HomeMy WebLinkAboutP102 3RD FL PLUMBING SIDE Az
x
U
4
�
�
�
�---�
B
MECH, ELEC, & PLUMBING DESIGN REQ.
. Refer�oa��achedM,EBPdrawingsformoreinfortna�ion.lfdrawingsareno�
ind�ded and scope req�ires M, P, or E work Contractor shall provide design b�ild-
design and permitting services for ihe scope required for a successful projecL
_. The clesign ancl installation of all MEPsystems shall comply with the c�rrentCocles
in fOICE by �hE AHJ p� �hE p101eC� IOCO�iOn_ Any IEqUiIEd EnElgy COmplipnCE OI
envTonmental reporh req�irecl by the AHJ shall be preparecl bythe Contractortf
no� prwided by�heOwnerorArchi�ecfscons�l�an�s.
J. Contractorto field verify all ewsting b�ilding conditions and systems affected by
the projectwoh and be familiarwith the drawings and project requirements pnor
�o bid or coNrac�ing wi�h Owner. No s�r�c W ral c W �ing, conng, or dnlling shall be
performed that impacts any part of the existing facility, withoW priorapproval.
CoNrac�orshall re�ain �he services of a 5�rucWral engineer, if required by �he
Architetl, Owner, orAHJ to obtain a req�ired approval.
d_ nrchitecWrol drowing hove been provided toshow ihe locationsof oll devices
and sys�ems-CoNrac�orshall be responsible forreconfigura�ions, modifica�ions,
and/or new work needed to provide a complete f�nctionirtq job witho W
permanently disr�pting easting b�ilding systems. Contractor shall coordinate with
Owner, Building Facili�ies, and oro�hertenan�548 hours minimum in advance of
any in�en�p�ion of any b�ilding service.
,�_ Archi�ecWroldrowingssholl�okeprecedenceoverollo�herhodesdrowings
when conflicts anse. Conhactorto bnng conflich orinconsistencies behmeen �he
amhi�ecWral drawings and �he drawing of o�her�rades �o �he a��eNion of �he
orchitect prior to bid, order, orin9ollotion_
u_ Firespnnklermodifica�ionsandnewwohshallbedesignedbyalicensedfire
spnnklerrys�em designerin �hes�a�e �he prolec� resides in, and m�s� be ins�alled
by a state licensed installec Contractor shall obtain any req�ired approvals from
�he AHJ pnor �o s�ah of consiruc�ion_
.. Zoning of MEP rystems shall be excWsive to ihe prol�� area withoW cross overto
other building oreas, except as is indicated on ihe documenis oros approved in
advance.
!L CoNracbr�o prwide all req�ired �es� and balance repor�s, O&M man�als, and
commissioning activities req�ired bythe AHJ or prolect req�irements in the
appropnate phases of the project.
.. Eds�ing hard d�c� �o remain as is. No new d�cN+ork req�ired. Re-work Hedble
duc� �o new diffuser loca�ions-
Note: E.C. and/or design b�ild coniratlor is to venry ihat prol�� meets I ndiona ASHRAE
SO I energy codes- Design intent is to be within wotis per square fooL Provide energy
managmen� coNrols.such a55ensorcoNrolS �ul�rasonic and mo�ion de�ec�ion� and/or
relay time clocks, as req�ired by ihe code. Indiona req�ired energy complionce report
IComCheck) is the responsibility of the owner or ownefs representative. Drawings,
=pecifications and energy coNrol devices are shown with ihe intent of ineeting current
ztate enesgy codes. S�bmiuing parry is to aletl designes and owner of any additional
devices or load chonges necessary to adhere to ihe code prior to submir,ion of
ComCheck.
O KEYED NOTES - PLUMBING PLAN
PI RvnwaterlinetoKevdgmachine_
P2 Refer�o�ypicalde�ail,shee�2/PI01_
P3 Refer�o�yplcalde�all,shee�3/PI01_SeepageP101_
P4 Refer�o�ypicalde�ailshee�2/P103.See page P103.
1�
ARSON
ESIGN
:SOCIATES
IEST
=legates Row,
0
� ipolis, IN 46240
84359]9 Foz31]84359]5
HWEST
kesearch Blvd
'-S�i�e 130
fX 78759
"J oszn Fax S z.9JJII9An
L^,
W
�F
�F
�
�
�
N
�
N
L
^
�
N
U
�
� O
M
� �
� O
O
i �
� �
� •�
�
STAMP:
0
V
N
�
V
Z
Vi
�
Q
�
�
0
�
�
�
�
N
�
�
rn
w
0
0
�
01.08.2020
ISSUE: i
PermitSet
1 LEVEL 3- CONSTRUCTION PLAN SIDE A
I/8"= I'-0"
li����:��������i,���i���i��������i
Su6jec��o compliance with allregula�ions
of Sla�e antl Local Codes
City of Carmel
`���cm� \o;,v�Atian. �
�
DATE: OZI14IZO
z
�
<
�
I 1
8� 4� P 8� ,6�
PLAN � � -
1/8.. _ �. Q..
DRAWING TITLE:
Third Floor Plumbing
Plan Side A
JOB NO. 11920014
DATE: 01.082020
SHEET NUMBER:
P102
c�rieiemw� uesorvcesiery