HomeMy WebLinkAboutP102.0-P110-PLUMBING PLANGENERAL NOTES:
A. THE WORK SHALL BE EXECUTED IN STRICT CONFORMIiY WITH BASE BUILDING SPECIFICATION AND WITH THE LATEST
EDITION OF THE PREVAILING STATE PLUMBING AND BUILDING CODES AND ALL LOCAL REGULATIONS THAT MAV APPLV. IN
CASE OF CONFLICT BETWEEN THE CONTRACT DOCUMENTS AND A GOVERNMG CODE OR ORDINANCE, THE MORE
STRINGENT STANDARD SHALL APPLY.
B. CONTRACTOR IS RESPONSIBLE FOR HAVMG ATHOROUGH KNOWLEDGE OFALL DRAWMGS, SPECIFICATIONSAND EXISTMG
CONDITIONS FOR eIDDING PURPOSES. FAILURE TO ACQUAINT THEMSELVES W ITH THIS KNOW LEDGE DOES NOT RELIEVE
THE RESPONSIBILITY OF PERFORMING THEIR WORK.
C. NOTALL EXISTMG EQUIPMENT, PIPMG, DUCNJORK, ETC. IS SHOWN ON THE PLANS. ALL EXISTMG EQUIPMENTAND PIPMG
SHOW N DOES NOT REFLECT ALL OFFSET$ LENGTHS AND LOCATIONS. CONTRACTOR SHALL FIELD VERIFV ALL EQUIPM ENT
AND PIPING TO BE REMOVED ANDIOR CONNECTED TO PRIOR TO BID.
D. FIELDVERIFYLOCATIONSANDQUANTITVOFALLEXISTINGEQUIPMENT,FIXTURES,DUCTWORKANDPIPINGNECESSARYTO
COMPLETE SCOPE OF WORK.
E CONCRETE CUTS SHALL BE STRAIGHT AND CLEAN. REPLACE SLAB W ITH CONCRETE FWSH AND SMOOTH W ITH ADJACENT.
F. WASTEBVENTPIPINGeELOWGRADEANDTHRUFLOORSHALLeE2"MINIMUM.
G. FIELDVERIFVSIZE,LOCATION&INVERTELEVATIONOFEXISTINGSANITARVSEWER.
H. PITCHALL UNDERFLOOR SANITARV WASTE PIPING 4" AND GREATER AT 1/8" PER FOOT. ALLOTHER BELOW GRADE PIPING
SLOPED AT 1/4" PER FOOT.
I. CLEANOUTSMUSTBEINSTALLEDWHERESHOWNONPLANSANDADDITIONALCLEANOUTSWHEREREQUIREDBYCODE.
J. WASTEANDVENTPIPMGINPLENUMCEILMGSPACESTOBECASTIRONNOHUB,SEESPECIFICATIONS.
K. COORDINATE ROUTING OF WATER, VENT, WASTE AND STORM PIPING W ITH STRUCTURE, CEILING ELEVATION, ELECTRICAL
SW ITCHGEAR, DUCTW ORK, LIGHTS, SPRINKLER PIPMG AND ALL OTHER TRADES.
L COORDINATE KITCHEN ROUGH-IN REQUIREMENTS WITH KITCHEN EQUIPMENT DRAWINGS AND SCHEDULES.
M. ALL HUB DRAINS AND INDIRECT DRAINS SHALL BE MOUNTED M EXPOSED READILV ACCESSIBLE LOCATIONS. COORDINATE
FINALDRAM LOCATIONS WITH KITCHEN EQUIPMENT.
N. MATERIAL EXPOSED W ITHIN RETURN AIR PLENUM CEILMGS SHALL COMPLV W ITH IMC SECTION 6022.
O. PLUMBING SUBCONTRACTOR SHALL BE RESPONSIBLE FOR TESTED & RATED FIRE STOP SVSTEMS FOR ALL THRU-
PENETRATION OF WALLS, FLOORS 8 ROOF ASSEMBLIES RESULTING FROM PIPING 8 OTHER WORK UNDER HIS CONTRACT.
REFER TO FIRE-STOPPING SPECSECTION FOR REQUIREMENTS.
