HomeMy WebLinkAbout_VIOC CARMEL, IN - Envelope COMcheckCOMcheck Software Version 4.1.1.0
Envelope Compliance Certificate
Project Title:
90.1 (2007) Standard
Project Type:New Construction
Vertical Glazing / Wall Area:6%
Location:Carmel, Indiana
Climate Zone:5a
Construction Site:
9835 N MICHIGAN ROAD
Carmel, IN 46032
Owner/Agent:
Richard Gallegos
Valvoline Instant Oil Change
100 Valvoline Way
Lexington, KY 40509
(972) 202-6674
Richard.Gallegos@valvoline.com
Designer/Contractor:
Ben Bell
CESO Inc.
175 Montrose West Ave. Suite 400
akron, OH 44321
330-396-5669
bell@cesoinc.com
Project Information
Energy Code:
Valvoline Instant Oil Change-Carmel, IN
Building Area Floor Area
1-Office/ Storage (Automotive Facility) : Nonresidential 342
2-Garage/ Basement (Automotive Facility) : Semiheated 3810
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof over conditioned space: Attic Roof with Wood Joists, [Bldg. Use 1
- Office/ Storage]
427 38.0 0.0 0.027 0.027
Exterior Wall 1: Wood-Framed, 16" o.c., [Bldg. Use 1 - Office/ Storage]190 21.0 0.0 0.062 0.064
Exterior Wall 2: Wood-Framed, 16" o.c., [Bldg. Use 1 - Office/ Storage]190 21.0 0.0 0.062 0.064
Entry Storefront: Metal Frame Curtain Wall/Storefront, Perf. Specs.:
Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 1 -
Office/ Storage] (c)
86 ------0.660 0.450
Entry door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Type: Energy code default, Double Pane with Low-E, Clear , SHGC
0.68, [Bldg. Use 1 - Office/ Storage]
21 ------0.900 0.800
Exterior Wall 3: Wood-Framed, 16" o.c., [Bldg. Use 1 - Office/ Storage]434 21.0 0.0 0.062 0.064
Waiting Area Storefront: Metal Frame Curtain Wall/Storefront, Perf.
Specs.: Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 1
- Office/ Storage] (c)
35 ------0.660 0.450
Mechanical Room Door: Insulated Metal, Swinging, [Bldg. Use 1 -
Office/ Storage]
46 ------0.100 0.700
Demising Wall 4: Wood-Framed, 16" o.c., [Bldg. Use 1 - Office/
Storage]
434 21.0 0.0 0.062 0.064
Office Storefront: Metal Frame Curtain Wall/Storefront, Perf. Specs.:
Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 1 -
Office/ Storage] (c)
20 ------0.660 0.450
Entry Storefront: Metal Frame Curtain Wall/Storefront, Perf. Specs.:
Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 1 -
Office/ Storage] (c)
31 ------0.660 0.450
Entry door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Type: Energy code default, Single Pane, Clear , SHGC 0.82, [Bldg. Use
21 ------1.250 0.800
Project Title:
Data filename:
Valvoline Instant Oil Change-Carmel, IN
\\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09-
SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck
01/07/20Report date:
101 ofPage
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
1 - Office/ Storage]
Storage Room door: Insulated Metal, Swinging, [Bldg. Use 1 - Office/
Storage]
21 ------0.100 0.700
Floor 1: Concrete Floor (over unconditioned space), [Bldg. Use 1 -
Office/ Storage]
434 ---0.0 0.322 0.074
Roof over Semiheated space: Attic Roof with Wood Joists, [Bldg. Use 2
- Garage/ Basement]
1514 38.0 0.0 0.027 0.053
Floor 2: Slab-On-Grade:Unheated, [Bldg. Use 2 - Garage/
Basement] (d)
196 ------0.730 0.730
Exterior wall 1 Semiheated Space: Wood-Framed, 16" o.c., [Bldg. Use 2
- Garage/ Basement]
702 21.0 0.0 0.062 0.089
Garage Door: Other Door, Non-Swinging, [Bldg. Use 2 - Garage/
Basement]
120 ------0.900 1.450
Garage Door: Other Door, Non-Swinging, [Bldg. Use 2 - Garage/
Basement]
120 ------0.900 1.450
Entry door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Type: Energy code default, Single Pane, Clear , SHGC 0.82, [Bldg. Use
2 - Garage/ Basement]
23 ------1.250 1.200
Exterior wall 2 Semiheated Space: Wood-Framed, 16" o.c., [Bldg. Use 2
- Garage/ Basement]
434 21.0 0.0 0.062 0.089
Exterior wall 3 Semiheated Space: Wood-Framed, 16" o.c., [Bldg. Use 2
- Garage/ Basement]
702 21.0 0.0 0.062 0.089
Garage Door: Other Door, Non-Swinging, [Bldg. Use 2 - Garage/
Basement]
120 ------0.900 1.450
Garage Door: Other Door, Non-Swinging, [Bldg. Use 2 - Garage/
Basement]
120 ------0.900 1.450
Demising Wall 4: Wood-Framed, 16" o.c., [Bldg. Use 2 - Garage/
Basement]
434 21.0 0.0 0.062 0.089
Office Storefront copy 1: Metal Frame Curtain Wall/Storefront, Perf.
