Loading...
HomeMy WebLinkAboutM103.0-M300-MECHANICAL SPECIFICATIONSDIVISION 15000- MECHANICAL SECTION 15001 - BASIC MECHANICAL REOUIREMENTS A. GENERAL CONDITIONS 1. THEDRAWINGSANDGENERALCONDITIONS,INCLUDINGSUPPLEMENTARVGENERALCONDITIONS,SHALLAPPLV TO ALL WORK IN DIVISION 15000. 2. THECONTRACTORFORTHISDIVISIONSHALLREVIEWTHEDRAWINGSANDACCOMPANVINGSPECIFICATIONS, EXAM INE THE SITE, CHECK AS TO THE MEANS OF MAKMG CONNECTIONS TO SERVICES, AND SHALL BECOME FAM ILIAR W ITH ALL THE EXISTING CONDITIONS AND LIMITATIONS BEFORE SUBMITTING A PROPOSAL. ANY APPARENT VARIANCES OF THE PLAN OR SPECIFICATION FROM THE EXISTMG CONDITIONS AT THE SITE SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER DURMG THE BID PERIOD SO THAT CLARIFICATION CAN BE MADE BV ADDENDUM. ITEMS KNOW N TO BE INCONSISTENT W ITH THE BID DOCUMENTS INTENT MUST BE LISTED AND pUALIFIED ON THE CONTRACTORS BID FORM. NO EXTRAS W ILL BE ALLOW ED BECAUSE OF THE CONTRACTORS MISUNDERSTANDMG AS TO THE AMOUNT OF W ORK INVOLVED OR HIS LACK OF KNOW LEDGE OF ANV SITE CONDITIONS WHICH MAV AFFECT HIS WORK. 3. COORDINATIONOFSCHEDULINGFORCOMPLETIONANDALLINSPECTIONSOFTHEIRWORKANDWORKOF SUBCONTRACTORS IS THE RESPONSIBILITV OF THIS CONTRACTOR. 4. BEFORESUBMITTINGAPROPOSALONTHEWORKCONTEMPLATEDONTHESEDRAWINGSANDACCOMPANVING SPEQFICATIONS, EACH BIDDER SHALL EXAMME THE SITE, CHECK AS TO THE MEANS OF MAKING CONNECTIONS TO SERVICES, AND SHALL BECOME FAMILIAR W ITH ALL THE E%ISTMG CONDITIONS AND LIMITATIONS. MECHAN ICAL EpUIPMENT AND SVSTEMS SHOW N AS EXISTING ON THE PLANS HAVE BEEN BASED ON EXISTING DRAW INGS. NO EXTRAS W ILL BE ALLOW ED BECAUSE OF THE CONTRACTOR'S MISUN DERSTANDING AS W THE AMOUNT OF WORK INVOLVED OR HIS LACK OF KNOW LEDGE OF ANV SITE CONDITIONS WHICH MAV AFFECT HIS W ORK. ANV APPARENT VARIANCE OF THE PLAN OR SPECIFlCATION FROM EXISTMG CONDITIONS AT THE SITE SHALL BE CALLEDTOTHE ATTENTION OFTHE ENGMEER DURING THE BID PERIOD SOCLARIFICATION CAN BE MADEBVADDENDUM. SECTION 15002 - GENERAL REpU IREMENTS 1. WORKTOBEACCOMPLISHEDONTHESEDRAWWGSANDSPECIFICATIONSINCLUDESFURNISHMGALLLABOR, MATERIAL, E�UIPMENT AND SERVICES FOR THE COMPLETION OF ALL MECHANICAL W ORK. ALL MECHAN ICAL WORK UNLE55 NOTED TO BE SPECIFlCALLV BV THE LANDLORD IS THE RESPONSIBILITV OF THIS CONTRACTOR. 2. THISCONTRACTORANDTHEIRSUBCONTRACTORSSHALLWORKCLOSELVWITHTHETENANTPROJECT MANAGER FOR COORDINATION OF TRADES AND COMPLETION OF THE PROJECT. 3. PLANSANDSPECIFICATIONSARECOMPLEMENTARVANDWHATISCALLEDFORMEITHERONESHALLBEAS BINDING AS IF CALLED FOR IN BOTH. ANV ITEM OR LABOR THAT IS NECESSARV TO COMPLETE THE WORKAND IS TVPICALLV INCLUDED IN SIMILAR W ORK SCOPE SHALL BE FURNISHED AND INSTALLED AS PART OF THE CONTRACT W HETHER OR NOT IT IS SHOW N ON THE PLANS OR IN THE SPEQFICATIONS. 