P. PLUMBING CONTRACTOR SHALL ENSURE THATALL EQUIPMENTAND PIPING NOTBEING USED IS FULLV REMOVED AND NOT
ABANDONED. COORDINATE REQUIREMENTS WITH THE GENERALCONTRACTOR AND LANDLORD. REFER TOSPECIFICATIONS
FOR ADDITIONAL INFORMATION. VERIFV SCOPE OF W ORK W ITH THE GENERAL CONTRACTOR PRIOR TO BID AND INCLUDE
ALL COSTS IN eID AS DIRECTED eV THE GENERAL CONTRACTOR.
Q. ALLINSTALLATIONS,EQUIPMENTANDMATERIALSHALLCOMPLVWITHALLAPPLICABLELANDLORDREQUIREMENTS.
R. PRIORTOBID,THECONTRACTORSHALLREVIEWTHEMECHANICAL,ELECTRICALANDKITCHENEQUIPMENT
DRAW INGS. THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL RELEVANT W ORK IN THE ENTIRE SET OF DOCUMENTS AND
REPORT ALL DISCREPANGES eETW EEN THESE DRAW MGS TO THE ENGMEER PRIOR TO eIDDMG FOR CLARIFlCATION. IF
DISCREPANCIES REMAIN UNRESOLVED DUE TO A SHORT TIME FRAME, THE CONTRACTOR SHALL INCLUDE THE MOST WORK
AND THE HIGHER COSTS IN THE BID. SOLUTIONSTO UNREPORTED DISCREPANCIES WILL BE DETERMINED BV THE
ARCHITECT/ENGMEER, W ITH NOADDITIONAL COMPENSATION DUE TO THE CONTRACTOR.
S. INSULATE ALL HOT, COLD, RECIRCULATION, AND INTERIOR CONDENSATE PIPING. SEE PLUM BING SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
T. CONTRACTOR IS RESPONSBLE FOR SCOPING AND RECORDING THE SANITARV MAIN FROM LEASE LINE TO LEASE LINE
PRIOR TO AND AFTER ALL SANITARV TIE-INS ARE COMPLETED. CONTRACTOR SHALL PROVIDE LANDLORD W ITH COPIES OF
BOTH RECORDMGS ONCE TIEINS ARE COMPLETED.
U. PROVIDESTAMLESSSTEELESCUTCHEONFORALLPIPEPENETRATIONSATWALLSANDCEILINGS.
GRID
/ —
/
finn �laniels
A R C H I T E C T S
2145 Ford Parkway, SuAe 301
Saint Paul, Minnesota 55116
651.690.5525
www.fin n-dan iels.com
CONSULTANT:
DUNHAM �I
DUNHAM
m So�m s�.m s.��v s��n� noo
M���o�pona,m����yoi�ssaoa-isao
.� 6 4. 6S 550 r. 6 R. 6. 61
..e tl 0 , y. om
ecn i i cmcaic it g neineenng
SEAL/SIGNATURE:
"F::owsrER ...�s��
:`eY' ob�'.. �_
_ ' W.NIOWOB ': '
— STRTEOi �
''�,�� � `
iz/v/zois
PROJECT:
...r.�
�`
. . . • •
PRESSURE REDUCER AND
CHECK VALVE PROVIDED
W ITH STEAMER
ELECTRIC STEF
I E4Z'
I SPLITTER :
❑ �
� ;�-�� � I
asian grill
THE BRIDGES
io r�
Ei
T
TRV-�
:I� EX FD .t r� EX FD � . � E105 3//� . 1
� � 9 1_
�"�r ,I��� ..
� �
IIIIIIIIIIIIIII
� IIIIIII�
25
TD�
4�
�"8 9 I�� V. .�` I I O 21 21 � E43�
d
FS-1
9
2 E6 � _E10 �-23 �i6
E9 �
� WCO 14 � �.1]�19 �'-WCO . .
II
>
�'
I�
—W C0� FS-2 .
