HomeMy WebLinkAboutLegacy Ridge 111 - Southill CBasement FoundationFront Elevation CSet No. 8960C2Reversed (Left-Hand Garage) OrientationLot 111, Legacy Ridge 6732 Grantsville Lane, Carmel, IN 46033Southill CIntegrated Plan OptionsJob NotesTHIS PLAN SET REFLECTS THE FOLLOWING CHECKED OPTIONS:Plan RevisionsArtist Rendering Only. See Construction Drawings andSelection Sheets for Finish Materials, Colors, Masonry Locations,Door, Window and Garage Door Specifications.Estate
Southill C 8960C2
T-1Title Page
Selected OptionsEstate
Southill C 8960C2
Front Elevation CLegacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
A1.1Elevations Exterior Trim KeyNote:Note:
Selected OptionsSouthill C 8960C2
Legacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
A1.2ElevationsRight ElevationRear ElevationLeft ElevationExterior Trim KeyNote:Note:
Selected OptionsSouthill C 8960C2Roof Plan CLegacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
A1.3Roof PlanSection atPorch Box-Beam
Basement SlabGarage SlabSelected OptionsEstate
Southill C 8960C2
Foundation Plan CLegacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033Bsmt. Slab Areas
A2.1Foundation PlanSection at Porch Slab
BasementFinishedBathBasementFinishedUnfinishedStorage/Utility Rm.DenClosetWalk-InHobby orExercise rm.Estate
Southill C 8960C2
Area CalculationsLegacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
A2.2Foundation PlanFinished Basement
Great Rm.Dining Rm.PowderRoom3-CarGarageSunroomMorning Rm.PlanningCenterKit.FamilyFoyer2-StoryBath 4PantryCoveredEntryFoyerHome Office /5th Bdrm. SuiteCovered PorchArea CalculationsSelected OptionsEstate
Southill C 8960C2
First Floor Plan CLegacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
A3.1First Floor Plan Note:General Notes:
SharedBathOwner's SuiteLaundryClosetWalk-InWalk-InClosetBedroom 4Bedroom 2 SuiteOwner'sBathOpen toBelowBedroom 3Walk-InClosetOpen toBelowBath 3ClosetWalk-InSelected OptionsEstate
Southill C 8960C2
Second Floor Plan CLegacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
A3.2Second Floor Plan
Estate
Southill C 8960C2
Legacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
A4.1Building SectionBuilding Section
Estate
Southill C 8960C2
Legacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
A4.2Stair Section
9' BasementStair SectionLandingDetail at NicheStair9' Basement
Legacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
Estate
Southill C 8960C2
A4.3CExterior DetailsRake Frieze DetailColumn BasePlan Section at Porch ColumnSection at Porch ColumnPlan Section at
Legacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
Southill C 8960C2
A4.4Covered Patio Details Porch SlabPorch Box-BeamRange HoodWall Panel Details
Estate
Southill C 8960C2
Legacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
AD-4Family Org. DetailsSection at Built-InsPlan Section at Built-InsElevation at Built-Ins
Estate
Southill C 8960C2
Legacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
AD-5Shower DetailsWalk-In ShowerPlan at Walk-In ShowerElevation at Walk-In ShowerInterior at
Estate
Southill C 8960C2
Legacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
E2.2Foundation Elec.Finished Basement ElectricalElectrical LegendFor Electrical Purposes OnlySwitch and ReceptacleLocations May VaryNote: Elevation A Shown,All Other Elevations Similar
Selected OptionsEstate
Southill C 8960C2
First Floor Electrical CLegacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
E3.1First Floor Elec.Electrical Legend
Selected OptionsEstate
Southill C 8960C2
Second Floor Electrical CLegacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
E3.2Second Floor Elec.Electrical Legend
Selected OptionsEstate
Southill C 8960C2
First Floor Framing CLegacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
S1.1First Floor Framing Legend
Selected OptionsEstate
Southill C 8960C2
Second Floor Framing CLegacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
S1.22nd Floor Framing Legend
Legacy Ridge, Lot 111
6732 Grantsville Lane, Carmel, IN 46033
Estate
Southill C 8960C2
Typical Rim Board ClosureTypical Squash Block DetailTypical Point-Load DetailHanger Detail at Solid BeamI-Joist Brick Cantilever DetailTypical I-Joist Cantilever DetailHanger Detail at I-JoistBrick Cantilever Detail
D-3Floor Framing DetailsTypical I-Joist Load-Bearing Cantilever Detail
Frame Business Partner
Community & Home Site
Construction Manager
Frame Checklist
Frame Check Garage
FC ______
FC ______
CM ______
Frame, House Interior
Attic Access location correct per Print, access has 14 inch sides if an insulated attic. Check size of Gables Access.
