SYM BOLS
PIPWG LINETYPES
COLD WATER DOMESTIC
GAS NATURAL OR PROPANE
HEATMG WATER RETURN �OMESTIC
HEATMG WATER SUPPLV DOMESTIC
PIPING SYMBOLS
ANCHOR/HANGER
BALLVALVE
CHECK, SWING VALVE
DROP
GAS METER
BALANCWG VALVE
P'TRAP
PEN�ANT STYLE FIRE SUPPRESSION HEA�
PIPE GUI�E
PITCH �OWN IN �IRECTION OF ARROW
PLUG VALVE
PRESSUREGAUGE
RISER
RUN OUT OFF BOTTOM OF MAIN
RUN OUT OFF TOP OF MAIN
TEE OFF SI�E OF MAIN
TEST PLUG
THERMOMETER
UNION
WATER METER
"Y" STRAMER
ABBREVIATIONS
AFF
BTUH
CO
CW
EC
FD
FT
FS
GC
GM
GPM
GL
HW
HWR
IN
LAV
MAN
MFR
MC
MS
PC
PD
PRV
P51
RPM
RPZB
snN
SK
TMV
�oN
UR
VIF
V�R
WC
WH
ABOVE RNISHED FLOOR
BRITISH THERMAL UNIT PER HOUR
CLEAN OUT
COLD WATER
ELECTRICALCONTRACTOR
FLOOR DRAIN
FEET
FLOOR SINK
GENERALCONTRACTOR
GAS METER
GALLONS PER MINUTE
GREASE LINE
HOT WATER
HOT WATER RETURN
INCH
LAVATORY
MANUAL
MANUFACTURER
MECHANICALCONTRACTOR
MOP SINK
PLUMBING CONTRACTOR
PRESSUREDROP
PRESSURE RELIEF VALVE
POUNDS PER SQUARE INCH
REVOLUTIONS PER MINUTE
REDUGED PRESSUREZONED BAGKFLOW
SANITARY SEWER
SINK
THERMAL MIXING VALVE
UNLESS OTHERWISE NOTED
URINAL
VERIFY IN FIELD
VENTTHORUGH ROOF
WATER CLOSET
WATER HEATER
RELEASED FOR CONSTRl1CTI0N
Su6jec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
`�j sv�� �\o�v�AWnT �
�
DATE: OZ�O4�20
PLUMBING SPECIFICATIONS
GENERAL
1. BI� INSTRUCTIONS: CONTRACTORS SHALL PROVI�E BASE BI� IN
STRICTACCORDANCE WITH DESIGN BASIS EQUIPMENTAND
MATERIALS. PROJECT DOES ENCOURAGE COMPETITIVE PRIQNG
AND ALLOWS FOR SUBSTITUTIONS OF EpUAL EpUIPMENT AND
MATERIALSAGAINSTTHEBASISOFDESIGN. Sl1BSTITUTEITEMS
WILL BE COMPARED AGAINST DESIGN BASIS DURMG SUBMITTAL
PROCESS ENGMEER RESERVES THE RIGHT TO REJECT
SUBSTITUTIONS FOUND NOTTO BE EpUAL TO ITEMS LISTED IN
DESIGN BASIS.
2 PRIORTOPROCUREMENTCONTRACTORSHALLSUBMITTO
ARCHITECT FULL SUBMITTALS FOR ALL ENERGY CONSUMMG OR
PRODUCING ITEMS AND FOR ALL PLUMBING FlXTURES, VALVES,
DRAINS, QEAN OUTS, PIPING, PIPING ACCESSORIES, INSULATION
AND PIPWG HANGERS. SUBMITTALS SHALL BE DELINEATED WITH
TAGS INDICATED ON PRINTS, CONTRACTORS NAME, PROJECT NAME.
