HomeMy WebLinkAboutGNO20.0#1
of
16
Date
:
10.08.19
Sheet
:
Revision:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been
prepared by Case Design &
Remodeling solely for its use and
should not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.Grigsby ResidenceKitchen & Bath RemodelTina & Brian Grigsby1991 W. 116th St.Carmel, Indiana 46032Approved By:
Date:
Jessica Seljan
Lead Designer
jseljan@caseindy.com
G002
FINAL
Megan Nagy
Designer
mnagy@caseindy.com
DEMOLITION NOTES
G ENERAL / CONSTRUCTION NOTES
GENERAL
REMOVE & SALVAGE WATER SOFTENER IN GARAGE FOR
RELOCATION
DEMO WALLS PER PLANS
R/H CARPET, ELECTRICAL, DOOR, HARDWARE, CASINGS, JAMBS,
HEADERS & TRIMS FOR GARAGE/ WATER SOFTER CLOSET
R/H CABINETS IN GARAGE ON SOUTH WALL
R/H GARAGE ENTRY DOOR, HARDWARE & JAMBS
R/S GARAGE DOOR OPENER BUTTONS FOR RELOCATION
R/H HARDWOOD & TILE FLOORING & SHOE MOLD DEMO
THROUGHOUT 1ST FLOOR
KITCHEN/BACK HALLWAY
EXISTING 2 PLY LVL RUNNING EAST WEST TO REMAIN
R/H EXISTING APPLIANCES; SALVAGE REFRIGERATOR
DEMO WALLS PER PLANS
R/H LIGHT FIXTURES
R/H EXISTING BULKHEADS, CABINETS, COUNTERTOPS, BACKSPLASH,
PLUMBING FIXTURES & BASE MOLDING
R/H DOORS, HARDWARE, CASINGS, JAMBS & HEADER TO DINING
ROOM
R/H TILE FLOORING & UNDERLAYMENT
RELOCATE EXISTING HVAC & PLUMBING
R/H LVL BEAM RUNNING NORTH SOUTH, JOIST & PLUMBING IN
CEILING
POWDER BATHROOM
DEMO WALLS & EXISTING BULKHEAD
R/H EXISTING PLUMBING FIXTURES
R/H EXISTING CABINETS, COUNTERTOPS, MIRROR, ELECTRICAL,
DOOR, CASING, JAMBS, HEADER & TRIMS
LAUNDRY ROOM
DEMO WALLS & BULKHEADS PER PLANS
R/H CABINETS, COUNTERTOPS, PLUMBING FIXTURES & TRIMS
R/H DOOR, HARDWARE, CASING, JAMBS, & HEADERS
R/H WINDOW CASING
R/H TILE FLOORING
TERMINATE WATER SUPPLY LINES/SHUT OFFS FOR ORIGINAL WASH
LOCATION
GUEST BATHROOM
EXISTING CABINETS, COUNTERTOPS, MIRROR & ELECTRICAL TO
REMAIN
REMOVE & SALVAGE TOILET
R/H DOOR, HARDWARE & CASING
R/H TILE FLOORING, UNDERLAYMENT & SHOE MOLDING
CONSTRUCTION NOTES
GENERAL
FRAME NEW OPENING FOR NEW GARAGE EXTERIOR TO BACK
HALL DOOR LOCATION
F/I NEW BASE & SHOE MOLDING IN AREAS AS NEEDED
RE-INSTALL SALVAGED WATER SOFTENER TO NEW LOCATION IN
GARAGE
MODIFY CONCRETE GARAGE STEP; EXTRA CONCRETE TO TIE
INTO EXT. STEP
INSTALL & FINISH NEW DRYWALL IN GARAGE; PATCH WALLS AS
NEEDED
F/I NEW GARAGE SERVICE DOOR & DOOR HARDWARE IN NEW
LOCATION
RELOCATE THE EXISTING SUPPLY AIR DUCTING TO PROPER
POSITIONING FOR NEW 1ST FLOOR LAYOUT MODIFICATIONS.