Post plumb and strapped to beam at top
Garage beam will be sealed to prevent air infiltration to floor space after Drywall is hung
Walls in Attic have sheathing installed
All panels are taped in Attic & Verticals Taped.
House band board in garage attic has insulated sheathing installed
House wrap installed at Band system in Garage and pulled down
Truss bracing installed if required
2x Framing for trusses/girders nailed directly house to framing without foam sheathing between frame members
Truss hanger’s nailed completely with required nails
Garage door opening correct size and location
Smart trim at bottom of door at concrete is ¼ inch off of concrete
Anchor bolts in garage plate installed 12 inches from each plate end at foundation and not more than 6 foot on
center and 12 inches from corner. Garage Portal frame 2x2 square washers in place at door. Nuts tight.
Garage steps are of equal rise to top of door threshold from garage floor. Not more than 8 ¼ rise
Sill sealer installed under wall or floor system between house and garage
Garage door bucks installed floor to ceiling in 1 piece 2x6 minimum. Buck is not to be in contact with concrete
nailed 12 inches on center
Garage door buck installed above door 1 piece 2x6. 2x10 installed above center of door to ceiling for garage door
opener nailed 12 inches on center
Estate/Side load electrical panel walls build if required. Note these walls may not be on print.
OSB is cut back 2 inches on each side of ridge, Ripper row no less than 2' at Peak.
Bowed studs are marked. Note these markings may be visible to customer if garage in not finished
Garage to house door set with 3 shims on each side and/or Exerior Service Door.
Drywall nailer in place on ceiling and corners/check for insulation access.
Garage door Portal framing correct per IRC 2008 Indiana amendments. Truss to girder connection 1/4" or less Solid
Bearing.
Truss Drawings and print hung in Garage
Girder truss bearing is complete to foundation
Garage to house door set with correct reveal 6 shims total
Bowed studs checked and marked in orange on the stud and floor with a B
Check each room per print for wall and door opening placement
Check each room for window placement.
Check walls for plumpness mark correction using OOP OOL
Windows centered in the opening shim sides if needed window to sit on sill with 1/8 bumper on bottom. Does the
window operate smoothly
Mark each doorway with correct door size and swing Example of how to mark… 2/6 RH with an arrow.
Mark in writing if an opening wraps in drywall wright the word out Drywall wrap or do not drywall or Wood wrap.
Add cabinet dimensions to verify correct wall length
Layout CL of range hood location vertical and horizontal.
Layout cabinet locations in kitchens and baths. Verify correct space for cabinets
Think about outlet/switch location in kitchen. Are all location either under cabinets or outside of cabinets? This has
to do with backsplash tile
Think about the locations for the outlets in bathrooms, no outlets in side splashed or behind mirrors.
Check ½ wall height to be certain it is tall enough to allow casing and vanity side splash to not interfere same
applies in home office area
Check to be sure toilet and shower drains do not interfere it the Joist locations
Verify correct walls or no walls are installed at stairway, walls vs rails.
Check floor joist layout for correct placement
Check roof truss layout for correctness
Check for correct truss bracing, note you will need truss drawings for this. Additionally correct overlapping is
required at brace connections
Shower pan blocking is in place
Stud placement in a shower location is to be no more than 16 inches O.C
Drywall nailers are in place in corners all locations
Drywall nailers are in place at ceilings. Parallel wall to trusses should be cross blocked 2 foot OC laid out for drywall
placement
Floor decking nailed and glued Nails 4 in the field 6 on the seams missed nails need pulled
Floor joist are nailed and glue is present in hangers
Air sealing in dead cavities is complete
Stairs are secures with 2-16d nails from back of stringer. No visible nails from the top.