QEARLY INDICATE ALL MODEL NUMBERS AND ALL ACCESSORIES
AND OPTIONS BEING PROVIDED. SUBMISSIONS SHALL BE IN PDF
FORMAT.ENGMEER RESERVES THE RIGHT TO REJECT ANY
SUBSTITUTE ITEM.
3. CONTRACTORSHALLBERESPONSIBLETOVISITTHESITETO
EXAMME ALL CONDITIONS THAT MAY IN ANY WAY AFFECT THE
EXECUTION OF HIS WORK. HE SHALL ALSO EXAMME THE DRAWINGS
AND SPEQFlCATIONS FOR OTHER BRANCHES OF WORK MAKING
REFERENCE TO THEM FOR DETAILS OF EXISTWG BWLDMG
CONDITIONS. NO EXTRAS WILL BE ALLOWED FOR FAILURE TO
INCLUDE ALL RE�UIRED WORK IN THE BID. CONTRACTOR SHALL
GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO CONTRACT
FOR A PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE.
4. THEDRAWWGSINTHISSECTIONAREDIAGRAMMATICANDARENOT
INTENDED TO DEFlNE EXACT QUANTITIES, LOCATIONS OR CODIFlED
REDUIREMENTS. DRAW INGS SHOW GENERAL INTENT OF SVSTEMS.
P.C. SHALL PROVIDE AND PAV FOR ALL REpUIRED PERMITS.
5. UPONCOMPLETIONOFTHEPWMBINGINSTALLATION,
�EMONSTRATE TO THE ENGINEER AN�IOR THE OWNER'S
SATISFACTION THATTHE SYSTEMS HAVE BEEN INSTALLED IN
ACCORDANCE WITH THE DRAWINGS, SPEQFlCATIONS AND
APPLICABLE CODES. DEMONSTRATE THE DYNAMIC OPERATION OF
EACH SVSTEM. VERIFV PROPER OPERATION OF EQUIPMENT,
FlLTERS ARE CLEAN AN� COMPONENTS OF THE SYSTEM ARE
INSTALLED AND ADJUSTED M FULL ACCORDANCE W ITH
MANUFACTURERRECOMMENDATIONS.
6. PWMBINGWORKSHALLBECOMPLETEMEVERYDETAILANDALL
MISCELLANEOUS ITEMS OF MATERIAL AND LABOR NECESSARV TO
COMPLETE THE WORK �ESCRIBE�, SHOWN OR REASONABLY
IMPLIED ON DRAWINGS OR SPEQFlCATIONS SHALL BE INCLUDED IN
THECONTRACT.CONTRACTORSHALLMAKEMINORADJUSTMENTS
TO THE WORK WHERE REpUIRED, WHEN SUCH ADJUSTMENTS ARE
NECESSARV FOR PROPER OPERATION AND WITHIN THE INTENT OF
THE CONTRACT. CONTRACTOR SHALL GUARANTEE ALL LABOR AND
MATERIALS ENTERING INTO CONTRACT FOR A PERIOD OF ONE (1)
VEAR FROM DATE OF ACCEPTANCE.
]. ALL WORK SHALL BE IN FULL ACCORDANCE WITH 2O121NDIANA
PLUMBMG CODE QNTERNATIONAL PLUMB W G CODE 2006), 2010
INDIANA ENERGY CODE (200� ASHRAE 90.1), 2014 INDIANA FUEL GAS
CODE (20121NTERNATIONAL FUEL GAS CODE) AND ALL PERTMENT
STATE, COUNTY, CITY CODES AND ORDINANCES WITH INDIANA
AMENDMENTS.
B. PLUMBINGCONTRACTORSHALLACCEPTSOLEANDCOMPLETE
RESPONSIBILITY FOR CONDITIONS OF THE JOB SITE, INCLUDMG
SAFETV OF ALL PERSONS AND PROPERTV DURING PERFORMANCE
OF THE WORK.