4. WHENTHEINCLUDEDDRAWINGSAND/ORSPECIFICATIONSCALLOFITEMSWHICHEXCEEDTHELANDLORDS TENANT CRITERIA OR EXCEED CODE, IT'S THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL THE MORE STRINGENT REpU IREMENTS NOTED ON THE PLANS AND/OR SPECIFICATIONS. IF THE PLANS AND SPECIFICATIONS HAVE DISCREPANCIES BETW EEN THEM, THE CONTRACTOR SHALL ASSUME IN THEIR BID THAT THE MORE STRWGENT ITEM IS REpUIRED AT NO ADDITIONAL COST. 5. ALLPIPMG,DUCTWORKANDEQUIPMENTSHALLBEFURNISHEDANDINSTALLEDTOPRESENTANEATAND CLEAN APPEARANCE USING GOOD CONSTRUCTION PRACTICES. EpUIPMENT SHALL BE INSTALLED FOR PROPER ACCESS TO OPERATE, SERVICE AND MAINTAIN THE E�UIPMENT W ITHOUT HAVMG TO MOVE OTHER E�UIPMENT FOR ACCESS. ANV MECHANICAL EQU IPMENT (OR EXISTING EQUIPMENT TO REMAIN) THAT REQUIRES ACCESS PANELS SHALL HAVE THOSE PAN ELS FURNISHED AND INSTALLED BV THE MECHAN ICAL CONTRACTOR. 6. UNLESSSPECIFICALLYNOTEDONTHEPLANS/SPECIFICATIONSALLMATERIALSANDEpUIPMENTSHALLBENEW AND BEST QUALIiY TO CONFORM TO THE REQUIREMENTS OF THE LANDLORDS TENANT CRITERIA, LOCAL AND STATECODESGOVERNINGTHEWORK INVOLVEDANDBEMADEBYNATIONALLYRECWNIZED MANUFACTURES WITH UL LISTWGSAND LABELS. SECTION 15003 - CODES 1. ALLWORKSHALLBEINSTALLEDINCONFORMITVOFTHELANDLORDSTENANTCRITERIA,ANDAPPLICABLE LOCAL CODES AND ORDINANCES AND STATE STATUTES. ALL RE�UIREMENTS OF THE CURRENT PLUMBMG CODES, HEATING AND VENTILATION CODES, HEALTH AND SAFETY CODES, NFPA CODES AND ENERGY CODES MUST BE MET. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INpUIRE INTO AND COMPLV W ITH ALL LOCAL ORDINANCESAND INCLUDE ANV ADDITIONAL ITEMS NOT NOTED IN THE PLANS/SPECIFlCATIONS IN THEIR BID. ANV CHANGES TO THE MECHANICAL SVSTEM AS REQU IRED BV LOCAL, STATE OR TENANT CRITER W THAT ARE NOT pUALIFIED ON THE CONTRACTORS BID FORM ARE ASSU MED TO BE INCLUDED IN THE ORIGINAL BID AND ADDITIONAL COSTS W ILL NOT BE DUE TO COMPLETE THOSE ITEMS AFTER THE CONTRACT IS ISSUED. SECTION 15004- LICENSES, PERMITS, INSPECTIONS & FEES 1. THISCONTRACTORISRESPONSIBLEFORALLFEES,CHARGESANDOBLIGATIONSFOROBTAINMGPERMITSAND INSPECTIONS FOR PLUMBING, HEATING AND VENTILATION AND FIRE EXTINGUISHING W ORK. 2. ALLCERTIFICATESOFINSPECTIONANDFINALINSPECTIONSSHALLBETURNEDOVERTOTHETENANT'S PROJECT MANAGER AT THE COMPLETION OF THE PROJECT. SECTION 15005 - TRADE NAMES, MANU FACTURERS AND SHOP DRAW INGS 1. IN ANY CASE W HERE A SPECIFIC NAME OF EpUIPMENT OR MATERIAL IS MENTIONED ON THE DRAW WGS OR SPECIFICATIONSTHEEXACTEpUIPMENTSHALLBEUSEDFORTHEBASEBID. EpUIPMENTOFEOUALGRHDE AND pUALITV W ILL BE SUBJECT TO PRIOR APPROVAL BV THE TENANT'S PROJECT MANAGER AND THE ENGINEER IN WRITMG THRU THE SHOP DRAW WG SUBMITTAL PROCESS. ANY EpUIPMENT INSTALLED WITHOUT W RITTEN APPROVAL W ILL BE CHANGED OUT TO THE SPECIFlED EQU IPMENT AT THE CONTRACTORS EXPENSE. 