Specs.: Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 2
- Garage/ Basement] (c)
20 ------0.660 1.200
Entry Storefront copy 1: Metal Frame Curtain Wall/Storefront, Perf.
Specs.: Product ID Kawneer Tri-Fab VG451T, SHGC 0.68, [Bldg. Use 2
- Garage/ Basement] (c)
31 ------0.660 1.200
Entry door copy 1: Glass (> 50% glazing):Metal Frame, Entrance Door,
Perf. Type: Energy code default, Single Pane, Clear , SHGC 0.82,
[Bldg. Use 2 - Garage/ Basement]
21 ------1.250 1.200
Storage Room door copy 1: Insulated Metal, Swinging, [Bldg. Use 2 -
Garage/ Basement]
21 ------0.100 0.700
Basement Wall 1: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 8.9, Depth B.G. 8.9, [Bldg. Use 2 - Garage/
Basement]
569 ---7.5 0.110 0.579
Basement Wall 2: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 8.9, Depth B.G. 8.9, [Bldg. Use 2 - Garage/
Basement]
275 ---7.5 0.110 0.579
Basement Wall 3: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 8.9, Depth B.G. 8.9, [Bldg. Use 2 - Garage/
Basement]
569 ---7.5 0.110 0.579
Basement Wall 4: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 8.9, Depth B.G. 8.9, [Bldg. Use 2 - Garage/
Basement]
275 ---7.5 0.110 0.579
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b)'Other' components require supporting documentation for proposed U-factors.
(c)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(d)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Project Title:
Data filename:
Valvoline Instant Oil Change-Carmel, IN
\\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09-
SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck
01/07/20Report date:
102 ofPage
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Envelope PASSES: Design 5% better than code
Project Title:
Data filename:
Valvoline Instant Oil Change-Carmel, IN
\\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09-
SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck
01/07/20Report date:
103 ofPage
Benjamin T. Bell 01/07/2020
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 90.1 (2007) Standard
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
4.2.2
[PR1]1
Plans and/or specifications provide all
information with which compliance
can be determined for the building
envelope and document where
exceptions to the standard are
claimed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Valvoline Instant Oil Change-Carmel, IN
\\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09-
SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck
01/07/20Report date:
104 ofPage
Section
#
& Req.ID
Footing / Foundation
Inspection
Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
5.5.3.3
[FO1]1
Below-grade wall insulation R-
value.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
5.8.1.2
[FO2]1
Below-grade wall insulation
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.5.3.5
[FO3]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
5.8.1.2
[FO4]1
Slab edge insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.5.3.5
[FO5]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
5.8.1.7.3
[FO7]1
Insulation in contact with the
ground has <=0.3% water
absorption rate per ASTM C272.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Valvoline Instant Oil Change-Carmel, IN
\\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09-
SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck
01/07/20Report date:
105 ofPage
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
5.4.3.2
[FR1]3
Factory-built fenestration and
doors are labeled as meeting air
leakage requirements.