9. DURINGCONSTRUCTIONALLPWMBINGFIXTURES,TRIMANDOTHER
EQUIPMENT SHALL BE PROTECTED AGAINST DAMAGE OR INJURY.
ANV FlXTURES OR EDUIPMENT DAMAGED AND ANV TRIM WITH
MARRED OR SCRATCHED FlNISH SHALL BE REPLACED AT NO
ADDITIONAL COST TO THE OWNER.
10. PLUMBMG CONTRACTOR SHALL VERIFV AND BE RESPONSIBLE FOR
ALL WATER, GAS, STORM AND SEWER UTILIiY ROUGH-INS AND
SHALL CONSULT WITH THE CIVIL PLANS AND WITH LOCAL UTILITY
COMPANV(S) PROVIDING ALL MATERIALS AND LABOR AND PAVING
ALL COSTS NOT BORNE BV THE LOCAL 11TILITV COMPANV(S) FOR
INSTALLATION OF SERVICES INCLUDMG SECURMG AND PAYMG FOR
ALL REQUIRED PERMITS.
11. PLUMBINGCONTRACTORSHALLENSUREEMPLOVEESAREMEETING
AND DOCUMENTING ALL OSHA AND JOB SPECIFIC SAFETY
REQWREMENTS AS REQUIRED BV LAW AND BV CONTRACT.
PERSONAL PROTECTNE EpUIPMENT SHALL BE PROVI�E� AN�
UTILRED AS RE�UIRED. MECHANICAL CONTRACTOR SHALL PAY ALL
FMES LEVIED BY OSHA FOR FAI W RE TO COMPLY W ITH OSHA
REpUIREMENTS.
12. ALL PLUMBMG MATERIALS INSTALLED IN RETURN AIR PLENUMS
SHALL BE INSTALLED OR COVERED WITH MATERIALS AS RE�UIRED
TO PROVIDE FLAME RATING OF NOT MORE THAN 25AND A SMOKE
DEVELOPED INDEXOF NOT MORE THAN 50. PRIOR TO ROUGH-IN
CONSl1LT WITH M.C. TO VERIFVALL LOCATIONS OF RETl1RN AIR
PLENl1MS.
13 FURNISH AND INSTALL ACCESS PANELS FOR ALL CONCEALED
EpUIPMENT, PIPING VALVES, QEANOUTS, ETC. ACCESS PANELS
SHALL BE OF SUFFlQENT SRE TO PROVIDE ADEpUATE WORKING
CLEARANCE AN D ACCESS.
14. PLUMBMGCONTRACTORSHALLBERESPONSIBLEFORALL
REDUIRED CUTTING AND PATCHING INCLUDING SAW CUTTING AND
PATCHING OF EXISTING FLOORS AS REpUIRED TO ACCEPT NEW
FLOORING.
15. UNLESS OTHERWISE NOTE�, ROUTE ALL PIPMG AS HIGH AS
POSSBLE AND ROUTE PERPENDICULAR ANDIOR PARALLEL TO
BUILDING STRUCTURE.
EpUIPMENT
1. PROVIDEEpUIPMENTASSHOWNONEOUIPMENTSCHEDULESAND
PLAN NOTES. SU BSTITUTIONS TO LISTED EQUIPMENT SHALL BE AT
RISK OF CONTRACTOR. SUBSTITUTIONS SHALL ONLY BE ALLOWED IF
ITEMS ARE EDUAL IN ALL ASPECTS.
2. PROVIDE SUBMITTALS TO ELECTRIQAN AS REpUIRED FOR
COORDINATION OF ALL REQWRED ELECTRICAL POWER WIRMG.
INCLU�E WIRMG �IAGRAMS AN� CABLMG REpUIREMENTS FOR
REFERENCE COORDINATE ALL INTERLOCKS AS NEEDED. PROVIDE
SMGLE POINT CONNECTION KITS AS NEEDED.