2 MECHANICAL CONTRACTOR SHALL SUBMIT 3 COPIES OF SHOP DRAW MGS TO THE TENANT'S PROJECT MANAGER FOR APPROVAL. IF APPROVED, COPIES W ILL BE STAMPED "NO EXCEPTIONS" OR "APPROVED AS NOTED" AND W ILL BE RETURNED TO THE CONTRHCTOR. IF NOTATIONS AND MARKS INDICATE THAT REVISED INFORMATION IS REpUIRED, THEN CORRECTED INFORMATION SHALL BE SUBMITTED. SECTION 15006 - GUARANTEE 1. THIS CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR AND DEFECTS W HICH MAV DEVELOP IN ANV PART OF THE SVSTEMS CAUSED BV FAULTI' W ORKMANSHIP, MATERIAL OR EQUIPMENT, AND AGREES TO REPLACE ANV SUCH FAULTV W ORKMANSH IP, MATERIAL OR EpUIPMENT DURING A PERIOD OF 12 MONTHS FROM THE DATE OF FINAL ACCEPTANCE W ITHOUT ANV COST TO THE OW NER. ANV EXTENDED W ARRANTIES (LONGER THAN 12 MONTHS) FOR W UIPMENT W ILL BE NOTED ON THE SCHEDULES, PLANS OR SPECIFlCATIONS. 2. EACH PIECE OF EpUIPMENT FURNISHED BV THE CONTRACTOR SHALL HAVE A 12 MONTH WARRANTY FOR MATERIAL AND LABOR AT STARTS UPON THE DATE OF FlNAL ACCEPTANCE AS DESIGNATED BV THE TENANT'S PROJECT MANAGER. ALL COSTS FOR THE WARRANTV (MATERIAL AND LABOR) SHALL BE INCLUDED IN THE ORIGINAL BID. SECTION 15001- RECORD DRAW INGS 1. THIS CONTRACTOR SHALL MAINTAIN AT THE JOB SITE A SET OF DRAW INGS TO BE USED SPECIFICALLV FOR RECORDMG CHANGES FROM THE CONTRACT DOCUMENTS. THE MFORMATION SUCH AS VALVES, DUCT AND PIPE DEVIATIONS SHOULD BE DIMENSIONED FROM EASILV RECOGNRABLE REFERENCE POINTS INDICATING BOTH HORIZONTAL AND VERTICAL DISTANCES. 2. THECONTRACTORSHALLSUBMITAFlNALSIGNEDSETOFAS-BUILTDRAWMGSTOTHETENANTSPROJECT MANAGER AT THE COMPLETION OF THE PROJECT. 3. THECONTRACTORSHALLSUBMITTOTHETENANTSPROJECTMANAGERATTHEENDOFTHEPROJECT(2) COMPLETE HARD BOUND SET OF CATALOG DATA, MANUFACTURERS LITERATURE, DETAIL MANUALS COVERMG THE OPERATION AND MAINTENANCE OF ALL EOUIPMENT SPEQFlED. SECTION 15008 - DISCREPANCIES IN DOCUMENTS 1. THEDRAWINGSOFPIPINGANDDUCTWORKSVSTEMSSHALLBEINSTALLEDSUBSTANTIALLVASSHOWNONTHE PLANS. THE EXACT POSITION OF EACH AND EVERV PIPE, DUCT, OFFSET AND TRANSITION CANNOT BE GIVEN BV SCALMG THE DRAW MGS BUT SHALL IN EVERY CASE BE PLACED SO AS TO AVOID INTERFERENCE W ITH OTHER WORK. ALL NECESSARV CHANGES IN THE LOCATION OF PIPE OR DUCTW ORK FOR ITS PROPER INSTALLATION AND TO AVOID CONFLICT W ITH OTHER TRADES SHALL BE DONE BY THE CONTRACTOR AT NO ADDITIONAL CHARGE. SECTION 15009 DEMOLITION 1. THISCONTRACTORSHALLBERESPONSBLEFORTHECOORDINATIONOFTHEDEMOLITIONOFEXISTMGWORK ANDTHE DEMOLITION PROVIDED BV THE GENERAL CONTRACTOR. COORDINATE WITH THE GENERAL CONTRACTOR ANV EXISTING EQUIPMENT REQU IRED TO BE LEFT INTACT. 