HomeMy WebLinkAboutBathroom crawl space cross section 18'-0"
1/2" cement underlayment
3/4" OSB subfloor
11-7/8" TJI, 20" OC
(2) concrete pads: 14" x 14" x 12" D
Steel posts
Triple 1-3/4" x 11-1/4" x 10' 1.9E LVL - glued, nailed and compressed with carriage bolts
Total triple LVL beam width 5-1/4"
2x10 16" OC SYP
3/4" OSB subfloor
Finishing Touch Renovations, Inc.
Crawl space cross section:
Dropped floor under shower to create area for slope for linear drain
in wheelchair accessible shower
Pat and Cathy Bradshaw Residence
12727 Kiawah Drive
Carmel, IN
Revised: 1/23/20
Total drop from bathroom OSB subfloor to OSB dropped floor 2-5/8"
Total drop from bathroom floor cement underlayment to OSB dropped floor 3-1/8"
Note: blocking will be inserted between cut-off of TJI ends and between ends of 2x10's
6'-9"
02/05/20
Mike Sheeks