3. INSTALL ALL EQUIPMENT IN FULL ACCORDANCE WITH
MANUFACTURERSRECOMMENDATIONSAND QEARANCE
REpUIREMENTS. PROVIDE ALL REpUIRED MOUNTING OR
HOUSEKEEPING PADS. G.C. SHALL PROVIDE LEVEL GRADE FOR
EXTERIOR MOUNTED EQUIPMENT. P.C. SHALL PROVIDE ALL
HOIST W G AN� RIGGMG NEE�E� TO SET ALL PLUMBMG EpUIPMENT.
4. ALL EDUIPMENT SHALL BE INSTALLEDAS NEEDED TO PREVENT
OBJECTIONABLE NOISEANDIOR VIBRATION. P.C. SHALL PROVIDE
VIBRATION PADS, SPRING ISOLATORS, ATTENUATORS AND
ACCESSORIES AS NEEDED.
5. PROVIDE ALL BLOCKING, HANGERS, SHELVES, BRACKETS ETC. AS
RE�U IRED TO INSTALL ALL PLUMBING E�UIPMENT.
6. INSTALL WATER HEATERS IN ACCORDANCE WITH NFPA-]0, AND THE
NATIONAL ELECTRICAL CODE. PROVIDE BRASS DRAIN VALVE, 3/4"
RELIEF VALVE AND COLD WATER DIP Tl1BE. INSTALL HEATERS PER
MANUFACTURES INSTALLATION INSTRUCTIONS. PROVIDE SHUT-0FF
VALVES FOR SERVICE WORK.
]. THERMOSTATS ON WATER HEATER SHALL NOT BE USED FOR
LIMITING HOT WATER TEMPERATURES.
P.C. SHALL PROVI�E MIXMG VALVES FOR HOT WATER TO ALL
HANDS-FREE FAUCETS ACCESSIBLE TO OCCUPANTS. MIXING VALVE
SYSTEMS SHALL LIMIT WATER TEMPERATURE AT FAUCETS TO 110
DEG E OR LESS.
8. PROVIDESCHEDULE40PVCPIPMGANDFITTMGSFORALL
COMBUSTION AIR AND VENT PIPMG IN ACCORDANCE W ITH
MANUFACTURERS INSTRUCTIONS ON ALL DIRECT VENT WATER
HEATERS OR BOILERS.
FIXTURES
1. REFERENCE FIXTURE SCHEDl1LES ON PLANS AND PROVIDE ALL
REpUIRE� CARRIERS, BLOCKMG, HANGERS, TAIL PIECES, TRAPS,
RISERS,ESCUTCHEONS,GRIDS,PUTiY,GASKETS,CAULKING, ETC.
AS REpUIRED TO INSTALL ALL P W MBING FIXTURES.
2. REVIEW SUBMITTALS FORALL OWNER PROVIDED EpUIPMENTAND
PROVIDE ANV REQU IRED ACCESSORIES AS NEEDED FOR A
WMPLETE INSTALLATION. P.G SHALL BE RESPONSIBLE TO RECEIVE
AND INSTALL ALL OWNER PROVIDED FIXTURES.
3. FlXTURES DESIGNATED FOR HANDICAPACCESSIBILITYSHALL
COMPLV WITH ANSI A 11].1, LATEST EDITION, INCW DMG ADOPTED
INDIANA AMENDMENTS.
4. PROVIDE ALL CODE RE�UIRED BACKFLOW DEVICES FOR PROCESS
HVAC EpUIPMENTAND FOR WATER SERVING ANV DRINKING OR
FOOD PREPARATION FIXTURES.
5. PROVIDEBELLOWSTVPEWATERHAMMERARRESTERS,STAWLESS
STEEL CASHING AND BELLOWS, 250 PSI, INSTALL PER PDI STANDARD
WH2O1.