F/I NEW RECTANGULAR SHEET METAL RANGE VENT DUCTING &
JACK TO TERMINATE OUT REAR OF HOME.
RELOCATE THE EXISTING UPSTAIRS REFRIGERANT LINE SET &
DRAIN LINES INTO NEW CHASE
PREP FLOOR FOR H.O. PROVIDED FLOORING INSTALLATION
KITCHEN/DRY BAR
VENT NEW EXHAUST FOR RANGE HOOD THROUGH EXTERIOR
WOOD SIDING; 10" DUCT SIZE
PATCH DRYWALL FROM DOORWAY/ WALL REMOVAL AT SIDE
ENTRY; RELOCATE RETURN AIR VENT ON FLOOR
F/I (1) ONE NEW 1-PLY LVL (1 3/4" X 11 7/8") ADJACENT TO
EXISTING 2-PLY LVL BEAMS TO CREATE A 3 PLY; SEE DRAWINGS
FOR DETAILS
FRAME NEW 2X4 WALLS & OPENINGS; SEE PLANS FOR DETAILS
FRAME NEW 2X4 KNEE WALL IN ISLAND; 34 1/2" HEIGHT
FRAME NEW 2X8 WALL IN BETWEEN KITCHEN & DINING ROOM
FOR RELOCATED PLUMBING; SEE DRAWINGS FOR DETAILS
CAP EXISTING DOWNDRAFT EXHAUST OPENING
MODIFY JOISTS & BEAMS IN CEILING
F/I NEW SUBFLOOR AS NECESSARY
F/I NEW INSULATION ON EXTERIOR WALLS
F/I NEW CABINETS, CABINET GLASS, CABINET HARDWARE &
GRANITE CTOPS; SEE ELEVATIONS FOR DETAILS
F/I NEW CORBELS ON ISLAND; CASE TO PAINT TO MATCH
F/I NEW PORCELAIN 3X12 TILE BACKSPLASH;SEE ELEVATIONS
FOR DETAILS
INSTALL & FINISH NEW DRYWALL ON WALLS, DRYWALL
WRAPPED BEAM & CEILING
F/I NEW CASED OPENINGS; SEE ELEVATIONS & DOOR SCHEDULE
FOR DETAILS
#2
#3
#4
10.18.19
11.25.19
01.14.20
POWDER BATHROOM
FRAME NEW 2X4 WALLS & DOOR HEADER PER PLANS
INSTALL & FINISH NEW DRYWALL ON WALLS & CEILING
F/I NEW PRE HUNG DOOR PER PLANS; F/I NEW CASING
F/I NEW DOOR HARDWARE & ACCESSORIES
F/I NEW BASE MOLDING
INSTALL H.O. PROVIDED MIRROR
PANTRY
FRAME NEW 2X4 WALLS & DOOR HEADER PER PLANS
INSTALL & FINISH NEW DRYWALL ON WALLS & CEILING
F/I NEW PRE HUNG FROSTED GLASS DOOR PER PLANS; F/I NEW
DOOR HARDWARE
F/I NEW CASING & BASE MOLDING
OFFICE
FRAME NEW 2X4 WALLS & DOOR HEADERS PER PLANS
INSTALL & FINISH NEW DRYWALL ON WALLS & CEILING
F/I NEW PRE HUNG DOOR PER PLANS; F/I NEW DOOR HARDWARE
& CASING
F/I NEW BASE MOLDING
BACK HALL/MUDROOM
FRAME NEW 2X4 WALLS PER PLANS
FRAME NEW RECESSED NICHES FOR DOG WATER & FOOD
BOWL; INSTALL NEW INSERTS
INSTALL & FINISH NEW DRYWALL ON WALLS & CEILING
F/I NEW BASE MOLDING
GUEST BATHROOM
F/I NEW DOOR & CASINGS PER PLANS; F/I NEW DOOR
HARDWARE
#5 01.30.20
02/11/20
David Rutti