Roof decking is gapped on 4 foot ends 1/8 to ¼ inch. Nailed 4 in the field 6 on the edge
Exterior doors are to be shimmed with 3 places each side for a 6/8 door 4 each for a taller door or a door with a
transom.
Ensure finish width of Halls, landings will be 36 inches.
Nailers for Tub Flange (32 inches for tub shower & 34 inches for fiberglass shower)
CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
Frame Check Basement
Finished Basement
Post plumb and tabs wrapped around the top
Post locations are correct, point loads from above in floor system installed
Beam is bearing in pocket at least 3 inches
Squash block are in place from over beam if there is a load bearing wall above.
No visible gaps in basement rim board
Floor joist laid out per print, LVL beans if needed are located in correct location.
Look for nails that have missed the joist and remove them
Joist hangers are secure with correct nails and joist are glued
Straps at bottom plate secured with 2 nails each strap on top and spaced 12 inches from plate ends and corners 6
feet on center.
Basement is clean no debris
Basement stairs are shimmed ½ inch from wall. There are no visible nails from top through stringer. All nails are
driven through 2x from under stairs. 3 Nails per step.
Stair Head height is correct. At minimum 6’8 inches in a plane diagonal line to stair header plumb.
Nosing not at top of stairs at first floor but is present and basement landing if stair case has a landing
Basement wall at basement landing is furred out with 2x material and wall is covered with insulation board or house
wrap. This depends on the space available.
Unfinished basement stair walls have 2x4 stud’s 16 inch OC on all 3 sides to close accessibility
Basement wall secured to floor with concrete nails and walls are plumb.
Door opening plumb and marked with 2 inch over call size of door 2 inches taller
2x4 studs 16 inches OC treated bottom plate
Drywall nailers present in in corners and at ceiling
All unfinished space must have a door opening into the area.
Bulkheads build shall be no lower than 7’ 1 inch from concrete floor.
Fire block weed cap above framed wall filling gap to bottom of joists.
Daylight Walkout Basement
Exterior
To the bottom of a daylight window there in not more than 42 inches to the opening.
100% braced sheathing used. Wall must meet bracing requirements of 2008 IRC. This means consideration for full
4 foot sheets. Wall cannot be all windows. Proper nailing pattern of braced sheathing.
Sill sealer is located under exterior walls. Walls are bolted per the 2008 IRC 12” plate ends 6 ‘OC
Any stud distance from concerate wall & each step wall face will need to have concrete wall insulation installed.
All horizontal seams flashed with house wrap a minimum of 6 inches hanging out
Holes and cuts in sheathing repair by tape or damaged sheathing replaced
Window tape install on 3 sides, 2 sides first and top last. Top must be even past the sides. No tape or sealer on
bottom.
Over hangs on home correct per print. Eyebrows installed per print
Windows correct per print and are in alignment
Exterior trim to be installed no closer to a shingled roof than 1 inch. Account for shingle thickness
All trim installed has the vertical ran past the horizontal at the intersections.
All horizontal smart trim used in board and batten style application must be installed prior to MDF board and have
drip cap installed over the horizontal 5/4 trim board. Board batten panel is to be installed between the horizontals
with ¾ trim over MDF to create the vertical.
Azeck trim installed at under doors on basement homes
1x2 trim installed at horizontal brick transitions
Window mantles install with Ice and water behind. Ice and water to extend 6 inches past sides and top and is taped
at top
House wrap install with overlaps of 6 inches horizontal and vertical
Vertical seams of house wrap need taped with correct brand seathing tape
House warp install on all inside & outside corners
House wrap install with cap nails no more that 32inch square
Raptor roof paper installed professionally verticle laps are to be a minimum of 4 inches, horizontal laps 6 inches,
cap nails at seams 12 inches OC 24 inch cap nails on seams.
Raptor paper to be installed to create a valley that sheds water by laps
Roofer to install roof edge under raptor at eaves and over paper gables. Plan nail placement accordingly
Roof less than 4/12 must have 2 layers of felt.
Exterior door trim to be taped as windows.
Exterior doors to be sat on rubber membrane that drapes to the exterior
Rubber membrane to be installed so after concrete is poured it will be between the concrete and the house
Gutter overhang or porch tiding back to verticle wall should have Ice & Water installed @ transition.
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
FC ______CM ______
Notes: