Loading...
HomeMy WebLinkAboutVIOC CARMEL, IN - P-2PLUMBING GENERAL NOTES 1. THE EQUIPMENT ROUGN-IN ITEMS AND hIEIR DIMENSIONED LOCA7ION5 FOR ALL CONNECTIONS ARE ACCURAIE TO 7HE BEST OF OUR KNOWLE�GE M SOME INSTANCES iHE OWNER OR SUPPLIER MAY MAKE SUBSTITUTIONS OR 7HE EQUIPMENT ITEMS MAY VARY FROM WHAT IS SHOWN. 1HEREFORE, 1HESE IiEMS AN� DIMENSIONS SHALL BE VERIFlED W1iH iHE EOUIPMENi SUP- PLIER, OWNER AN�/OR EQUIPMENi ROUGH-IN DRAWINGS. iHE ARCHIiECi�ENGINEER SHALL BE IMMEDIAIELY NonFiEo, PaioR to coNsrnucnoN, or auv ocwntious FROM wnnt is SHOWN OR IMPLIE� ON 7HESE DRAWINGS FAIWRE OF THE APPROPRIATE CONTRACTOR TO VERIFY ROOGH-INS OR 7HEIR LOCATIONS SHALL PLACE THE RESPONSIBILIiY FOR ANY Sl1BSEQUENi RELOCA➢ON AN�/OR A�DIiIONAL ROUGH-MS �IRECILY UPON iHE CON- TRACTOR. 2� CON7RACTOR SHALL SUPPLY TO 7HE ARCHITECT SIX COPIES OF SHOP �RAWINGS FOR APPROVAL SO THE �UALIiY OP MiEN�E� MAiERIALS OR EQl11PMENT CAN BE REVIEWEO 9EFORE INSTAL- LA710N. 3. �0 NOT SCALE THIS DRAWING. SEE ARCHITECIDRAL FLOOR PLAN FOR BUILDING DIMENSIONS. 4. THE SUBMISSION OF A PROPOSAL WILL BE WNSTRUE� AS EVI�ENCE iHAT lHE WN7RACTOR HAS FAMILIARIZE� HIMSELF WIIH 7HE PLANS AND BUIL�ING SIIE. CLAIMS MA�E SUB- SEQUEM TO THE PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFlCUL7IES ENCOUNTERE� WILL NOT BE RECOGMZED,IF 7HEY COULD HA�E BEEN FORESEEN HAO PROPER EXAMINATION BEEN MADE. 5. WAS7E AN� I�ENT PIPING SHALL BE CAST IRON. WN7RACTOR MAY OSE SCHE�ULE 4� OR 80, iYPE 1, GRADE 1, POLYUINYL CHLORIDE COMPOUN�S AS �EFINED AN� DESCRI9E� IN IENiA71VE SPECIFlCAlION;S FOR RIGI� PVC (ASiM DESIGNAiION: D1784- 75), OR SCHE�ULE 40 OR JO ACRri0NI7RILE-BUTADIENE- STIRENE COMPOUND AS DEFlNE� AND DESCRIBED M STANDARD SPECIFICATIONS FOR ABS (ASTM DESIGNAiION: D1]89-]3) IN LIEU OF CASi IRON WASiE AND VENi PIPING IF PERMITTED BY LOCAL CODES OR OiHERWISE NOTED. 6. FORNISH AND MSTALL SHUT OFF OR BALL VALVE AN� ONION ON ALL EOUIPMENT HOT AN� WL� WATER LMES. PWMBING CON- 7RACTOR SHALL MAKE Al1 FINAL CONNECPONS TO E�UIPMENT. COOR�INAIE WI7H EQUIPMENT SUPPLIER FOR E%ACT REOUIREMENTS. �� PURNISH AND INSIALL 1" (MIN.) FIBERGLASS INSULA710N WIiH AN ALL SERVICE JACKET ON ALL HOT AN� COL� WATER PIPING ABOVE SLAB. PIPING RUNNING 'M7HIN W7ERIOR WALLS OR E%POSE� 11N�ER EOUIPMENT IS EXCLO�E� FROM THIS REOUIREMENT. PIPING IN E%TERIOR WALLS SHALL BE INSULAiED AND INSiALLE� ON iHE HEAIE� SI�E OF WALL INSULAiION. CONiRACiOR SHALL NOiIFY ARCMiECi�ENGWEER IF FREEZINC CONDITIONS WARRANi RUNNING PIPING UNDER SLAB. e� WATER PIPING ABOVE SLAB SHALL BE TME "L" HARD iEMPER COPPER. 