THE SYSTEM ARE INSTALLED AND ADJUSTED M FULL ACCORDANCE W ITH MANUFACTURERRECOMMENDATIONS. 6. PWMBINGWORKSHALLBECOMPLETEMEVERYDETAILANDALL MISCELLANEOUS ITEMS OF MATERIAL AND LABOR NECESSARV TO COMPLETE THE WORK �ESCRIBE�, SHOWN OR REASONABLY IMPLIED ON DRAWINGS OR SPEQFlCATIONS SHALL BE INCLUDED IN THECONTRACT.CONTRACTORSHALLMAKEMINORADJUSTMENTS TO THE WORK WHERE REpUIRED, WHEN SUCH ADJUSTMENTS ARE NECESSARV FOR PROPER OPERATION AND WITHIN THE INTENT OF THE CONTRACT. CONTRACTOR SHALL GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO CONTRACT FOR A PERIOD OF ONE (1) VEAR FROM DATE OF ACCEPTANCE. ]. ALL WORK SHALL BE IN FULL ACCORDANCE WITH 2O121NDIANA PLUMBMG CODE QNTERNATIONAL PLUMB W G CODE 2006), 2010 INDIANA ENERGY CODE (200� ASHRAE 90.1), 2014 INDIANA FUEL GAS CODE (20121NTERNATIONAL FUEL GAS CODE) AND ALL PERTMENT STATE, COUNTY, CITY CODES AND ORDINANCES WITH INDIANA AMENDMENTS. B. PLUMBINGCONTRACTORSHALLACCEPTSOLEANDCOMPLETE RESPONSIBILITY FOR CONDITIONS OF THE JOB SITE, INCLUDMG SAFETV OF ALL PERSONS AND PROPERTV DURING PERFORMANCE OF THE WORK. 9. DURINGCONSTRUCTIONALLPWMBINGFIXTURES,TRIMANDOTHER EQUIPMENT SHALL BE PROTECTED AGAINST DAMAGE OR INJURY. ANV FlXTURES OR EDUIPMENT DAMAGED AND ANV TRIM WITH MARRED OR SCRATCHED FlNISH SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER. 10. PLUMBMG CONTRACTOR SHALL VERIFV AND BE RESPONSIBLE FOR ALL WATER, GAS, STORM AND SEWER UTILIiY ROUGH-INS AND SHALL CONSULT WITH THE CIVIL PLANS AND WITH LOCAL UTILITY COMPANV(S) PROVIDING ALL MATERIALS AND LABOR AND PAVING ALL COSTS NOT BORNE BV THE LOCAL 11TILITV COMPANV(S) FOR INSTALLATION OF SERVICES INCLUDMG SECURMG AND PAYMG FOR ALL REQUIRED PERMITS. 11. PLUMBINGCONTRACTORSHALLENSUREEMPLOVEESAREMEETING AND DOCUMENTING ALL OSHA AND JOB SPECIFIC SAFETY REQWREMENTS AS REQUIRED BV LAW AND BV CONTRACT. PERSONAL PROTECTNE EpUIPMENT SHALL BE PROVI�E� AN� UTILRED AS RE�UIRED. MECHANICAL CONTRACTOR SHALL PAY ALL FMES LEVIED BY OSHA FOR FAI W RE TO COMPLY W ITH OSHA REpUIREMENTS. 12. ALL PLUMBMG MATERIALS INSTALLED IN RETURN AIR PLENUMS SHALL BE INSTALLED OR COVERED WITH MATERIALS AS RE�UIRED TO PROVIDE FLAME RATING OF NOT MORE THAN 25AND A SMOKE DEVELOPED INDEXOF NOT MORE THAN 50. PRIOR TO ROUGH-IN CONSl1LT WITH M.C. TO VERIFVALL LOCATIONS OF RETl1RN AIR PLENl1MS. 13 FURNISH AND INSTALL ACCESS PANELS FOR ALL CONCEALED EpUIPMENT, PIPING VALVES, QEANOUTS, ETC. ACCESS PANELS SHALL BE OF SUFFlQENT SRE TO PROVIDE ADEpUATE WORKING CLEARANCE AN D ACCESS. 14. PLUMBMGCONTRACTORSHALLBERESPONSIBLEFORALL REDUIRED CUTTING AND PATCHING INCLUDING SAW CUTTING AND PATCHING OF EXISTING FLOORS AS REpUIRED TO ACCEPT NEW FLOORING. 15. UNLESS OTHERWISE NOTE�, ROUTE ALL PIPMG AS HIGH AS POSSBLE AND ROUTE PERPENDICULAR ANDIOR PARALLEL TO BUILDING STRUCTURE. EpUIPMENT 1. PROVIDEEpUIPMENTASSHOWNONEOUIPMENTSCHEDULESAND PLAN NOTES. SU BSTITUTIONS TO LISTED EQUIPMENT SHALL BE AT RISK OF CONTRACTOR. SUBSTITUTIONS SHALL ONLY BE ALLOWED IF ITEMS ARE EDUAL IN ALL ASPECTS. 2. PROVIDE SUBMITTALS TO ELECTRIQAN AS REpUIRED FOR COORDINATION OF ALL REQWRED ELECTRICAL POWER WIRMG. INCLU�E WIRMG �IAGRAMS AN� CABLMG REpUIREMENTS FOR REFERENCE COORDINATE ALL INTERLOCKS AS NEEDED. PROVIDE SMGLE POINT CONNECTION KITS AS NEEDED. 3. INSTALL ALL EQUIPMENT IN FULL ACCORDANCE WITH MANUFACTURERSRECOMMENDATIONSAND QEARANCE REpUIREMENTS. PROVIDE ALL REpUIRED MOUNTING OR HOUSEKEEPING PADS. G.C. SHALL PROVIDE LEVEL GRADE FOR EXTERIOR MOUNTED EQUIPMENT. P.C. SHALL PROVIDE ALL HOIST W G AN� RIGGMG NEE�E� TO SET ALL PLUMBMG EpUIPMENT. 4. ALL EDUIPMENT SHALL BE INSTALLEDAS NEEDED TO PREVENT OBJECTIONABLE NOISEANDIOR VIBRATION. P.C. SHALL PROVIDE VIBRATION PADS, SPRING ISOLATORS, ATTENUATORS AND ACCESSORIES AS NEEDED. 5. PROVIDE ALL BLOCKING, HANGERS, SHELVES, BRACKETS ETC. AS RE�U IRED TO INSTALL ALL PLUMBING E�UIPMENT. 6. INSTALL WATER HEATERS IN ACCORDANCE WITH NFPA-]0, AND THE NATIONAL ELECTRICAL CODE. PROVIDE BRASS DRAIN VALVE, 3/4" RELIEF VALVE AND COLD WATER DIP Tl1BE. INSTALL HEATERS PER MANUFACTURES INSTALLATION INSTRUCTIONS. PROVIDE SHUT-0FF VALVES FOR SERVICE WORK. ]. THERMOSTATS ON WATER HEATER SHALL NOT BE USED FOR LIMITING HOT WATER TEMPERATURES. P.C. SHALL PROVI�E MIXMG VALVES FOR HOT WATER TO ALL HANDS-FREE FAUCETS ACCESSIBLE TO OCCUPANTS. MIXING VALVE SYSTEMS SHALL LIMIT WATER TEMPERATURE AT FAUCETS TO 110 DEG E OR LESS. 8. PROVIDESCHEDULE40PVCPIPMGANDFITTMGSFORALL COMBUSTION AIR AND VENT PIPMG IN ACCORDANCE W ITH MANUFACTURERS INSTRUCTIONS ON ALL DIRECT VENT WATER HEATERS OR BOILERS. FIXTURES 1. REFERENCE FIXTURE SCHEDl1LES ON PLANS AND PROVIDE ALL REpUIRE� CARRIERS, BLOCKMG, HANGERS, TAIL PIECES, TRAPS, RISERS,ESCUTCHEONS,GRIDS,PUTiY,GASKETS,CAULKING, ETC. AS REpUIRED TO INSTALL ALL P W MBING FIXTURES. 