2 EACH CONTRACTOR SHALL VERIFY SCOPE OF W ORK W ITH THE GENERAL CONTRACTOR FOR THE REMOVAL OF ALL EXISTMG FIRE PROTECTION, PLUMBMG FIXTURES, PIPMG, HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT BEING REUSED ON THIS PROJECT, UNLESS SPECIFICALLV NOTED OTHERW ISE. 3. CONTRACTOR MUST VERIFV WITH THE LANDLORDALL PRESUMEDABANDONED EpUIPMENT, PIPES, DUCTWORK,ANDEQUIPMENTPRIORTOREMOVAL. RWFCURBSSHALLBEREMOVEDANDTHERWF PATCHED. ALL EXTRANEOUS ITEMS W THE SPACE OR ON THE ROOF NOT APPLICABLE TO THE NEW W ORK MUST BE REMOVED AND ROOF/JJALL/FLOOR PATCHEDIREPAIRED TO MATCH E%ISTMG STRUCTURE. 4 EXISTINGABANDONEDPIPES,DUCTS,OREOUIPMENTINTHEFLOOR,EMBEDDEDINCONCRETE,OROTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELO W OR W ITHIN FLOOR OR W ALL LEVEL W HEN THEV ARE NOT TO BE REUSED IN THIS PROJECT. 5. IF RE�UIRED BV LANDLORD OR CODES, ABANDONED PIPMG AND/OR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION W ITH THE GENERAL CONTRACTOR AND TENANT PRIOR TO BID AND INCLU DE IN BID PROPOSAL AS DIRECTED BV THE GENERAL CONTRACTOR AND TENANT. SECTION 15010 - CUTTING AND PATCHING 1. THISCONTRACTOR SHALL PROVIDE ALL CUTTWG AND PATCHMG REpUIRED FOR THE INSTALLATION OF HIS WUIPMENT IN THE BUILDMG WALLS, PARTITIONS, FLOORS, CEILMGS, ETC., UNLESS OTHERWISE NOTED. ALL CUTTING AND PATCH ING SHALL BE SUBJECT TO THE DIRECTION OF THE LANDLORD, ARCHITECT OR ENGMEER. 2. THISCONTRACTORSHALLNOTENDANGERTHESTABILITYOFTHESTRUCTUREBVCUTTING,DIGGINGOR OTHERW ISE ALTERMG THE STRUCTURE AND SHALL NOT AT ANV TIME CUT OR ALTER W ORK OF ANV OTHER CONTRACTOR. 3. PATCHINGOFWALLS,FLOORSANDROOFSHALLBEOFSAMEMATERIALANDWORKMANSHIPOFTHE SURROU NDMG MATERIAL W ITH FINISHED SURFACE APPEARMG THE SAME AS THE SURROUNDMG AREAS. ALL PATCHING SHALL BE PERFORMED BV WORKMEN SKILLED IN THAT PARTICULARTRADE. 4. DAMAGE CAUSED BV THE CONTRACTOR SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR IN A SUITABLE MANNER ACCEPTABLE TO THE LANDLORD AND TENANT'S PROJECT MANAGERS. SECTION 15011-SLEEVES 1. THISCONTRACTORSHALLINSTALLSLEEVESINCONNECTIONWITHALLPIPESPASSMGTHROUGHALLWALLS, PARTITIONS AND FLOORS. SLEEVES SHALL EXTEND THROUGH FULL TH ICKNESS OF WALLS AND FLOORS AND SHALL BE CUT FLUSH W ITH THE FINISHED SURFACES. SLEEVES IN SLABS SHALL BE CUT Y' ABOVE THE FLOOR SURFACE. 2. ALLSLEEVESSHALLBE22GAUGEGALVANIZEDSTEELMINIMUMFlNISHEDWITHASMOOTHEDGEAND PROPERLVSUPPORTED. 