Loading...
HomeMy WebLinkAbout_VIOC CARMEL, IN - Envelope COMcheckCOMcheck Software Version 4.1.1.0 Envelope Compliance Certificate Project Title: 90.1 (2007) Standard Project Type:New Construction Vertical Glazing / Wall Area:6% Location:Carmel, Indiana Climate Zone:5a Construction Site: 9835 N MICHIGAN ROAD Carmel, IN 46032 Owner/Agent: Richard Gallegos Valvoline Instant Oil Change 100 Valvoline Way Lexington, KY 40509 (972) 202-6674 Richard.Gallegos@valvoline.com Designer/Contractor: Ben Bell CESO Inc. 175 Montrose West Ave. Suite 400 akron, OH 44321 330-396-5669 bell@cesoinc.com Project Information Energy Code: Valvoline Instant Oil Change-Carmel, IN Building Area Floor Area 1-Office/ Storage (Automotive Facility) : Nonresidential 342 2-Garage/ Basement (Automotive Facility) : Semiheated 3810 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof over conditioned space: Attic Roof with Wood Joists, [Bldg. Use 1 - Office/ Storage] 427 38.0 0.0 0.027 0.027 Exterior Wall 1: Wood-Framed, 16" o.c., [Bldg. Use 1 - Office/ Storage]190 21.0 0.0 0.062 0.064 Exterior Wall 2: Wood-Framed, 16" o.c., [Bldg. Use 1 - Office/ Storage]190 21.0 0.0 0.062 0.064 Entry Storefront: Metal Frame Curtain Wall/Storefront, Perf. Specs.: Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 1 - Office/ Storage] (c) 86 ------0.660 0.450 Entry door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Type: Energy code default, Double Pane with Low-E, Clear , SHGC 0.68, [Bldg. Use 1 - Office/ Storage] 21 ------0.900 0.800 Exterior Wall 3: Wood-Framed, 16" o.c., [Bldg. Use 1 - Office/ Storage]434 21.0 0.0 0.062 0.064 Waiting Area Storefront: Metal Frame Curtain Wall/Storefront, Perf. Specs.: Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 1 - Office/ Storage] (c) 35 ------0.660 0.450 Mechanical Room Door: Insulated Metal, Swinging, [Bldg. Use 1 - Office/ Storage] 46 ------0.100 0.700 Demising Wall 4: Wood-Framed, 16" o.c., [Bldg. Use 1 - Office/ Storage] 434 21.0 0.0 0.062 0.064 Office Storefront: Metal Frame Curtain Wall/Storefront, Perf. Specs.: Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 1 - Office/ Storage] (c) 20 ------0.660 0.450 Entry Storefront: Metal Frame Curtain Wall/Storefront, Perf. Specs.: Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 1 - Office/ Storage] (c) 31 ------0.660 0.450 Entry door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Type: Energy code default, Single Pane, Clear , SHGC 0.82, [Bldg. Use 21 ------1.250 0.800 Project Title: Data filename: Valvoline Instant Oil Change-Carmel, IN \\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09- SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck 01/07/20Report date: 101 ofPage Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter 1 - Office/ Storage] Storage Room door: Insulated Metal, Swinging, [Bldg. Use 1 - Office/ Storage] 21 ------0.100 0.700 Floor 1: Concrete Floor (over unconditioned space), [Bldg. Use 1 - Office/ Storage] 434 ---0.0 0.322 0.074 Roof over Semiheated space: Attic Roof with Wood Joists, [Bldg. Use 2 - Garage/ Basement] 1514 38.0 0.0 0.027 0.053 Floor 2: Slab-On-Grade:Unheated, [Bldg. Use 2 - Garage/ Basement] (d) 196 ------0.730 0.730 Exterior wall 1 Semiheated Space: Wood-Framed, 16" o.c., [Bldg. Use 2 - Garage/ Basement] 702 21.0 0.0 0.062 0.089 Garage Door: Other Door, Non-Swinging, [Bldg. Use 2 - Garage/ Basement] 120 ------0.900 1.450 Garage Door: Other Door, Non-Swinging, [Bldg. Use 2 - Garage/ Basement] 120 ------0.900 1.450 Entry door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Type: Energy code default, Single Pane, Clear , SHGC 0.82, [Bldg. Use 2 - Garage/ Basement] 23 ------1.250 1.200 Exterior wall 2 Semiheated Space: Wood-Framed, 16" o.c., [Bldg. Use 2 - Garage/ Basement] 434 21.0 0.0 0.062 0.089 Exterior wall 3 Semiheated Space: Wood-Framed, 16" o.c., [Bldg. Use 2 - Garage/ Basement] 702 21.0 0.0 0.062 0.089 Garage Door: Other Door, Non-Swinging, [Bldg. Use 2 - Garage/ Basement] 120 ------0.900 1.450 Garage Door: Other Door, Non-Swinging, [Bldg. Use 2 - Garage/ Basement] 120 ------0.900 1.450 Demising Wall 4: Wood-Framed, 16" o.c., [Bldg. Use 2 - Garage/ Basement] 434 21.0 0.0 0.062 0.089 Office Storefront copy 1: Metal Frame Curtain