PIPING
1. ALL EXPOSED SUPPLV PIPES AND METAL TRIM IN CONNECTION WITH
THE FIXTURES SHALL BE CHROME PLATED RED BRASS OR BRONZE,
PROVI�E CHROME PLATE� STOP VALVES IN ALL SUPPLIES TO ALL
FlXTU RES. PLASTIC STOPS OR TRIM SHALL NOT BE ACCEPTABLE.
CAULK ALL FlXTURES WITH WATERPRWF SILICONE CAULK. TRAPS
SHALL HAVE CLEANOUT P W GS. INSTALL ONE PIECE CHROME
ESCUTCHEON PLATE WITH SET SCREW AT WALL PENETRATIONS.
2. THE MINIMUM SLOPE OFA HORIZONTAL DRAINAGE PIPE SHALL BE:
a. 1/4" PER FOOT FOR PIPES UP TO 2-1/2".
b. 1/8" PER FOOT FOR PIPES 3" TO 6".
c. ili6" PER FOOT FOR PIPES 8" OR LARGER.
MAINS AN� LATERAL BRANCHES SHALL BE SLOPE� TO WAR� THE
BWLDMG DRAIN. ALL PIPMG SHALL BE INSTALLED AND TESTED IN
AC W RDANCE W ITH THE CURRENT PLUMBING W DE AND PER THE
AUTHORITV HAVING JURISDICTION.
3. CLEAN OUTS SHALL BE INSTALLED WITH IN 5'OF THE FOUNDATIONS
AND AT THE BASE OF EACH STORM AND WASTE STACK, AND AT NOT
MORE THAN ]5 FOOT INTERVALS ON ALL HORIZONTAL RUNS, AT THE
HIGH POINT OF THE BUILDING DRAIN AND PER THE CURRENT
PW MBING CODE.
4. VERIFYLOCATION,DEPTHANDSIZEOFSANITARYSEWER
CONNECTIONPOINTS. CONNECTASREQUIRED.OUTSIDESEWER
SHALL BE INSTALLED WITH MINIMUM OF 3'-0" COVER. COORDINATE
CONNECTIONS WITH SITE CONTRACTOR AND LOCAL UTILITV
5. ALL OUTSIDE WATER PIPING SHALL BE COVERED PER LOCAL
REQl11REMENTS OR WITH A MINIMUM BELOW PREDICTED FROST LINE
WHICH EVER IS GREATER.
6. ALL INTERIOR PIPING PENETRATIONS THROUGH WALLS, CEILINGS,
ROOFS AND FLOORS SHALL BE SLEEVEDAND SEALED. PROVIDE UL
LISTED FIRE STOPPING WHERE REpUIRED.
]. ALL EXTERIOR UN�ERGROUN� PENETRATIONS OF BWL�WG
FOUNDATIONS OR SLAB FLOORS SHALL BE SLEEVEDAND SEALED.
PENETRATIONS BELOW GRADE INTO THE BUILDING SHALL BE DONE
WITH MECHANICAL SEALS LIKE "LINK SEAL" OR EpUAL.
8. ALL PIPING PASSING THROUGH CONCRETE OR CINDER WALLS OR
Sl1BJECT TO EXPOSl1RE TO CONCRETE SHALL BE TAPED, SLEEVED
OR INSULATE� TO PREVENT �IRECT CONTACT WITH CONCRETE.
9. NO PLUMBING PIPING SHALL PASS DIRECTLV OVER ELECTRICAL
PANELS OR DISTRIBUTION CABWETS. PRIORTO ROUGH IN
COORDINATE WITH E.C.
10. DIELECTRIC UNIONS SHALL BE USED TO CONNECT DISSIMILAR
METALS OR METAL PIPING SHALL HAVE METAL CONNECTIONS ON
EACH END THREADED TO MATCH THE ADJACENT PIPING. METAL
COMPONENTS SHALL BE SEPARATED BV A NVLON INSULATOR TO
PREVENTCURRENTFLOW BETWEENDISSIMILARMETALS. UNIONS
SHALL BE SUITABLE FOR THE SYSTEM OPERATMG PRESSURES AND
TEMPERATURE WELD TVPE: ASTM A-234.