� E61 9
WCO ❑ 2 E58
i�
cw x—
E33 � �
Fw
FS-1
E22 9
TI�
�
� ��
__WCO
9
FS-2� y
E]2 IIE�5
E�s
II
�.-:. I� _.. .12
� �
wC0
13
E101
N 02 ��g
18
II
�
li
— — �11 —
—v— —
.�53 .p� E51 �
,�����, PLUMBING PLAN
....� il4„ _ �� p„
GAS LOAD CALCULATIONS
FlXTURE LOAD NOTES
(CFH)
(E)RTU-1 150 1
(E)RTU-2 150 �
3l4" FW-X
P W MBING CONTRACTOR TO
PROVIDE SHUT-0FF VALVE
ANDTHREADEDCONNECTION
COMPATIBLE WITH PIPWG
PROVIDED BV STEAMER
MANUFACTURER .
ii % . �\ ii
i � I i
\ I I
. � �i
i ,_ �26
�i i �i �i
i 1 r i
i � i
`_- _---,�
6RID
� c � 'J C � . /�eJ�
��ll� —V—
Fw
F3 � F31 _
w^✓-x
�
3 �
28�1'F� 4
SII
II 6�
� -- II
J � I I
L — 24 �
�� ��
15 E]
BLUE PIPE PROVIDED
W ITH STEAMER
PORTION OF PIPING BETWEEN DASHED
LINES TO BE REMOVED IF RO UNIT IS
INSTALLED
O ROUNIT
. . f-E43 ; . . .
-� BLACKPIPE
� PIPMGFURNISHEDWITH PROVIDED -- -- --
PIPINGBV STEAMERORBVKITCHEN WITHSTEAMER ', ' PIPINGANDAUXILIARVROUNITQTEME43)BVSTEAMER
MANUFACTURER OR KITCHEN EpUIPMENNENDOR AS
PWMBING EpUIPMENTVENDOR, REQUIREDPENDMGWATERQUALITVTESTRESULTS.
CONTRACTOR INSTALLED BV PLUMBING SEE KEVNOTE REGARDMG DEDUCT ALTERNATE #1 ON
CONTRACTOR P110 FOR ADDITIONAL INFORMATION.
NOTE:
THIS DETAIL IS SCHEMATIC IN NATUREAND FOR REFERENCE ONLV. MANUFACTURER MSTALLATION REpUIREMENTS ARE
SUBJECT TO CHANGE, THEREFORE PRIOR TO INSTALLATION, CONTRACTOR SHALL REVIEW CURRENT MANUFACTURER
INSTALLATION INSTRUCTIONS AND ADJUST AS REpU IRED FOR COMPLIANCE W ITH INSTRUCTIONS AND ALL APPLICABLE
CODE REQUIREMENTS. COORDINATE W ITH BIBIBOP REPRESENTATIVE ANV DISCREPANCIES OR CHANGES.
.. Z�� STEAMER SCHEMATIC PIPING DETAIL
'-' NO SCALE
RELEASED FOR CONSTRl1CTI0N
Su6jec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
`�sv�� �\o�v�AWn.�.��
�
DATE: OZ�1 H�ZO
TOTAL I 952 I
NOTES:
1. PIPMGDOWNTOSPACESIZEDPERTABLE402A5 OFTHE2012
�)
INTERNATIONAL FUEL AND GAS CODE BASED ON 250 FT OF
EpUIVALENT PIPE LENGTH AT 2 PSI PRESSURE (11" WC
DOW NSTREAM OF PRESSURE REGULATORS). NOTIFV PROJECT
MANAGER IMMEDIATELV WITH ANV DISCREPANCIES.
GAS PIPING GENERAL NOTES
A. ALL EXPOSED PIPING SHALL BE PAINTED W ITH A RUST INHIBITING PAINT.
8. GASTESTPRESSURESHALLBEMEASUREDWITHACERTIFIEDCALIBRATED
(DIAPHRAGM) GAUGE OR MERCURV GAUGE (MANOMETER)_ SPRMG GAUGES
SHALL NOT BE USED.
C. ALL GAS PIPMG SHALL BE TESTED AT A PRESSURE OF 10 PSIG OR
MINIMUM SIX INCHES (6") OF MERCURV.
D. PROVIDE ADDITIONAL GAS PRESSURE REGULATORS AT EpUIPMENT
CONNECTIONS AS REQUIRED. VERIFV W ITH EQUIPMENT MANUFACTURER.
E. SEEMECHANICALSHEETFORADDITIONALGASPIPINGMFORMATION,AND
SHEET P300 FOR GAS PIPMG SPECIFICATIONS.
