Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
VIOC CARMEL, IN - PP4 Process Piping Plan--
QUANTITV MFGR COORDINATE NUMBER OF TANKS AND LOCATION OF WASTE TANKS WITH A-1 SHEET THIS PLAN FOR REFERENCE ONLY ODESCRIPTION 1 5'. 1 MOTOR OIL PIIMP - STl1B 2 50�.iCHA5515GREASEPUMPWITHCOVERANDFOLLOWER 3 MALE A�APTER V2" 4 AIRLWEFlLTER/MOISTURESEPARATOR3/4"F 5 CAMLOCKAOAPTER2"Mx2"M 6 MOTOROILGONTROLVALVE-METERED ] MALE ADAPTER 1/2" e GRFASE"Z"SWIVELI/4"MxV2"-2]M 9 BALLVAWEI/2"F 10 AIRHOSE3l8"I.D.x3'il4"MBE O11 AIRDISTRIBUTION-TRUNKLWE3/4"TVPEKWPPER 12 SWIVELADAPTOR-il2"MIF 13 MOTOR OIL CONNEGTING HOSE- il2" ID. x 5'w-0l2" MIM O9 16 14 OIL DISTRIBUTION LWE 5/8" O.D. SEAMLESS STEEL.035 WALL 15 OIL�ELNERYHOSE-il2"ID.x18'il2"MxM 16 SWNELAOAPTER-3/8"MxF 1] CHASSISCONNECTINGHOSE-il4"I.D.xS'3I8"MBE O9 16 18 GREASE OISTRIBUTION LWE 5/8" OD. SEAMLESS STEEL A83 WALL iB H06EA�APTER-V2'NPTxV2"-2]N6(M) 20 CHA5515 GREASE SUPPLV HOSE - 1/4" ID. x 5' 3/8" M6E 21 HOSEROLLERASSEMBLV(SINGLE) O3 22 ROLLING OIL ORAIN PAN 23 DOUBLETAPBUSHING 24 GAl1GE,TANK2" ia ia zs wnsreoi�rnNKz-soocn�. !4" MB� RELEASED FOR CONSTRl1CTI0N ,� � S,N��E �oMPARTMENT Su6jec��ocompliancewithallregula�ions THST.GHUGKI/4^F 04 S�a�e antl Local Codes �. M City of Carmel ' F ' '�� 4NCHLWEI/2"TVPEKCOPPER `�j¢a�� �Vomn�pdJ � 14 0 so 1 1 18 0 0 64 6 AS RW'D. 15 14 AS REO'D. 26 0 0 AS RE�D 0 0 12 3 AS REO'D. AS REp'D. AS RE�'D. , 0 1 6 21 21 AS REQ'D. ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE WUIP. INST. ALEMITE ALEMITE EpUIP. WST. ALEMITE ALEMITE ALEMITE EpUIP.INST. ALEMITE ALEMITE ALEMITE 6V OWNER EpUIP.INST. BV VALVOLINE BV VALVOLWE E��IP.INST. B� �A��o��NE BV VALVOLWE ALEMITE ALEMITE ALEMITE EQUIP.INST. PARTtt 9968 9950-A1 51888 5612-2 338530 36]0 63203 B52]52 SWA-2]4 31]8033 NONE 1000-88 31]813-5 NONE 339648-18 �OOP88 31 ]8]6-5 NONE 30]925 31]e]S20 3383]8 NONE NONE NONE NONE NONE NONE NONE 306586 B328034 B328030 NONE ODESCRIPTION 33 3I8"IDx25'AIRHOSEil4"MBE 34 CAP,OUST3"CAMLOCK 35 A�APTER, MALE il4" 36 VALVE, HIGH PRESSURE 1/2" 3] AIRLWEFILTER/MOISTURESEPARATORI/4"W/AUTODRAIN 38 REGULATOR W/ GAUGE 1/4" F 39 HOSEGUIDEASSV.