Fenestration____
_ cfm/ft2
Doors_____
cfm/ft2
Fenestration____
_ cfm/ft2
Doors_____
cfm/ft2
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.4.3.4
[FR4]3
Vestibules are installed where
building entrances separate
conditioned space from the
exterior, and meet exterior
envelope requirements. Doors
have self-closing devices, and are
>=7 ft apart.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.5.4.3a
[FR8]1
Vertical fenestration U-Factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
5.5.4.3b
[FR9]1
Skylight fenestration U-Factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
5.5.4.4.1
[FR10]1
Vertical fenestration SHGC value.SHGC:_____SHGC:_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
5.5.4.4.2
[FR11]1
Skylight SHGC value.SHGC:_____SHGC:_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
5.8.2.1,
5.8.2.4
[FR12]2
Fenestration products rated in
accordance with NFRC.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.8.2.2
[FR13]1
Fenestration products are
certified as to performance labels
or certificates provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.8.2.3,
5.5.3.6
[FR14]2
U-factor of opaque doors
associated with the building
thermal envelope meets
requirements.
U-_____
Swinging
Nonswinging
U-_____
Swinging
Nonswinging
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Valvoline Instant Oil Change-Carmel, IN
\\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09-
SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck
01/07/20Report date:
106 ofPage
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
5.4.3.1
[IN1]1
All sources of air leakage in the
building thermal envelope are
sealed, caulked, gasketed,
weather stripped or wrapped with
moisture vapor-permeable
wrapping material to minimize air
leakage.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.5.3.1
[IN2]1
Roof R-value. For some ceiling
systems, verification may need to
occur during Framing Inspection.
R-_____
Above deck
Metal
Attic
R-_____
Above deck
Metal
Attic
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
5.8.1.2,
5.8.1.3
[IN3]1
Roof insulation installed per
manufacturer’s instructions.
Blown or poured loose-fill
insulation is installed only where
the ceiling slope is <= 3:12.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.5.3.1.1
[IN5]3
High-albedo roofs meet solar
reflectance of 0.70 and thermal
emittance of 0.75 or SRI of 82.
SR:_____
SRI:_____
SR:_____
SRI:_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.5.3.2
[IN6]1
Above-grade wall insulation R-
value.
R-_____
Mass
Metal
Steel
Wood
R-_____
Mass
Metal
Steel
Wood
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
5.8.1.2
[IN7]1
Above-grade wall insulation
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.5.3.4
[IN8]1
Floor insulation R-value.R-_____
Mass
Steel
Wood
R-_____
Mass
Steel
Wood
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
5.8.1.2
[IN9]1
Floor insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.8.1.1
[IN10]2
Building envelope insulation is
labeled with R-value or insulation
certificate providing R-value and
other relevant data.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.8.1.4
[IN11]2
Eaves are baffled to deflect air to
above the insulation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.8.1.5
[IN12]2
Insulation is installed in
substantial contact with the
inside surface separating
conditioned space from
unconditional space.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Valvoline Instant Oil Change-Carmel, IN
\\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09-
SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck
01/07/20Report date:
107 ofPage
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
5.8.1.6
[IN13]2
Recessed equipment installed in
building envelope assemblies
does not compress the adjacent
insulation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.8.1.7
[IN14]2
Exterior insulation is protected
from damage with a protective
material. Verification for exposed
foundation insulation may need
to occur during Foundation
Inspection.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.8.1.7.1
[IN15]2
Attics and mechanical rooms
have insulation protected where
adjacent to attic or equipment
access.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.8.1.7.2
[IN16]2
Foundation vents do not interfere
with insulation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
5.8.1.8
[IN17]3
Insulation intended to meet the
roof insulation requirements
cannot be installed on top of a
suspended ceiling. Mark this
requirement compliant if
insulation is installed accordingly.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Valvoline Instant Oil Change-Carmel, IN
\\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09-
SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck
01/07/20Report date:
108 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
5.4.3.3
[FI1]1
Weatherseals installed on all loading
dock cargo doors in Climate Zones 4-
8.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Valvoline Instant Oil Change-Carmel, IN
\\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09-
SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck
01/07/20Report date:
109 ofPage
Project Title:
Data filename:
Valvoline Instant Oil Change-Carmel, IN
\\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\09-
SUBMIT\### IDHS Response #4\support docs\_VIOC CARMEL, IN - Envelope COMcheck (2).cck
01/07/20Report date:
1010 ofPage