11. PIPINGSLEEVES'INTERIOROREXTERIORABOVEGRADE'
GAWANIZED-STEELPIPE SLEEVES OR PVC-PIPE SLEEVES. VERIFV
WITH FIRE AUTHORITIES HAVMG JURIS�ICTION, THAT PVC
MATERIALS ARE ALLOWED FOR SLEEVES. BELOW GRADE; ALL;
MECHANICAL GALVAWZED-STEEL PIPE SLEEVE SYSTEM LIKE
LINKSEAL. ALL SLEEVES SHALL BE FlRE STOPPED OR CAULKED.
EXTERIOR SLEEVES SHALL PROVIDE WATER/AIR TIGHT
PENETRATION SYSTEM.
12. PROVIDE HANGERS PER MSS AND IPC STANDARDS BASED ON PIPING
TVPES AND SRES. WHERE EXPOSED TO VIEW IN PUBLIC SPACES,
RODS SHALL BE GALVAWZED.
13. VALVES2"AN�SMALLERSHALLBELIKECRANE(3)PIECE3800
SERIES BALL OR 43B SERIES GATE VALVES.2-1/2" OR LARGER SHALL
BE LIKE CRANE SERIES G3500 BALL OR 465 GATE VALVES.
14. UNIONS:PROVIDEANDINSTALLUNIONSASREpUIREDFORTHE
INSTALLATION AND REMOVAL OFALL EQl11PMENT.
15. STOPS: ALL FIXTURES SHALL BE INSTALLED WITH METALa TURN
CHROME PLATED PLUMBING STOPS COMPATIBLE WITH PIPING
MATERIAL SERVMG FIXTl1RES.
i6. PIPINGMATERIALSUNLESSOTHERWISENOTEDONTHEPLANS
SHALL BEAS FOLLOWS:
GAS ABOVEGRADE,2"ANDSMALLER;BLACKSTEELSCHEDULE
40 TYPE E OR S PIPE GRADE B; ASTM A53 / A53M, A105 OR
A120 WITH THREADED ENDS; FITTMGS SHALL BE
MALLEABLE IRON THREADED FlTTINGS ASTM Bi6.3 CLASS
150.
WATER COPPERTUBINGQNSIDEBUILDING):ASTMB88,TVPE'L'
HARD WATERTUBE DRAWN TEMPER. WITH CAST-COPPER
SOLDER-JOINT FITTINGS: ANSI B16.18. OR
W ROUGHT-COPPER SOL�ER JOINT FITTMGS: ANSI B16 22
WATER WHEREINDICATEDONTHEPLANS,WATERTUBINGSHALL
BE TVPE A PEX W IRSBO, ZURN, NBCO, OR UPONOR
CONFORMING TO ASTM F8]6, F8]], E84, E814, ANSINL 263
AND NSF14/61. 100 PSIG AT 180 DEG. B W E FOR COLD AND
RE� FOR HOT AN� RE-CIRCULATION WHITE FOR GENERIC.
FITTINGS SHALL BE PER ASTM F1960 LIKE UPONOR ProPEX
COLD EXPANSION, PUSH TO FlT OR COPPER CRIMP WITH
BRASS OR ENGWEERED PLASTIC FITTINGS. MANIFOLDS
WHERE 11SED SHALL BE LIKE UPONOR ProPEX TVPE L TO
ASTM FB�� W ITH BRASS OR EP BALL VALVES.