2. REVIEW SUBMITTALS FORALL OWNER PROVIDED EpUIPMENTAND PROVIDE ANV REQU IRED ACCESSORIES AS NEEDED FOR A WMPLETE INSTALLATION. P.G SHALL BE RESPONSIBLE TO RECEIVE AND INSTALL ALL OWNER PROVIDED FIXTURES. 3. FlXTURES DESIGNATED FOR HANDICAPACCESSIBILITYSHALL COMPLV WITH ANSI A 11].1, LATEST EDITION, INCW DMG ADOPTED INDIANA AMENDMENTS. 4. PROVIDE ALL CODE RE�UIRED BACKFLOW DEVICES FOR PROCESS HVAC EpUIPMENTAND FOR WATER SERVING ANV DRINKING OR FOOD PREPARATION FIXTURES. 5. PROVIDEBELLOWSTVPEWATERHAMMERARRESTERS,STAWLESS STEEL CASHING AND BELLOWS, 250 PSI, INSTALL PER PDI STANDARD WH2O1. PIPING 1. ALL EXPOSED SUPPLV PIPES AND METAL TRIM IN CONNECTION WITH THE FIXTURES SHALL BE CHROME PLATED RED BRASS OR BRONZE, PROVI�E CHROME PLATE� STOP VALVES IN ALL SUPPLIES TO ALL FlXTU RES. PLASTIC STOPS OR TRIM SHALL NOT BE ACCEPTABLE. CAULK ALL FlXTURES WITH WATERPRWF SILICONE CAULK. TRAPS SHALL HAVE CLEANOUT P W GS. INSTALL ONE PIECE CHROME ESCUTCHEON PLATE WITH SET SCREW AT WALL PENETRATIONS. 2. THE MINIMUM SLOPE OFA HORIZONTAL DRAINAGE PIPE SHALL BE: a. 1/4" PER FOOT FOR PIPES UP TO 2-1/2". b. 1/8" PER FOOT FOR PIPES 3" TO 6". c. ili6" PER FOOT FOR PIPES 8" OR LARGER. MAINS AN� LATERAL BRANCHES SHALL BE SLOPE� TO WAR� THE BWLDMG DRAIN. ALL PIPMG SHALL BE INSTALLED AND TESTED IN AC W RDANCE W ITH THE CURRENT PLUMBING W DE AND PER THE AUTHORITV HAVING JURISDICTION. 3. CLEAN OUTS SHALL BE INSTALLED WITH IN 5'OF THE FOUNDATIONS AND AT THE BASE OF EACH STORM AND WASTE STACK, AND AT NOT MORE THAN ]5 FOOT INTERVALS ON ALL HORIZONTAL RUNS, AT THE HIGH POINT OF THE BUILDING DRAIN AND PER THE CURRENT PW MBING CODE. 4. VERIFYLOCATION,DEPTHANDSIZEOFSANITARYSEWER CONNECTIONPOINTS. CONNECTASREQUIRED.OUTSIDESEWER SHALL BE INSTALLED WITH MINIMUM OF 3'-0" COVER. COORDINATE CONNECTIONS WITH SITE CONTRACTOR AND LOCAL UTILITV 5. ALL OUTSIDE WATER PIPING SHALL BE COVERED PER LOCAL REQl11REMENTS OR WITH A MINIMUM BELOW PREDICTED FROST LINE WHICH EVER IS GREATER. 6. ALL INTERIOR PIPING PENETRATIONS THROUGH WALLS, CEILINGS, ROOFS AND FLOORS SHALL BE SLEEVEDAND SEALED. PROVIDE UL LISTED FIRE STOPPING WHERE REpUIRED. ]. ALL EXTERIOR UN�ERGROUN� PENETRATIONS OF BWL�WG FOUNDATIONS OR SLAB FLOORS SHALL BE SLEEVEDAND SEALED. PENETRATIONS BELOW GRADE INTO THE BUILDING SHALL BE DONE WITH MECHANICAL SEALS LIKE "LINK SEAL" OR EpUAL. 