-6POSITION 4� USE OIL EVACIJATION PUMP 1" 1.1 DIAPHRAGM 41 SWNELAOAPTERI"M/F 42 FILLCAPHINGED2" 43 WASTE OIL DR91N LWE 2' BLK. STEEL PIPE 44 ANTIFREEZE SINK 45 TANK200GALPOLV. (WASTEANTIFREEZE) 46 ADAPTER. MALE 1/4" x 1/2" q� AIRHOSE3/8"IDx]'LONG 1/4"MBE 48 AUTO�RAIN-MOISTURESEPARATORFOR5612-2 49 BlISHINGil4"FxV2"M 50 EVAC HOSE W/ WANDS 51 EVACVALVE-Dl1AL 52 MALE ADAPTER 3/4" x 3/4" 53 BALLVALVE-3/4"F 54 HOSEASSEM6LV3/4"M6E3/4"IDxiSLG 55 HOSEASSEMBLVI"MBE1"IDxS'LG.-ATUSEDOILPUMP 56 RE�l1CWG Bl1SHWG 1" MPTx VY FPTAT EVAC WAND 5] WASTE STE OIL DRAIN LWE 1" BLK. STEEL PIPE 58 SIICTION TIIBE 1 V2" 59 GEAR LUBE CONTROL VAWE 60 A.T.F. CONTROL VALVE 61 6USHING, 6LK. STEEL 2" x 1 1/2" 62 NIPPLE. BLK. STEEL 1 il2" x 2" LG. 63 VALVESHIITOFFiV2" 64 ELBOW. BLK. STEEL 11/2" QUANTITV MFGR PARTtt 6 0 22 0 14 14 0 i 2 AS REO'D. AS RW'D. 1 1 14 12 1 16 3 0 1 1 0 2 3 AS RE�'D. AS REO'D. 3 5 AS RE�D AS REO'D. AS REO'D. AS REQ'D. ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE BV VALVOLINE WUIP. INST. ALEMITE 6V VALVOLINE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE WUIP. INST. EpUIP. INST. ALEMITE ALEMITE ALEMITE E�UIP. INST. ALEMITE ALEMITE ALEMITE E�UIP. INST. EpUIP. WST. EOl11P. INST. EQUIP. INST. 3 V 8�3-25 338540 32]�33 308]85 5644-1 SM ]604-6 338395 8323 1000-1616 NONE NONE 33852] NONE 130552 31]803-] 33454]-� 51891 33855] 338556 NONE NONE 31]84945 SWA2]9 320354 NONE NONE 36]3 36]2 NONE NONE NONE NONE ODESCRIPTION 65 HOSEASSEMBLEVI"MBESINGLEWIRE-WASTEOILPANS 66 BALLVALVE 1"FPT 6] CAMLOCKCOUPLERIADAPTERASSEMBLVI" 68 MUFFLER-AIRCOMPRESSOR 69 ADAPTER 1" MPT x 1" MPT NIPPLE ]0 6RAGKET/HOLSTERFORGRFASEANDGEAROILHANDLES ]i NEWOILTANKSOOGAL250/25000MPARTMENTS 13 14 ]2 DIAPHRAGM PUMP ]3 MIN6RLTER/REGULATOR 1/4"FPT ]4 WALLMOUNTBRACKETFOR8322ANTIFREEZEPUMP ]5 HOSE FORANTIFREEZE AND W/S WASH SOWENT ]6 COVER-GEAROILPUMP(9968) ]] GONNEGTION HOSE FOR ANTIFREEZE AN� WIS WASH PUMP ]8 SUCTION HOSE FORANTIFREEZE AND W/S WASH PUMP 1/2" MPT ]9 6166 FOR ANTIFREEZE AN� W/S WASH SOLVENT 80 REOUQNGBUSHINGV'MPTx�/T'FPT-839W/SWASHPUMP 81 SUCTION TIIBE FOR GEAR OIL PIIMP (9968) 82 HOSE STOP 83 "V"STRAWERFORWASTEOILPIIMP 84 WINDSHIELOWASHERPUMPULLISTEDFORMETHANOL 85 WALL MOUNT BRACKET FOR WASTE OIL 8 WINDSHIELD WASH 13 14 86 NEWOILTANK200/200/200GOMPARTMENT 13 14 8� ANTIFREEZE TANK', WITH PNEUMATIC PUMP 88 ANTIFREEZE Sl1CTION Tl1BE 1" I.D. TO LENGTH 89 PVCDRAWFROMANTIFREEZESINKTOTANK 9� ELECTRICAlITO-DRAINFORAIRCOMPRESSOR 91 500 GAL 1 COMPARTMENT TANK QUANTITV MFGR