WATER BUILDING MAINS AND RISERS OUTSIDE OF WATER ROOM 2"
AND SMALLER: FLOW GUARD GOLD OR EpUAL SDR 11
CPVC; PIPING ASTM D 2846 WITH SOCKET WELDED
FITTMGS ASTM F 493. MA�E FROM CPVC CELL CLASS
24448 ASTM D 1184. MANUFACTURED PER NSF 14 AND 61.
PLUMBING INSULATION
1. ALL PIPING INSULATION MATERIALS SHALL HAVE A FLAME SPREAD
RATMG OF 25 OR LESS (ON THE FLAME SPREAD TEST SCALE) AND
SMOKE �EVELOPMENT OF 50OR LESS (ON THE SMOKE TEST SCALE)
OR AS DEFINED BY NFPA 255 STANDARD M ETHOD OF TESTING OF
SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS,
LOCAL CODES AND LOCAL AUTHORITIES HAVING JURISDICTION. ALL
PVC PIPMG LOCATED IN RETURN AIR PLENUM SPACES OR EXPOSED
SHALLBEINSULATE�.
2. INSTALL ALL INSULATION IN STRICT ACCORDANCE WITH
MANUFACTURERS INSTRUCTIONS IN A TIGHT AND NEAT MANOR. NO
SAGGWG, FRAVED OR TORN INSULATION WILL BE EXCEPTED.
3. ALLINSULATIONR-VAWESSHALLMEETTHECl1RRENTENERGV
CODE REQUIREMENTS. UNLESS OTHERWISE NOTED ON PLANS
PIPING SVSTEMS SHALL BE INSULATED AS FOLLOWS:
a. HOT WATER REQRCULATION SYSTEMS; ALL HW AND HWR
PIPING SHALL BE INSULATED
b. NON RE-CIRCULATION HOT WATER STORAGE SVSTEMS; THE
FlRST B FEET OF HW AND CW PIPING CONNECTED TO THE
STORAGETANK.
c. COPPER WATER PIPING; ALL PIPING HOT OR COLD SHALL BE
INSULATED.
d. HEATTRACEDPIPWGALLHEATTRACEDSECTIONS.
e. PLASTIC PIPING BELOW GRADE; ALL HW, CW, HWR PIPING.
EXCEPTIONS: THE TUBING FROM THE CONNECTION AT THE
TERMINATION OF THE FlXTURE SUPPLV PIPING TO A PLUMBING
FIXTl1RE OR P W MB W G APPLIANCE.PIP W G FROM
USER-CONTROLLED SHO WER AND BATH MIXMG VALVES TO THE
WATER OURETS.
4. STORM WATER PIPING EXPOSED IN BUILDING SHALL BE INSULATED
FOR SOUND WITH MINIMUM �' THICK ELECTROMETRIC CLOSED CELL
INSULATION.
5. INSULATION MATERIALS:
a. PRE-FORMED TVPE I, 850 DEG F MINERAL OR GLASS FIBERS
BON�E� WITH A THERMOSETTING RESIN AN� HINGE� WITH
SELF SEALING LAP. COMPLV WITH ASTM C 54�, TVPE I,
GRADEA, WITH FACTORY-APPLIEDASJ.
b. FLEXBLE ELASTOMERIC CLOSED CELL OR EXPANDED
Rl1BBER PIPE INSl1LATION WITH PRESSl1RE SENSITNE
ADHESNE SYSTEM, ASTM C534, ASTM E84 CLASS A 300 DEG F.
a EXTERIOPoEXPOSED JACKETS: W RESISTANT PVC PIPE
JACKETS AND PREFORMED FlTTING COVERS COMPLIANT
WITH ASTM D25], D638, D]90, D]92, Di]84, D36]9, E84 AND
E136.