9. ALL PWMBING SHALL MEEi SiAIE AN� LOCAL CODES. 10. ALL VENi PIPE i0 BE COMPAiIBIE Wlhi SIRUCNRE fl. VERIFY SERNCE POINTS AN� METERING LOCATIONS FOR PROJECT WITH LOCAL UiIIJiIES AN�/OR LANDLOR� (DOMESiIC WATER, FIRE PROIECTION, SANITARY SEWER, GAS). VERIFY SEWER MVERT AT WNNECTION POMT i0 DEIERMME DEPiH OF HIGHESi PWMBING FIXiURE NOPFY ENGINEER IMMEDIAiELY IF INVERi IS i00 SHALLOW. 12. iHE CON7RACi0R SHALL COOPERAiE PULLY AMONG iHE iRADES. 13. FURNISH AND INSTALL CONDENSATE PIPING FROM ANY MECHANICAL EQUIPMENT AS REOUIRED. ANY PIPING ABOVE THE CEILING OR IN A LOCAPON WHERE MOISIDRE CONDENSING ON 7HE PIPE COOLD DRIP AND CAUSE �AMAGE SHALL BE INSOLAiED. USE 1/7' FlBERGLA55 W/ALL SERVICE JACKEi. PIPE FULL SIZE TO �RAM (OR AS REQ�� BY CODE) WITH REOUIRE� AIR GAP. 14. 7ME CONTRACTOR SHALL MAKE AN ON-SIIE INSPECiION OF hiE E%IS11NG BUIL�ING AND/OR BUILDING SITE BEFORE SUBMIT➢NG A BI�. ANY ALIERNAIE METHODS OF INSTALLATION OF "AS EQUAL" EOUIPMENT SHALL BE VERIFlE� 'M7H hIE OWNER PRIOR TO INSTALLATION. 15. PWMBING CONTRACTOR SHALL VERIFY WITH iHE LOCAL HEAL7H DEPAR7MENT AND/OR WATER COMPANY AS TO iHE METER AND VALUING ARRANGEMENTS OF THE �OMESiIC WATER SERVICE LWE WHICH EMERS 7HE BUILDING. SHOOLD A BACKFLOW PREVENiER ASSEMBLY AN�/OR PRESSURE REOUCING VALVE ASSEMBLY BE REQUIRE�, 7HE PWMBER SHALL FURNISH AN� INSiALL SAME PER LOCAL AN� S7AiE REOUIREMENiS. iHE BACKFLOW ASSEM9LY SHALL BE A°WA115" SERIES �909, OR APPROVED EQl1AL MEETING ASSE STANOAROS 1013, 1015 AN� 1020. IF WAIER PRESSORE IS 65 PSI OR ABO�E, 7HE PRESSURE REDOCING VAL1�E ASSEMBLY SHALL BE A"WATTS" SERIES �JUS SET AT 50 LBS. �ELNERY PRESSURE UNLESS O7HERW15E NOIED. 