PARTtt 3 9 3 1 9 9 2 0 1 4 1 2 4 2 1 8 1 1 2 2 1 AS RE�'D 1 2 ALEMITE SWA2]9 EpUIP.INST. NONE EOl11P. WST. NONE 6VVALVOLWE 6VVALVOLWE EpUIP.INST. NONE EQUIP.INST. NONE BVVALVOLWE NONE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE EpUIP.INST. NONE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE ALEMITE 6VVALVOUNE NONE BVVALVOLWE NONE EQl11P.INST. NONE E�UIP.INST. NONE BVVALVOLWE NONE BVVALVOLWE NONE KEVEDNOTES'. OALL CORE DRILLWG WILL BE PROVIDED BV GENERAL CONTRACTOR O4QUIP�ME 34SUPPLV TO SUPPLV AND INSTALL FOR IISED OIL E%TRACTION FROM IISED OIL TANKS TO RECV0.E COMPANV OROLLING DRAIN PROVIDED BV OWNER. HARDWARE REQUIRED TO CONNECT EVAC HOSETO EACH DRAIN PAN - BV ALEMITE'. 2 EA. 1" MBE ADAPTER (336843); 2 FA. 1" BALL VALVE (SWA300); 1 EA. 1' Sl1CTION HOSE (SWA2]9)'. -INSTALLERPROVIDE� 1 EA. 11/2" MPTxi"FPT REDIICING BlISHING; 1 EA. 1" MALE CAMLOCK A�APTER; 1 FA. 1"CAMLOCK �UST CAP; 1 EA. 1" FPT CAMLOCK COUPLER', 1 EA. 1" CAMLOCK �UST PWG OAIRDISTRI6UTIONTRUNKLWETO6ESLOPED TOWARDSAIRFLOWDIRECTION �� OGD.TOPROVIDEELECTRICALQRCUITSTOJ.6lSFOR OPENER MOTORS 8 CONTROLS OPQCDR4INTLWEPROMAN�IFREEZESWK44NTED2" TOUSEDANTIFREEZETANK qs O G.C. TO SECl1RE SINK TO WALL ODONOTUSETEFLONTAPEONFWIDAND EOl11PMENT THREADS, DO NOT lISE PIPE SEALANT OG.C.TOPROVIDEHOOKSONWALLSAT36"A.F.F. FOR ITEM 1f29 OFWSHOILANDGREASETl1BWGWITHACLEANWG SO W TION eEFORE CONTROL VALV ES ARE WSTALLED. AFTERCLEANINGBLOWALLLWES CLEAN WI COMPRESSE� AIR �p EQUIPMENTINSTALLERTOSUPPLVANDATTAGH PIPINGITUBING FOR WINDSMELD WASH SVSTEM. PWMBER TO ATTACH WATER SUPPLV AND APPROPRIATED WATER ROW VALVE (PERAREA CODE) �� PRESSURETESTFLUIDANDAIRPIPINGANDTANKS BV PRESSIIRIZING Wl AI R T0 2-4 PSI MA%AND HOLDING THAT PRESSURE FORTWO HOURS. TEST IS SATISFACTORV IFTHERE IS NO PRESSURE LOSS DURINGTHETWOHOURTEST. PRESSURETESTS ARE TO BE PERFORMED I N THE PRESENCE OF AN OWNER'S RESPONSIBILITI' 12 EOl11PMENTINSTALLERTOFIIRNISHALLFWIDAND AIR TUBING AND FlTTINGS. �3 BIILKOILTANKSSEENOTEII A. G.G-RECEIVEANDUNLOADTANKSINSPECT FOR DAMAGE THEN SET IN PLACE B. PLUMBER-INSTALLVENTSCOMPLETE C. PLUMBER- WASTE OIL VENT TO BE DEDIGATED, DO NOT TIE INTO NEW OIL VENTS. - NEW OIL VENT CAN BE MANI FOLDED ATGEILING OR HIGHER (LOGAL CODEREQJ �q UNLESSOTHERWISESPECIREDBULKOILTANKS SHALL BE INSTALLED APPROXIMATELV AS SHOWN ON DRAWING