FIRE STOPPING.
a. FIRESTOPPMGSVSTEMSSHALLBEINFULLCOMPLIANCE
W ITH SECTIONS �14 OF THE IBC AND SECTION 315 OF THE
IPC.
b. CONTRACTORSHALLMAKEREFERENCETOARCHITECTURAL
PLANS AN� PROVI�E ALL REpUIRE� FIRE STOPPMG
SVSTEMS.
a CONTRACTORSHALLPROVIDEAHJWITHFULLSUBMITTAL
INDICATING METHODS OF CONSTRUCTION AND UL LISTINGS
FOR EACH REQUIRED FIRE STOP SYSTEM.
d. ACCESS DOORS REQUIRED IN CEILINGS OF
FIRE-RESISTANCE-RATED FLOOR/CEILMG AND ROOF/CEILMG
ASSEMBLIES SHALL BE TESTED IN ACCORDANCE WITH ASTM
E 119 OR U L 263 AS HORIZONTAL ASSEMBLIES AND LABELED
BY AN APPROVED AGENCY FOR SUCH PURPOSE.
CHECK TEST AND START UP REQUIREMENTS
1. LABEL ALL MAJOR PIECES OF EQUIPMENT WITH LAMACOID PLASTIC,
BLACK WITH WHITE LETTERS. SIZE TO BE CONSISTENT WITH
EpUIPMENT BEING LABELED. LENGTH AND WIDTH VARV FOR
REQUIREDLABEL CONTENT.
2 PLUMBWGCONTRACTORSHALLFURNISHALLTOOLS,INSTRUMENTS
AND EDUIPMENT REDUIRED FOR TESTING PIPING. ALL TESTING
SHALLBEDONEPRIORTOCONCEALMENT. ALLPARTSOFTHE
SANITARY DRAINAGE SYSTEM SHALL BE TESTED AS REpUIRED BY
LOCAL PWMBMG INSPECTORS. ALL WATER PIPMG SHALL BE
HYDROSTATICALLY TESTED TO MINIMUM 125 PSIG.
3. CLOSE OUT: PROVIDE MANUFACTURERS OPERATION AND
MAINTENANCE MANUALS AND AS BUILT DRAWINGS. PROVIDE (1)
TRAINING SESSION TO OWNER SELECTED PERSONNEL AS
REpUESTE� AN� PROVI�E WARRANTY INFORMATION FOR ALL
MANUFACTURERS WARRANTED EQUIPMENT
4 FlLL SVSTEMS WITH FRESH WATERAND INSPECTALL CONNECTIONS
FOR LFAKAGE REMOVE ALL PACKING AND PROTECTIVE SHIPPING
MATERIALS. CLEAN ALL FIXTl1RES AND START-l1P ALL WATER
HEATERS, PUMPS, AND EQUIPMENT. VERIFV PROPER OPERATION.
OPERATE ALL FAUCETS AND INSPECT STOPS, RISERS, TRAPS AN D
DRAINS. CORRECT ALL LEAKS, WATER HAMMER AND VIBRATIONS AS
REpUIRED.
c�
z
W � �
W
Z
(9
z �
W . �
�
�
W �
Q i... � ..� O
_ ......._ _...� '
U u�i �
� � T N
V! � >N N
Q W > �
�
°b � � N � (p y
� � r
� � C t0 W � �
d' C �� p� �
W O a�Z Nn �
❑ U
U � � n �
Oa
� W � O M M'O
U` � � Q d LL W
OWNER:
RANGELINE CHIROPRACTIC
XXX
CARMEL, IN
CONTRACTOR:
ALT CONSTRUCTION
10650 N BENNET PKWV SUITE:200
ZIONSVILLE, IN 46011
ARCHITECTURE:
ALO PROPERTY GROUP
90]5 N MERIDIAN ST, SUITE 1]5
INDIANAPOLIS, IN 46260
MEP:
DESIGN BUILD
U
�
U
�
�
I
U
W
Z
J
W
QN
L.L
Z
O
�
Q
�
O
W
I..L
LL
0
1..�
�
Z
No.
10200395
�
� Q
Z Q
O �
� �
W J
Y�
N �
N Q
�U
C��\i/��� �/ C
�2-�a-2o�g
PLUMBING ABBREVIATIONS,
SYMBOLS, & SPECIFICATIONS
P001