3. COREDPoLLWGFLOORSANDWALLSMUSTBECOORDINATEDWITHTHELANDLORDANDTHETENANT'S PROJECTMANAGER. 4. THISCONTRACTORSHALLFURNISHANDINSTALLFIRESTOPPINGATALLPENETRATIONSTHRURATEDFLOORS TO MAINTAIN THE FIRE RATING.3M FIRE BARRIER SVSTEMS, FLAME SAFE FIRE RETARDANT SVSTEMS, DOW CORNMG, SPECSEAL OR E�UAL. THE CONTRACTOR MUST PRESENT UL LISTMG DATASHEETSTOTHE TENANT'S PROJECT MANAGER AND LANDLORD TO SHOW THAT THE PENETRATIONS MAINTAIN THE FIRE RATING. SECTION 15012-HANGERS 1. FURNISHANDINSTALLBRACKETS,BRACESORREINFORQNGANGLESASREpUIREDFORALLPARTITIONSNOT SUFFICIENT IN THEMSELVES TO SUPPORT PLUMBMG FI%TURES OR OTHER EpUIPMENT. 2. PIPMG SHALL BE SUSPENDED FROM CONSTRUCTION ABOVE WITH ANGLE IRON, CLAMPS, UNISTRUT, OR HANGER RODS. NO PIPING SHALL BE HUNG FROM OTHER PIPING EXISTING OR NEW. CONTRACTOR SHALL COORDINATE W ITH LANDLORD CRITERIA AND ALL CODES. 3. ALL PIPES W HICH ARE SPECIFlED TO BE INSULATED SHALL HAVE PREFABRICATED INSULATED METAL SADDLES SREDFORTHEINSULATIONTHICKNESSANDCONTINUOUSINSULATIONTHROUGHTHEHANGER. ALL DISSIMILAR METALS MUST BE SEPARATED W ITH DIELECTRIC MATERIAL. DIVISION 15300-FIREPROTECTIONQFAPPLICABLE) SECTION 15301 -SUMMARV OF WORK 1. THE CONTRACTOR IS REpUIREDTO FURNISH AND INSTALL ALL NECESSARV MATERIAL, EpUIPMENTAND LABOR FOR A W ET SPRINKLER SVSTEM TO MEET THE LANDLORDS TENANT CRITERIA AND LOCAL CODES. THE CONTRACTOR SHALL BE REpUIRED TO HAVE DESIGN DRAW WGS COMPLETED BY A CERTIFIED FIRE SPRINKLER DESIGNER AND COPIES OF THE HVDRAULIC CALCULATIONS AND PLANS ALONG W ITH SHOP DRAW MGS OF THE HEADS, SHALL BE SUBMITTED TO THE STATE FIRE MARSHALS OFFICE OR LOCAL AUTHORITV HAVING JURISDICTION FOR PLAN REVIEW AND APPROVAL ON OR BEFORE THE TIME THE PLANS AND CALCULATIONS ARE SUBMITTED TO THE STATE FOR APPROVAL, THEV SHOULD BE SUBMITTED TO THE TENANT'S PROJECT MANAGER AND ENGMEER FOR REVIEW. 2 THEEXISTMGWETSPRINKLERSVSTEMSHALLBEREVISEDMEETNFPA-13,LOCALAUTHORITYANDLANDLORDS TENANT CRITERIA. 3. CONTRACTOR IS RESPONSIBLE FORALL FEES RELATED PERMITSANDTESTSAND INSPECTIONS. SECTION 15302 - MATERIALS A. SPRMKLER HEADS'. 3.1. ALLSPRINKLERHFADSSHALLBENEWLLL,F.M.LISTEDANDAPPROVEDAUTOMATICSPRAVTVPEAS MANUFACTURED BY GRINNELL, RELIABLE, STAR, OR VIKWG. 32. ALLSPRINKLERHEADSSHALLBEOWCKRESPONSERATEDFORORDINARVTEMPERATUREUNLESS INDICATED OTHERW ISE ON DRAW MGS OR REpU IRED BV LOCAL CODES. 3.3. VEPoFVHEADTYPESANDCOLORSWITHTENANTANDSUBMITWITHSPRINKLERDRAWMGSFOR PERMIT. 