KEY NOTES: KEY NOTES:
� EXISTMG CW SERVICE TO REMAIN. VEPoFV EXISTMG CW LME IS MIN. 16 � 3/4" FW-X DOWN WALL WITH VALVE FOR STEAMER CONNECTION. SEE
� 1". NOTIFYPROJECTMANAGERIMMEDWTELYWITHDISCREPANCIES. � DETAIL2IP110FORREFERENCEDETAILSHOWINGPIPINGSCHEMATIC
FORSTEAMER. GENERALCONTRACTORTOCOORDINATEWITH
� 2� 1/2" CW AND 1/2" HW TO HAND SINK/LAVATORV. PROVIDE WATTS KITCHEN EQUIPMENT VENDOR TO SUBMIT FlLTERED WATER SAMPLE
� MODEL LFUSGB (OR APPROVED EQUAL) THERMOSTATIC MIXMG TO STEAMER VENDOR TO DETERMME IF AUXILIARV RO SVSTEM IS
VALVE IN ACCESSBLE LOCATION. VALVE SHALL HAVE ASSE 10]0 NECESSARV. IF RO SVSTEM IS REQUIRED, ALL RO PIPING AND
LISTMG AND BE SET TO MAX. 110°F. SEE DETAIL ON 2/P210. FITTMGS TO BE APPROVED MATERIAL. PROVIDE DEDUCT ALTERNATE
#1 IF AUXILIARV RO SVSTEM IS NOT REQUIRED.
�3 EXISTINGWATERHEATERTOREMAIN.SEESCHEDULESFOR
� REFURBISHMGREQUIREMENTS. 1]� WATERFILTERSVSTEM. SEEDETAIL1IP210. COORDINATE
INSTALLATION WITH MANUFACTURER AND KITCHEN EQUIPMENT
� q REFURBISH EXISTING RECIRCULATION PUMP TO ENSURE PROPER CONTRACTOR.
� OPERATION. NOTIFV PROJECT MANAGER IMMEDIATELV WITH
DISCREPANCIES. � 18 � INLME ICE MACHME WATER FlLTER UPSTREAM OF BFP. FlLTER
REQUIRES POWER CONNECTION. COORDINATE WTLET LOCATION
5� EXISTMGHWANDCWPIPMGSERVMGEXISTMGTOILETROOMSAND WITHELECTRICALCONTRACTOR.
� SERVICE SINK TO REMAIN. VERIFV PIPE ROUTMG M FlELD.
� 19 � BEFORE WATER FILTER (ITEM E9) HAS BEEN INSTALLED, CONTRACTOR
� 6� CONNECT NEW HOT WATER AND RECIRCULATING HOT WATER PIPING � SHALLVERIFV MLET PRESSURE OF CW. IF PRESSURE IS ATOR
� TO EXISTMG PIPMG NEAR WATER HEATER. VERIFV EXISTMG PIPE eELOW 40 PSI, CONTRACTOR SHALL PROVIDE LITRE GIANTMODEL
ROUTING AND SIZE IN FIELD PRIOR TO START OF WORK. NOTIFV INLME 400 BOOSTER PUMP, WITH EXPANSION TANK, CHECK VALVES,
PROJECT MANAGER W ITH DISCREPANCIES. BALL VALVES, ETC. PER MANUFACTURER INSTALLATION
INSTRUCTIONS UPSTREAM OF WATER FILTER. PROVIDE PRV AS
�� PROVIDE BACKFLOW DEVICE WITH ASSE 1022 LISTING OR SIMILAR AS REQUIRED, AND SET TO ACMEVE 35 PSI AT FURTHEST FW OR FW-X
� REQUIREDBVAHJ.EXTENDDRAINFROMBACKFLOWDEVICETO WTLET.NOTIFVPROJECTMANAGERANDARCHITECTWITHANV
NEARESTDRAIN. DISCREPANCIES. THISWORKSHALLBEADDALTERNATEW2.
g PROVIDE POW DER COATED OUTLET BOX W ITH 1IP' 1I4-TURN BALL 20 � EXISTING GAS PIPING SERVING WATER HEATER TO REMAIN.