16. THE POTABLE WAiER SUPPLY SHALL BE PROlEC7ED AGAINST BACKFLOW AN� SIPHONAGE BOTH NAIDRAL AN� INOUCE�. ALL EQIIIPMENT CONNECiEO TO 7HE POTABLE WAIER SYS7EM BEING CAPABLE OF POLLUIINC OR WMAMINAiING iHE POiABLE WAiER DISiRIBU110N SYSTEAI OR ANY PARi THEREOP BY N,EANS OF A REVERSAL OF FLOW, PRESSURE �ROP, PRESSURE LOSS, INDUCE� VAWUM OR BY INJECTION BECAUSE OF ANY PRIMARY OR AU%ILIARY PUMPING SYSTEM WNNECiED THEREiO MUSi BE ISOLAiED AND CONiAINE� BY MEANS OF APPROVE� BACKFLOW DEWCES SUCH AS CHECK VALVES, AIR GAPS, OR VACUUM BREAKERS. PWMBING CON7RACi0R SHALL FURNISH AND INSTALL THESE OENCES PER LOCAL CODE REQOIREMENTS. D. ALL ROOF PENE7RATIONS FOR ROOF �RAINS AN� PWMBING/GAS/ REFRIGERANT PIPING SHALL BE MA�E IN ACCOR�ANCE WITH ROOF SYSiEM MANUFACNRER'S GUI�ELMES. COOR�INAIE WI7H ARCMiECTURAL �ETAILS AN�/OR LANOLORD FOR ROOF SYSiEM USE�. 18. iHE NAiURAL GAS SERVICE SHALL BE LOW PRESSURE. hiE REGULAiOR OU1LEi PRESSURE SHALL BE 7" WAiER COWMN. IF iHE GAS COMPANY IS 11NA8LE TO PROVI�E THIS PRESSURE,IMMEDIAIELY CONTACT THE A/E OR OWNER FOR INSiRUCiIONS. 19. HOLD TOP OF FLOOR DRAINS FLUSH WITH FINISHED FLOOR. �0. pq7Eg pIPING BELOW SLAB SHALL BE iYPE "N" SOFi IEMPER COPPER. NO JOINiS ALLOWED BELOW SLAB. 21. PWMBING WNTRACTOR SHALL FORNISH AN� INSTALL INOIRECT WASTE PIPING REOUIRE� FROM EQUIPMENi i0 FLOOR DRAINS, OPEN RECEPiACLES OR FLOOR SINKS. PIPING SHAl1 COMPLY WITH SiAIE AN� LOCAL CO�ES. COORDINAIE W1h1 ALL EOUIPMENT SUPPLIERS AND SIZE AS REOUIRED BY PIECE OF EQl11PMENi SERVED. HOLD PIPING TIGHT TO WALL WHERE APPLICABLE. 22. VTR'S SHALL E%TEND 1" ABOVE WALL HEIGHT WHEN PARAPET ROOF CONS7RUC➢ON IS INDICAiE�. zs. Noh Nor usEo. 24. PWMBING WN7RACTOR SHALL MSTALL ALL SOIL AND WASTE PIPING Wi7H A MINIMUM SLOPE OF 1/4" PER f00T UNLESS O7HERWISE REQUIRE� BY hIE STAIE OR LOCAL ADMINISTRAPVE AUiHORITY 25. ALL INSTALLED SYSTEMS, �ENCES AN� RELATED ITEMS SHALL BE TESTED IN PLACE ON SIiE. REPLACE ANY AN� ALL WN7RACTOR SUPPLIE� �EFECPVE DENCES,ITEMS OR SYS7EM5 AT CON7RACTOR'S OWN ENPENSE BEFORE COMPLEiION OF PROJECi. 26. MAiERIALS, EQUIPMENi, ASSEMBLIES AN� SYS7EM5 SHALL MEEi ALL PER➢NENT REQWREMENTS OF NAiIONALLY RECOGW2E� TESIING RELEASED FOR CONSTRACTION "THE'sAn�`i�A'c oE nr�io iocn�As Su6jec��o compliance with allregula�ions 04 S�a�e antl Local Codes City of Carmel `�j sv�� �\'��v�AWnT � � DATE: OZ�� 3�ZO PLUMBING GENERAL NOTES 27. CONTRACTOR SHALL GUARAN7EE ALL WORK FOR WHICH MAiERIALS ARE FORNISHEq FABRICAiED OR FlELD ERECiED, ALL FACTORY ASSEMBLED E�l11PMEM PoR WNICH NO SPECIFlC MANOFACIDRER'S