34 LOCATIONSOFALLHEADSSHOULDBEAPPROVEDBVTENANTANDTHELOCALFIREPROTECTION OFFICIAL BEFORE INSTALLATION. B. ACTLAV-INCEILING-SEMI-RECESSEDWITHWHITEESCUTCHEONSANDWHITEHEADS. C. GVP BOARD HARD LID CEILMG- FULLV RECESSED CONCEALED HEADS PAINT COVER PLATES TOMATCH ADJACENT GYP BOARD. D. OPEN CEILING-ROUGH BRONZE UPRIGHT HEAD. E. PIPING: 1.1. SCHEDULE40,BLACKSTEELPIPE,ASTMA-53FORFERROUSPIPMG,WELDEDANDSEAMLESS,ANSI B364 0-10 FOR W ROUGHT STEEL PIPE. 12 CASTIRONORMALLEABLEIRONSCREWEDFITTINGSFORPIPES2INCHESANDSMALLER.SCREWED OR CAST IRON FLANGED JOINTS FOR PIPES LARGER THAN 21NCHES. 1.3. GALVANREDORBLACKMALLEABLEIRONWITHBRHSSSEATSCREWEDUNIONSFORPIPES2INCHES AND SMALLER. 14. VICTAULICTVPECOUPLMGSAREACCEPTABLE,WHEREAPPROVEDBVCODEANDTHELANDLORD. L5. HANGERSSHALLCOMPLVWITHLANDLORDANDCODEREQUIREMENTS. F. SPRMKLER SPACING SHALL NOT EXCEED 130 Sp. FT.IN "SALES/DINING"AREASAND 100 Sp. FT.IN "BACKOF HOUSE" AREAS. COMPLV W ITH LANDLORD'S DESIGN CRITERIA. PIPE SIZMG SHALL BE BASED ON NFPA ORDINARV HAZARD. G. ALLSPRINKLERLMESSHALLBEINSTALLEDCONCEALED,AVOIDINGINTERFERENCEWITHOTHERTRADES. H. WHEREPOSSIBLE,REWORKTHEEXISTMGSPRINKLERSVSTEMTOMEETTHENEWREpUIREMENTSOFTHIS DESIGN AND INCLUDE ALL COSTS TO RAISE OR RELOCATE EXISTMG PIPMG TO OBTAIN CEILMG HEIGHTS SHOW N ON DRAW INGS. IN NEW CONSTRUCTION THE LAN DLORD MAY PROVIDE ONLY A STUB-M TO THE SPACE. THE CONTRACTOR SHALL CONN ECT AND EXTEND NEW PIPMG AS REpU IRED. VERIFY ALL REpU IREMENTS PRIOR TO BID. I. PROVIDE AND INSTALL A VALVED TEST CONNECTION IN AN ACCESSIBLE LOCATION FOR THE SPRINKLER SVSTEM AS REpUIRED OR REpUESTED BV THE MALL, LOCAL INSPECTOR, OR TENANT'S INSURANCE CARRIER. J. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE CAUSED BV LEAKS IN ANY OF THE E�UIPMENT INSTALLED BV THEM. ALL REPAIRS OR REPLACEMENT OF DAMAGES SHALL BE AT THIS CONTRHCTOR'S EXPENSE. K. PROPERLVCOMPLETEDANDSIGNED"SPRINKLERCONTRACTOR'SMATERIALANDTESTCERTIFlCATES"SHALL BE FU RN ISHED TO THE LANDLORD, AND AUTHORITIES HAVING JURISDICTION. DIVISION 15500- HEATING, VENTILATING, AIR CONDITIONING SECTION 15501 - SUMMARY OF WORK A. THISCONTRACTORSHALLFURNISH,INSTALL,TESTANDBALANCEALLNECESSARVEQUIPMENTFORA COMPLETE WORKING SYSTEM. SEE PLAN FOR DUCTWORK AND SCHEDULES. B. CONTROLS 1. COMMERCIALTHERMOSTATWITHCONTROLFORUPT02-STAGESOFHEATINGAND2-STAGESOF COOLING WITH FULL ECONOMIZER AND DEHUMIDIFICATION CONTROL SEpUENCES. PROVIDE REMOTE SENSORS AS INDICATED ON PLANS. VERIFY COMPATIBILITV W ITH LANDLORDS REpUIREMENTS PRIOR TO INSTALLATION. 2. VERIFYCOMPLETE OPERATION OFALL MODES'. HEAT, COOL, ECONOMIZER, OCCUPIED, UNOCCUPIED, DEHUM IDIFICATION, ETG CONTRACTOR SHALL PROVIDE FULLV FUNCTIONAL SVSTEM AS APPROVED BVTENANT. ASSISTINANVNECESSARVTRAININGANDIORPROGRAMMINGPERTENANTS REpUIREMENTS. 