� VALVE. COORDINATE WITH KITCHEN EQUIPMENT SUPPLIER. �
p� SEE DETAIL 3/P210 FOR REXIeLE HOSE AND QUICK DISCONNECT AT
�9� ROUTETHEKITCHENEQUIPMENTINDIRECTWASTEPIPETOTHE KITCHENEQUIPMENTINDICATED.
� NEARESTFLOORSINWFLOORDRAIN. VERIFVEQUIPMENTINDIRECT
WASTE SRE WITH THE EQUIPMENT PROVIDER. TERMINATE INDIRECT 22 � INSTALL ANSUL SOLENOID SHUT-0FF VALVE FURNISHED BV KITCHEN
WASTE PIPING W ITH CODE APPROVED AIR GAP. � EQUIPMENT CONTRACTOR W ITH MANUAL RESET BELOW THE CEILING
IN AN ACCESSIBLE LOCATION. COORDINATE W ITH BIBIBOP
� 10 EXTEND CONDENSATE PIPMG FROM EVAPORATOR AND TERMINATE CONSTRUCTION MANAGER AND LOCAL AHJ.
AT FLOOR DRAIN W ITH AIR GAP. ROUTE PIPING ALONG INTERIOR OF
COOLER AND SEAL ALL PENETRATIONS. SEE DETAIL ON 9/P21 Q 23 � EXTEND GAS SUPPLV BEHIND COOK LINE WALL GAS PIPMG TO RUN
COORDINATE ROUTMG M FlELD. ALONG BACK SIDE OF COOK LME WALL @ 28" AEE EXTEND TO
EQUIPMENT AS INDICATED.
�11� DRAINLOCATIONSSHOWNFORREFERENCE.SEEARCHITECTURAL
� SHEET FOR DIMENSIONED LOCATIONS. p4 NEW GAS PIPMG UP THRU ROOF SEE 1/M110 FOR CONTINUATION
AND 8IP210 FOR PENETRATION DETAIL.
��2 ROUTE VENT PIPMG HORIZONTALLV IN FRONT COUNTER WALL AND
� UP FULL HEIGHT WALL WHERE INDICATED. .p5. PROVIDE PRESSURE REGULATOR WITH VENTLIMITMG DEVICE.
- REDUCEPRESSURET011"WC. PROVIDEADDITIONALPRESSURE
13 WATER PIPING ROUTED BELOW MILLWORK. PIPING SHOWN IS FOR REGULATOR AT EACH PIECE OF EQUIPMENTAS NECESSARV PER
� CLARITI'. COORDINATE ROUTMG M FlELD. EQUIPMENT MANUFACTURER REQUIREMENTS.
��14 � EXISTING HAND SINK TO BE SALVAGED AND RELOCATED. VERIFV p6 � EXISTING GREASE INTERCEPTOR TO BE CLEANED AND INSPECTED AT
� REQUIREMENTS M FlELD. START OF WORK. NOTIFV PROJECT MANAGER W ITH ANV
DEFlGENGES OR REPAIRS REQUIRED TO EXISTMG TRAP PRIOR TO
�15 EXTEND3/4"HWANDCWPIPINGT03-COMPSINKASINDICATED,AND STARTOFWORK.SEE1/P100FORADDITIONALINFORMATION.
INDIRECT WASTE PIPMG PER DETAIL �/P210.
p� EXISTMG WATER FlLTER AND WATER SOFTENER TO REMAIN.
REPLACE FlLTER AND ENSURE SOFTENER IS IN GOOD WORKING
ORDER. NOTIFVPROJECTMANAGERWITHANVDISCREPANCIES.
�28� EXTENDNEWVENTPIPINGANDCONNECTTOMIN.Y'EXISTINGVENT
PIPMG SERVMG EXISTMG TOILET ROOMS AN/OR SERVICE SINK.
COORDINATE ROUTMG AND CONNECTION LOCATION M FlELD.
E106 I
E104J-
11
365 WEST 116TH STREET
SUITE 140
CARMEL, INDIANA 46032
BIBIBOPSTORENO.: TBD
BIBIBOP PO NO: THE BRIDGES
PROIEQ NO.:
DRAW N BV:
CHECKE� 8V'
ISSUES AND REVISIONS:
LL/QIENT REVIEW SET
PERMIT ISSUE
0420995-119
TA8
GMS
11262019
12.112019
SHEET TITLE:
PLUMBING PLAN
P110