8. ALL PIPING PASSING THROUGH CONCRETE OR CINDER WALLS OR Sl1BJECT TO EXPOSl1RE TO CONCRETE SHALL BE TAPED, SLEEVED OR INSULATE� TO PREVENT �IRECT CONTACT WITH CONCRETE. 9. NO PLUMBING PIPING SHALL PASS DIRECTLV OVER ELECTRICAL PANELS OR DISTRIBUTION CABWETS. PRIORTO ROUGH IN COORDINATE WITH E.C. 10. DIELECTRIC UNIONS SHALL BE USED TO CONNECT DISSIMILAR METALS OR METAL PIPING SHALL HAVE METAL CONNECTIONS ON EACH END THREADED TO MATCH THE ADJACENT PIPING. METAL COMPONENTS SHALL BE SEPARATED BV A NVLON INSULATOR TO PREVENTCURRENTFLOW BETWEENDISSIMILARMETALS. UNIONS SHALL BE SUITABLE FOR THE SYSTEM OPERATMG PRESSURES AND TEMPERATURE WELD TVPE: ASTM A-234. 11. PIPINGSLEEVES'INTERIOROREXTERIORABOVEGRADE' GAWANIZED-STEELPIPE SLEEVES OR PVC-PIPE SLEEVES. VERIFV WITH FIRE AUTHORITIES HAVMG JURIS�ICTION, THAT PVC MATERIALS ARE ALLOWED FOR SLEEVES. BELOW GRADE; ALL; MECHANICAL GALVAWZED-STEEL PIPE SLEEVE SYSTEM LIKE LINKSEAL. ALL SLEEVES SHALL BE FlRE STOPPED OR CAULKED. EXTERIOR SLEEVES SHALL PROVIDE WATER/AIR TIGHT PENETRATION SYSTEM. 12. PROVIDE HANGERS PER MSS AND IPC STANDARDS BASED ON PIPING TVPES AND SRES. WHERE EXPOSED TO VIEW IN PUBLIC SPACES, RODS SHALL BE GALVAWZED. 13. VALVES2"AN�SMALLERSHALLBELIKECRANE(3)PIECE3800 SERIES BALL OR 43B SERIES GATE VALVES.2-1/2" OR LARGER SHALL BE LIKE CRANE SERIES G3500 BALL OR 465 GATE VALVES. 14. UNIONS:PROVIDEANDINSTALLUNIONSASREpUIREDFORTHE INSTALLATION AND REMOVAL OFALL EQl11PMENT. 15. STOPS: ALL FIXTURES SHALL BE INSTALLED WITH METALa TURN CHROME PLATED PLUMBING STOPS COMPATIBLE WITH PIPING MATERIAL SERVMG FIXTl1RES. i6. PIPINGMATERIALSUNLESSOTHERWISENOTEDONTHEPLANS SHALL BEAS FOLLOWS: GAS ABOVEGRADE,2"ANDSMALLER;BLACKSTEELSCHEDULE 40 TYPE E OR S PIPE GRADE B; ASTM A53 / A53M, A105 OR A120 WITH THREADED ENDS; FITTMGS SHALL BE MALLEABLE IRON THREADED FlTTINGS ASTM Bi6.3 CLASS 150. WATER COPPERTUBINGQNSIDEBUILDING):ASTMB88,TVPE'L' HARD WATERTUBE DRAWN TEMPER. WITH CAST-COPPER SOLDER-JOINT FITTINGS: ANSI B16.18. OR W ROUGHT-COPPER SOL�ER JOINT FITTMGS: ANSI B16 22 WATER WHEREINDICATEDONTHEPLANS,WATERTUBINGSHALL BE TVPE A PEX W IRSBO, ZURN, NBCO, OR UPONOR CONFORMING TO ASTM F8]6, F8]], E84, E814, ANSINL 263 AND NSF14/61. 