Wall/Storefront, Perf. Specs.: Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 2 - Garage/ Basement] (c) 20 ------0.660 1.200 Entry Storefront copy 1: Metal Frame Curtain Wall/Storefront, Perf. Specs.: Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 2 - Garage/ Basement] (c) 31 ------0.660 1.200 Entry door copy 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Type: Energy code default, Single Pane, Clear , SHGC 0.82, [Bldg. Use 2 - Garage/ Basement] 21 ------1.250 1.200 Storage Room door copy 1: Insulated Metal, Swinging, [Bldg. Use 2 - Garage/ Basement] 21 ------0.100 0.700 Basement Wall 1: Solid Concrete:12" Thickness, Normal Density, Furring: None, Wall Ht 8.9, Depth B.G. 8.9, [Bldg. Use 2 - Garage/ Basement] 569 ---7.5 0.110 0.579 Basement Wall 2: Solid Concrete:12" Thickness, Normal Density, Furring: None, Wall Ht 8.9, Depth B.G. 8.9, [Bldg. Use 2 - Garage/ Basement] 275 ---7.5 0.110 0.579 Basement Wall 3: Solid Concrete:12" Thickness, Normal Density, Furring: None, Wall Ht 8.9, Depth B.G. 8.9, [Bldg. Use 2 - Garage/ Basement] 569 ---7.5 0.110 0.579 Basement Wall 4: Solid Concrete:12" Thickness, Normal Density, Furring: None, Wall Ht 8.9, Depth B.G. 8.9, [Bldg. Use 2 - Garage/ Basement] 275 ---7.5 0.110 0.579 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)'Other' components require supporting documentation for proposed U-factors. (c)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (d)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Project Title: Data filename: Valvoline Instant Oil Change-Carmel, IN \\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09- SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck 01/07/20Report date: 102 ofPage Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Envelope PASSES: Design 5% better than code Project Title: Data filename: Valvoline Instant Oil Change-Carmel, IN \\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09- SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck 01/07/20Report date: 103 ofPage Benjamin T. Bell 01/07/2020 Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.1.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 90.1 (2007) Standard Section # & Req.ID Plan Review Complies?Comments/Assumptions 4.2.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Valvoline Instant Oil Change-Carmel, IN \\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09- SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck 01/07/20Report date: 104 ofPage Section # & Req.ID Footing / Foundation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 5.5.3.3 [FO1]1 Below-grade wall insulation R- value. R-_____R-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.2 [FO2]1 Below-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.3.5 [FO3]1 Slab edge insulation R-value.R-_____ Unheated Heated R-_____ Unheated Heated Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.2 [FO4]1 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.3.5 [FO5]1 Slab edge insulation depth/length. _____ ft _____ ft Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.7.3 [FO7]1 Insulation in contact with the ground has <=0.3% water absorption rate per ASTM C272. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Valvoline Instant Oil Change-Carmel, IN \\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09- SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck 01/07/20Report date: 105 ofPage Section # & Req.ID Framing / Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 5.4.3.2 [FR1]3 Factory-built fenestration and doors are labeled as meeting air leakage requirements. Fenestration____ _ cfm/ft2 Doors_____ cfm/ft2 Fenestration____ _ cfm/ft2 Doors_____ cfm/ft2 Complies Does Not Not Observable Not Applicable Requirement will be met. 5.4.3.4 [FR4]3 Vestibules are installed where building entrances separate conditioned space from the exterior, and meet exterior envelope requirements. Doors have self-closing devices, and are >=7 ft apart. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.4.3a [FR8]1 Vertical fenestration U-Factor.U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.5.4.3b [FR9]1 Skylight fenestration U-Factor.U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.5.4.4.1 [FR10]1 Vertical fenestration SHGC value.SHGC:_____SHGC:_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.5.4.4.2 [FR11]1 Skylight SHGC value.SHGC:_____SHGC:_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.2.1, 5.8.2.4 [FR12]2 Fenestration products rated in accordance with NFRC. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.2.2 [FR13]1 Fenestration products are certified as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.2.3, 5.5.3.6 [FR14]2 U-factor of opaque doors associated with the building thermal envelope meets requirements. U-_____ Swinging Nonswinging U-_____ Swinging Nonswinging Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Valvoline Instant Oil Change-Carmel, IN \\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09- SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck 01/07/20Report date: 106 ofPage Section # & Req.ID Insulation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 5.4.3.1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor-permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.3.1 [IN2]1 Roof R-value. For some ceiling systems, verification may need to occur during Framing Inspection. R-_____ Above deck Metal Attic R-_____ Above deck Metal Attic Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.2, 5.8.1.3 [IN3]1 Roof insulation installed per manufacturer’s instructions. Blown or poured loose-fill insulation is installed only where the ceiling slope is <= 3:12. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.3.1.1 [IN5]3 High-albedo roofs meet solar reflectance of 0.70 and thermal emittance of 0.75 or SRI of 82. SR:_____ SRI:_____ SR:_____ SRI:_____ Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.3.2 [IN6]1 Above-grade wall insulation R- value. R-_____ Mass Metal Steel Wood R-_____ Mass Metal Steel Wood Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.3.4 [IN8]1 Floor insulation R-value.R-_____ Mass Steel Wood R-_____ Mass Steel Wood Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.2 [IN9]1 Floor insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.1 [IN10]2 Building envelope insulation is labeled with R-value or insulation certificate providing R-value and other relevant data. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.4 [IN11]2 Eaves are baffled to deflect air to above the insulation. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.5 [IN12]2 Insulation is installed in substantial contact with the inside surface separating conditioned space from unconditional space. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Valvoline Instant Oil Change-Carmel, IN \\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09- SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck 01/07/20Report date: 107 ofPage Section # & Req.ID Insulation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 5.8.1.6 [IN13]2 Recessed equipment installed in building envelope assemblies does not compress the adjacent insulation. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.7 [IN14]2 Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.7.1 [IN15]2 Attics and mechanical rooms have insulation protected where adjacent to attic or equipment access. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.7.2 [IN16]2 Foundation vents do not interfere with insulation. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.8 [IN17]3 Insulation intended to meet the roof insulation requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Valvoline Instant Oil Change-Carmel, IN \\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09- SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck 01/07/20Report date: 108 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions 5.4.3.3 [FI1]1 Weatherseals installed on all loading dock cargo doors in Climate Zones 4- 8. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Valvoline Instant Oil Change-Carmel, IN \\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09- SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck 01/07/20Report date: 109 ofPage Project Title: Data filename: Valvoline Instant Oil Change-Carmel, IN \\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09- SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck 01/07/20Report date: 1010 ofPage