GUARANIEE IS FURNISHE� AN� ALL WORK IN CONNECTION WIIH hIE MSTALLAiION OF MANOFACIDRER'S GUARANIEE� EOUIPMENT. THIS CONiRACTOR'S GUARANTEE SHALL EXIST FOR A PERIOD OF ONE (1J YEAR FROM iHE DAiE OF FlNAL OWNER ACCEPTANCE OF 7HE WORK (U.O.N.) AND SHALL APPLY TO ALL �EFECTS IN MATERIALS ANO/OR WORKMANSHIP OF ANV KIND. 28. ALL PERMIiS AN� FEES REQUIRE� FOR iHE WORK SHALL BE SEWRED AND PAID FOR BY THE CONTRACTOR AND INCLUDED IN hiE BID PRICE. 29. WHERE JOB CON�ITIONS REOUIRE CHANGES FROM THE CONTRACi DOCUMENTS THAT �0 NOT CHANGE THE SCOPE OR NATURE OF 7HE WORK RWUIRE�, THE CON7RACTOR SHALL MAKE SUCH CHANGES WIiHOUi ADDIiIONAL WSi i0 iHE OWNER. NO OiHER CHANGES MAY BE MADE WIiHOUT WRITIEN PERMISSION OF iHE OWNER. 3�. ALL EQUIPMENi, FIXiURES AN� MAiERIALS SHALL BE NEW AND UNUSE�, AND INSiALLE� IN SiRICi CONFORMANCE i0 MANUFACNRER�S RECOMMEN�A710NS (U.O.NJ. PROWDE COMPLEIE WI1H ALL 1RIM, S10PS, P 1 I HANGERS CARRIERS SUP ORiS E C. INCLUDING PROVISON fOR iHE HAN�ICAPPE� IF RE UIRE�. WHERE FIX7URE5 ARE ACCESSIBLE TO THE Q HAN�ICAPPE�, FIXlURES MUST COMPLY WIIH ALL FE�ERAL A.D.A. REGULAPONS. 31. hIE HOT AN� COLD WATER Sl1PPLY BRANCHES FOR ALL EOUIPMENT HAVING QUICN CLOSING VALVES OF ANY i1PE SHALL HAVE WAIER HAMMER ARRESiORS IN4ALLE� ON hiE HIGH POINi Ai iHE END OF EACH BRANCH. 32 hIE WATER PIPING SYS7EM SHALL BE FWSHED AND STERILIZED IN ACCOROANCE W1iH WDE REQl11REMENTS. WATER PLAN NOTES 1. �RAIN PAN �ISCHARGE LME �OWN TO SERNCE SINK. 2. T&P RELIEF VALVE DISCHARGE LWE DOWN i0 SERNCE SINK. 3. COOR�INATE WITH WASiE PIPING FROA1 F�'S ABOVE. 4. WATTS �OUBLE CHECK ASSEMBLY APP'�. BY LOCAL CO�E OFFlCIAL. INSTALL AT A HEIGHT DEIERMINE� BY WAIER COMPANY & ACCESSIBLE FOR MAM7ENANCE QF REO'D). PROVI�E ORAIN W1iH FACTORY AIR GAP ROUiE� i0 SUMP PUMP. 5. AMiROL ST-5 E%PANSION TANK. CONNECTED TO WAIER SERVICE AFiER MEIER AND BACKFLOW PREVENiER PER MANUFACIDRER REQUIREMENiS. 6. PWMBING CON7RACTOR TO ROUGH-IN 10" PVC CON�UIT. SEE ARCHIIECNRAL SHEET A-1 & A-7. 7. 1-1/2" SHUiOFF VALVE. B. NOT USE�. 9. GAS MEIER & PRIMARY REGULATOR BY LOCAL GAS CO., AT 7° WAiER COWMN, EX7EN� PIPING FROM MEiER W17H 1Y" VALVE� GAS LWE UP MTO JOISi SPACE. 10. SYMMONS MA%LINE MODEL 5-210-CK iEMPERING VALVE (OR EQUAL) FOR SINK. VALVE SHALL BE ASSE 1070 COMPLIANT. 