3. COORDINATECONTROLREpUIREMENTSANDSETTMGSWITHLANDLORDREpUIREMENTSPRIORTO BID. IF RWUIRED PROVIDE ALL WUIPMENT TO TIE INTO LANDLORD SVSTEMS. SECTION 15502 - MATERIALS A. SEEPLANSFORSCHEDULESANDDETAILSOFE�UIPMENT.ALLE�UIPMENTSHALLBEINSTALLED ACCORDING TO THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. COORDINATE ALL REOUIREMENTS W ITH LANDLORD. 1. THIS CONTRACTOR SHALL PROVIDE ALL NECESSARV PARTS AND LABOR INCLUDMG BUT NOT LIMITED TO FANS, BELTS, PULLEVS, BEARINGS, DAMPERS, COILS AND MOTORS AS REOU IRED TO OBTAIN A FULLV OPERATIONAL UNIT THAT MEETS OR EXCEEDS THE DESIGN pUANTITIES SET FORTH IN THESE DOCUMENTS INCLUDMG BUT NOT LIMITED TO CAPACITV, CFM AND EMERNAL STATIC PRESSURE. B. DUCTWORK-FBERGLASSDUCTBOARDISNOTAPPROVED 1. ALLSUPPLV,RETURN,EXHAUSTANDRELIEFDUCTWORKSHALLBEGALVAWZEDSTEELSHALLBE MANUFACTURED (GAUGES, REINFORCEMENT AND CONNECTIONS), AND INSTALLED IN ACCORDANCE W ITH THE LATEST EDITION OF SMACNA"HVAC DUCT CONSTRUCTION STANDARDS". 2. ALLELBOWSSHALLHAVEAMINIMUMTHROATRADIUSOFONEHALFTHEDUCTWIDTHORSHALLBE PROVIDED W ITH TURNMG VANES. 3. HANGDUCTWORKFROMSTRUCTUREACCORDINGTOSMACNASTANDARDS.CONTRACTORSHALLBE REpUIRED TO INSTALL SEISMIC BRAC WG AS REpUIRED BV LANDLORD CRITERIA ANDIOR LOCAL CODES. 4. ALLDUCTJOINTSANDLONGITUDINALSEAMSSHALLBESEALEDWITHAWATERBASEDDUCTSEALER, DURODVNE"DUROSEAL"ORAPPROVEDEQUAL. 5. ALLSUPPLY,RETURN,ANDMAKE-UPAIRDUCTWORKMCONCEALEDSPACESSHALLBEWRAPPED W ITH MIN. R-6 INSULATION W RAP W ITH FOIL VAPOR BARRIER. GENERAL EXHAUST DUCTW ORK SHALL BE W RAPPED W ITH MIN. R-6 1NSULATION W RAP W ITH FOIL VAPOR BARPoER 10'-0" FROM PENETRATION OF EXTERIOR WALL OR ROOF. OUTDOOR AIR INTAKE DUCTWORK SHALL BE W RAPPED W ITH MIN. R-8 INSULATION W RAP W ITH FOIL VAPOR BARRIER ALONG ENTIRE LENGTH. SUPPLV AND MAKE-UP AIR DUCTW ORK IN OPEN CEILING AREAS SHALL BE LMED W ITH 1" DUCT LMER. ALL JOINTS SHALL BE TAPED AN D/OR SEALED ACCORDING TO THE MANUFACTU RES INSTALLATION REpUIREMENTS IN ORDER TO MAINTAIN VAPOR BARRIER AND R-VALUE RATMG. 6. PROVIDEREXIBLEDUCTCONNECTIONSCONSTRUCTEDOFNWPRENECOATEDFLAMEPROOFFABRIC AT EpUIPMENT INLET AND OUTLET TO ISOLATE VIBRATION. ]. THE FINAL 4' OF DUCTWORK TO THE AIR DEVISE MAV BE FLEXIBLE CLASS 1 DUCT W ITH R-61NSULATION AND FOIL VAPOR BARRIER. DUCTWORK MUST MEET LOCAL RE�UIREMENTS AND LANDLORDS CRITERIA. 