100 PSIG AT 180 DEG. B W E FOR COLD AND RE� FOR HOT AN� RE-CIRCULATION WHITE FOR GENERIC. FITTINGS SHALL BE PER ASTM F1960 LIKE UPONOR ProPEX COLD EXPANSION, PUSH TO FlT OR COPPER CRIMP WITH BRASS OR ENGWEERED PLASTIC FITTINGS. MANIFOLDS WHERE 11SED SHALL BE LIKE UPONOR ProPEX TVPE L TO ASTM FB�� W ITH BRASS OR EP BALL VALVES. WATER BUILDING MAINS AND RISERS OUTSIDE OF WATER ROOM 2" AND SMALLER: FLOW GUARD GOLD OR EpUAL SDR 11 CPVC; PIPING ASTM D 2846 WITH SOCKET WELDED FITTMGS ASTM F 493. MA�E FROM CPVC CELL CLASS 24448 ASTM D 1184. MANUFACTURED PER NSF 14 AND 61. PLUMBING INSULATION 1. ALL PIPING INSULATION MATERIALS SHALL HAVE A FLAME SPREAD RATMG OF 25 OR LESS (ON THE FLAME SPREAD TEST SCALE) AND SMOKE �EVELOPMENT OF 50OR LESS (ON THE SMOKE TEST SCALE) OR AS DEFINED BY NFPA 255 STANDARD M ETHOD OF TESTING OF SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS, LOCAL CODES AND LOCAL AUTHORITIES HAVING JURISDICTION. ALL PVC PIPMG LOCATED IN RETURN AIR PLENUM SPACES OR EXPOSED SHALLBEINSULATE�. 2. INSTALL ALL INSULATION IN STRICT ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS IN A TIGHT AND NEAT MANOR. NO SAGGWG, FRAVED OR TORN INSULATION WILL BE EXCEPTED. 3. ALLINSULATIONR-VAWESSHALLMEETTHECl1RRENTENERGV CODE REQUIREMENTS. UNLESS OTHERWISE NOTED ON PLANS PIPING SVSTEMS SHALL BE INSULATED AS FOLLOWS: a. HOT WATER REQRCULATION SYSTEMS; ALL HW AND HWR PIPING SHALL BE INSULATED b. NON RE-CIRCULATION HOT WATER STORAGE SVSTEMS; THE FlRST B FEET OF HW AND CW PIPING CONNECTED TO THE STORAGETANK. c. COPPER WATER PIPING; ALL PIPING HOT OR COLD SHALL BE INSULATED. d. HEATTRACEDPIPWGALLHEATTRACEDSECTIONS. e. PLASTIC PIPING BELOW GRADE; ALL HW, CW, HWR PIPING. EXCEPTIONS: THE TUBING FROM THE CONNECTION AT THE TERMINATION OF THE FlXTURE SUPPLV PIPING TO A PLUMBING FIXTl1RE OR P W MB W G APPLIANCE.PIP W G FROM USER-CONTROLLED SHO WER AND BATH MIXMG VALVES TO THE WATER OURETS. 4. STORM WATER PIPING EXPOSED IN BUILDING SHALL BE INSULATED FOR SOUND WITH MINIMUM �' THICK ELECTROMETRIC CLOSED CELL INSULATION. 5. INSULATION MATERIALS: a. PRE-FORMED TVPE I, 850 DEG F MINERAL OR GLASS FIBERS BON�E� WITH A THERMOSETTING RESIN AN� HINGE� WITH SELF SEALING LAP. COMPLV WITH ASTM C 54�, TVPE I, GRADEA, WITH FACTORY-APPLIEDASJ. b. FLEXBLE ELASTOMERIC CLOSED CELL OR EXPANDED Rl1BBER PIPE INSl1LATION WITH PRESSl1RE SENSITNE ADHESNE SYSTEM, ASTM C534, ASTM E84 CLASS A 300 DEG F. a EXTERIOPoEXPOSED JACKETS: W RESISTANT PVC PIPE JACKETS AND PREFORMED FlTTING COVERS COMPLIANT WITH ASTM D25], D638, D]90, D]92, Di]84, D36]9, E84 