11. �OMESTIC WAIER SERNCE. WAiER MEIER ON SIIE BY SIIE CONiRACTOR. v�reirr iN ric�o. cooreoiNnh vnm c.c. nNo unutv coMPnNr. 12. 1/2" GAS TO FURNACE (�. PROVI�E SHUTOFf VALVE, UNION AND oianEc NOIE: ALL SYMBOLS SHOWN MAY N07 APPEAR IN iHESE DOCUMENiS. FM SAN OSAN T -G - J� V1R O �I� �D� N � d V � \ � AFF AFG 000 �l FORCE MAIN SOIL AND WASTE PIPING OIL LA�EN SOIL AND WAS1E PIPING VENT PIPING COLD WAIER PIPING (CW) HOT WAiER PIPING (HWJ ffMPERED HOT WATER PIPING GAS PIPING VENT-THRU-ROOF UNION BACKFLOW PREVENiER CHECK VALVE BALL VALVE ffMPERAIURE/PRESSORE RELIEF VALVE MANUAL GAS SHUi OFF VALVE FLOOR DRAIN, W�1RAP CLEANOl1T naov� FiNisHEo F�ooa ABOVE FlNISHE� GRADE FIXNRE OR NOiE DESIGNA710N5 HOSE BIBB WITH BACKFLOW PREVENiER ICE MAKER BOX TO BE OAiEY 3882J OR EQIIAL. REFER To SITE PLAN. 1/2" 1/2" CW LME UP. ., >_-.. I .. CHANGING ROOM P-� CKERSI _� I COAT R CKIBREAK � - . } e._ . a r.__.- AREA �_��q" CW & J�4"�i - HW LME 11P � � !. I \i I �� ✓ �l � r. r --_ L --_ Ir1 1�4" STAIR LOWER LEVEL \�I' 4 � � I ` P � � � " BULKOIL LUBEPIT I - - - - - - - - - - - - - � � 1/Y CW LME UP. LOWER LEVEL FLOOR PLAN sr.ni e i ia,� = i�_o' 1 ��� 0 1�7' CW IJNE �OWN. � . ��� I . . .I �I }��I STORA6E P� I I ; ROOM 3�q" �I G MECHANICAL � e��.. --r� 3/ �, I����I 1 1/4 T12 � F-1 MBH 40 � j� ....._ I� � ' i�.. ��r P��I Dc I OFFICE y UNISEX rl c3i3 RESTROOM LI P2 10 � _ �-` � I �� _�_ Q � l k �L�� 0 � WAITINGAREA � � � - I IDDGQ i�v�i weT�Q s� SCALE 1/4" _ CIW & 3/4 BAvi RH-1 I -'�Jp � [�- I � BAV 2 -� _---�I P7 �� J i/za cw uNE oowN. PLAN q�' , � � � _. � 1" RN-2 75 MBH � � �. -3/4" CW LINE UP. cw uNE oN. TO WIIIPMENT. (WASHER FWI�� CW LME DN. ID EQUIPMENT. (WASHER RUID) C�J� ■\�.CF601NC.0 PHONE 1990Jfifi5 OfifiO � A IBBB 298-aBE �o P� i i I� I L/ Ii ` � �.. �I ' � � � �i i ..... 1 1 �4" I I �i/d" F'I I . RH-3 75 ;�� I IABH 7� 3/4" CW LINE �OWN. I BAV3 - i i I I I I _ - - - � �II ,1,q;N H, a�cv/�i.,, ;'\P,.-'�siER •,�3.. `-,-��V F�. � '-�y � No.PE10809267 �� I- . ,.rnr[ 11F . '�_�'������ 756309-01 "''� AS NOTEC �.,� WH: n_�� WHS ''^ 08.09.15 �mei'g-Ilc WATER PLAN , �-9�., P-2 E � w � K r tt � w z a o FROM GAS MAIN. SEE SIIE PLAN N M O Ll.� � � z z - = W U J � OU o �pp Q A o � � � � z Z z (� � U Q � i Z LI J M � � CESO,WC O-O -