8. ALL SUPPLV TAKE-OFFS SHALL HAVE AIR SCOOP AND MANUAL VOLUME DAMPER W ITH pUADRANT LOCKMGHANDLEFORBALANCMG. WHEREDUCTWORKISLOCATEDABOVEAGVPSUMBOARD CEILING, A CABLE CONTROLLED DAMPER OPERATOR SHALL BE FURNISHED, VOUNG REGULATOR COMPANVOREpUAL. C. TESTMG,ADJUSTMG,ANDBALANCMG 1. THEADJUSTINGANDBALANCINGOFTHEAIRFLOWTHROUGHOUTTHEFACILITVSHALLBEPERFORMED BV AN NEBB OR AABC CERTIFIED AIR BALANCER AS HIRED BV THE MECHANICAL CONTRACTOR. THE BALANCMG SHALL TAKE PLACE AFTER THE FlNAL PUNCH LIST. THE BALANCMG CONTRACTOR SHALL VERIFV THAT ITEMS ON THE PUNCH LIST EFFECTING THE AIR BALANCE REPORT ARE COMPLETED PRIOR TO STARTING THE AIR BALANCE. THE MECHANICAL CONTRACTOR SHALL PROVIDE ASSISTANCE TO THE TESTMG AND BALANCWG CONTRACTOR BV MAKWG ADJUSTMENTS TOTHE SVSTEM AND SVSTEM COMPONENTS REpUIRED FOR ACH IEVING DESIGN PERFORMANCE THE BALANCING REPORT SHALL INCLUDE AT MINIMUM THE FOLLOW ING: 2 CERTIFICATION NUMBER OF THEAIR BALANCER. 3. CALIBRATION DATESAND MFORMATION ON THE WUIPMENT USED FOR BALANCMG. 4. ITEM BEING TESTED W ITH MAKE MODEL AND SERIAL NUMBERS. 5. AIRCFMATMLETANDOUTLETOFSUPPLYUNIT PRELIMINARYREADMG FIRSTADJUSTMENT SECOND � ADJUSTMENT). 6. AIRCFMATDISTRIBUTIONPOINT(PRELIMINARVREADING,FIRSTADJUSTMENT,SECONDADJUSTMENT). EACH GPoLLE, REGISTER, DIFFUSER SHALL BE LABELED ON A MASTER PLAN THAT SHOULD BE INCLUDED IN THE FlNAL REPORT. ]. MOTORAMP READINGSAFTER EACH ADJUSTMENT. 8. MOTORANDFANRPMREADINGSAFTEREACHADJUSTMENT. 9. STATICPRESSUREATUNITINCLUDMG,INLET,OUTLETANDTOTAL. 10. OUTSIDE AIR CFM. 11. SUBMIT(4)COPIESOFTHEAIRBALANCEREPORTTOTHETENANT'SPROJECTMANAGER. PRIOR TO BID, THE CONTRACTOR SHALL REVIEW THE MECHANICAL, ELECTRICAL AND KITCHEN EpUIPMENT DRAW MGS. THE CONTRACTOR SHALL INCLU DE IN HIS BID ALL RELEVANT W ORK M THE ENTIRE SET OF DOCUMENTS AND REPORT ALL DISCREPANCIES BETW EEN THESE DRAW INGS TO THE ENGMEER PRIOR TO BIDDING FOR CLARIFICATION. IF DISCREPANQES REMAIN UNRESOLVED DUE TO A SHORT TIME FRAME, THE CONTRACTOR SHALL INCLUDE THE MOST W ORK AND THE HIGHER COSTS IN THE BID. SOLUTIONS TO UNREPORTED DISCREPANCIES W ILL BE DETERMINED BV THE ARCHITECTIENGINEER, W ITH NO ADDITIONAL COMPENSATION DUE TO THE CONTRACTOR. finn �laniels A R C H I T E C T S 2145 Ford Parkway, SuAe 301 Saint Paul, Minnesota 55116 651.690.5525 www.fin n-dan iels.com CONSULTANT: � DUNHAM �I DUNHAM m so�m s�.m s.��v s��n� noo M���o�pona,m����yoi�ssaoa-isao r..'.�61p,<65]550 nx61RA6'31561 ..�e tlunpamengr.om ecnamcai a eiecmcai consmnng eneineenng SEAL/SIGNATURE: W.NIOWOB �. ' STRTE Oi 12/ll/2019 PROJECT: _. � i, ��u BIBIBOP asian grill THE BRIDGES 365 WEST 116TH STREET SUITE 140 CARMEL, INDIANA 46032 BIBIBOPSTORENO.: TBD BIBIBOP PO NO: THE BRIDGES PROIEQ NO.: 0 42 0 995-119 DRAWNBV: T%e CHECKE� eV: GMS ISSUES AND REVISIONS: LL/QIENTREVIEWSET 11262019 PERMITISSUE 12.112019 SHEET TITLE: MECHANICAL SPECIFICATIONS RELEASEU FOR CONSTRl1CTI0N Su6jec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel y�,:�v��� �'�a;,v��tiw� � � DATE: OZ�1 H�ZO M300