AND E136. FIRE STOPPING. a. FIRESTOPPMGSVSTEMSSHALLBEINFULLCOMPLIANCE W ITH SECTIONS �14 OF THE IBC AND SECTION 315 OF THE IPC. b. CONTRACTORSHALLMAKEREFERENCETOARCHITECTURAL PLANS AN� PROVI�E ALL REpUIRE� FIRE STOPPMG SVSTEMS. a CONTRACTORSHALLPROVIDEAHJWITHFULLSUBMITTAL INDICATING METHODS OF CONSTRUCTION AND UL LISTINGS FOR EACH REQUIRED FIRE STOP SYSTEM. d. ACCESS DOORS REQUIRED IN CEILINGS OF FIRE-RESISTANCE-RATED FLOOR/CEILMG AND ROOF/CEILMG ASSEMBLIES SHALL BE TESTED IN ACCORDANCE WITH ASTM E 119 OR U L 263 AS HORIZONTAL ASSEMBLIES AND LABELED BY AN APPROVED AGENCY FOR SUCH PURPOSE. CHECK TEST AND START UP REQUIREMENTS 1. LABEL ALL MAJOR PIECES OF EQUIPMENT WITH LAMACOID PLASTIC, BLACK WITH WHITE LETTERS. SIZE TO BE CONSISTENT WITH EpUIPMENT BEING LABELED. LENGTH AND WIDTH VARV FOR REQUIREDLABEL CONTENT. 2 PLUMBWGCONTRACTORSHALLFURNISHALLTOOLS,INSTRUMENTS AND EDUIPMENT REDUIRED FOR TESTING PIPING. ALL TESTING SHALLBEDONEPRIORTOCONCEALMENT. ALLPARTSOFTHE SANITARY DRAINAGE SYSTEM SHALL BE TESTED AS REpUIRED BY LOCAL PWMBMG INSPECTORS. ALL WATER PIPMG SHALL BE HYDROSTATICALLY TESTED TO MINIMUM 125 PSIG. 3. CLOSE OUT: PROVIDE MANUFACTURERS OPERATION AND MAINTENANCE MANUALS AND AS BUILT DRAWINGS. PROVIDE (1) TRAINING SESSION TO OWNER SELECTED PERSONNEL AS REpUESTE� AN� PROVI�E WARRANTY INFORMATION FOR ALL MANUFACTURERS WARRANTED EQUIPMENT 4 FlLL SVSTEMS WITH FRESH WATERAND INSPECTALL CONNECTIONS FOR LFAKAGE REMOVE ALL PACKING AND PROTECTIVE SHIPPING MATERIALS. CLEAN ALL FIXTl1RES AND START-l1P ALL WATER HEATERS, PUMPS, AND EQUIPMENT. VERIFV PROPER OPERATION. OPERATE ALL FAUCETS AND INSPECT STOPS, RISERS, TRAPS AN D DRAINS. CORRECT ALL LEAKS, WATER HAMMER AND VIBRATIONS AS REpUIRED. c� z W � � W Z (9 z � W . � � � W � Q i... � ..� O _ ......._ _...� ' U u�i � � � T N V! � >N N Q W > � � °b � � N � (p y � � r � � C t0 W � � d' C �� p� � W O a�Z Nn � ❑ U U � � n � Oa � W � O M M'O U` � � Q d LL W OWNER: RANGELINE CHIROPRACTIC XXX CARMEL, IN CONTRACTOR: ALT CONSTRUCTION 10650 N BENNET PKWV SUITE:200 ZIONSVILLE, IN 46011 ARCHITECTURE: ALO PROPERTY GROUP 90]5 N MERIDIAN ST, SUITE 1]5 INDIANAPOLIS, IN 46260 MEP: DESIGN BUILD U � U � � I U W Z J W QN L.L Z O � Q � O W I..L LL 0 1..� � Z No. 10200395 � � Q Z Q O � � � W J Y� N � N Q �U C��\i/��� �/ C �2-�a-2o�g PLUMBING ABBREVIATIONS, SYMBOLS, & SPECIFICATIONS P001