AND SET IN PLAGE 6V GD. 15 WARNINGHIGHPRESSIIREGRFASELWES,TIIBING MUST 8E CAPABLE OF 8,000 PSI MA%. WORKWG PRESSURE', OILS - 1000 P51 MAX. PRESSURE �ESIGN CRITERIA�. WBRICATION OIL PIPWG�. A FURNISHANDINSTALLSTAINLESSSTEELSEAMLE55 HVDRAULIGLINETU6ING. SIZE6ASEDONKEVEDNOTES. MEETS S.A.E. STANDARDS. W 6RIGATION OIL PI PE RTTINGS�. A FURNISHANDINSTALLO-RINGSEALSTEELHVDRAULICTUBE connaaessoN FiTTwcs. MEETS S.0.E STANDARDS. TEFLON BACKl1P WASHER; O-RWG SFALS THE Tl1BE, SE IS NOT DEPENDENT UPON THE TIGHTNE55 OF THE NUT SIZE BASED ON PIPING SIZES. COMPRESSED AIR PIPI NG�. A FURNISHAN�INSTALLSOFT�RAWNTVPE'K'GOPPER TUBWGWITHSILVERSOLDEREDJOINTS. SIZE&4SEDON KEVEDNOTES. WASTEOIL PIPING�. A FURNISHANDINSTALLSCHEDULE4�BLACKSTEELPIPWG WITH THRFADED JOINTS. SIZE BASED ON KEVED NOTES. WASTEOIL PIPING FlTTINGS�. A. ALLTHREA�EDFlTTWGSTOBECASTOR�UCTILEIRON. PiPwc �^'�TR-4bdT�Tn� aiaiNc sHn�� eE RUN ananuE� ro oRnr RIGHT ANGLES TO WALLS; RISERS SHALL BE INSTALLED PERPENDICULAR TO ROORS AND CEILING. B. CHANGES IN DIRECTIONS SHALL BE MADE WITH RTTINGS. G NO DIRECT CONNECTION BETWEEN DISSIMILAR METALS IS PERMITTE�. PROVI�E�IELECTRICUNIONSAN�RTTWGSAS REQUIRED FOR THE TYPE OF PIPE JOINTS BEWG INSTALLED. PIPWG SUPPORTS AN� HANGERS�. A FURNISHANDINSTALLALLINSERTS.BEAMCLAMPS.AND EXPANSIONSHIELDSRE�UIRED. PROVIDEUNISTRUTOR EQUAL CHANNELS, ATTACHED WITH AT LEAST 2 BOLTS, FOR PROPER SIIPPORT. 6. HANGERS SHALL 6E EITHERTRAPEZE, SPLIT RING, OR 0.EVIS TVPE ON ADJUSTABLE RODS. HANGERS IN DIREGT GONTAGT WITH GOPPER TU61NG SHALL 6E COPPER PLATED. ALL THREAD RODS SHALL BE CADMIUM PLATED. C. ANGHORPIPINGATGHANGESINDIREGTIONOR WHERE BRANCH LINES CONNECT TO A MAIN. FLUIDN DESCRIPTION 1 OPEWFUTURE 2 OPEWFUTURE 3 OPEN/FIITIIRE 4 SW3� 5 SW30mz 6 SW20 ] SW30db 8 SW305yn 9 9TH OIL io swzomx �� swzodb 12 SW30mx5yn �3 ATF ,4 oPEN�F�T�RE 15 OPENIFUTURE 16 OPEWFUTURE 1] OPEWFUTURE 18 OPEWFUTURE 19 OPEN/FUTURE anorvE�.t�.wE�sscas�w ru�.tsse�zos�uzs � ol� E rc � w � w vwi K r rc � w Z a O N M O � W'n � v z z — Q J = lJJ Ug J a' Q Q � �U V Q Q � � ;o Z � w Q z � � U Q� � z � M � � -` e AR70500002 ! �. = �` B'E7F�Of � �� �I ��', � '�fi� �'r�. �`� � r �, , ,,,,,,�.,, = . ��,, / �, pli 9 I, a�oieaNa 75630�01 s`�1e AS NOTED orawn CE$Q a'a«m BWH oeie p8.09.19 oawingTtlle PROCESS PIPING PLAN orawingNo. PP-4 DATE: OZ�� 3�ZO