HomeMy WebLinkAbout19.12.17-Bibibop The Bridges-Mechanical COMcheckCOMcheck Software Version 4.1.1.0
Mechanical Compliance Certificate
Project Title:
90.1 (2007) Standard
Project Type:Alteration
Location:Carmel, Indiana
Climate Zone:5a
Construction Site:
365 W 116th St
Carmel, IN 46032
Owner/Agent:
Bibibip
Designer/Contractor:
Dunham Associates
50 S 6th St
Suite 1100
Minneapolis, MN 55402
612-465-7550
Project Information
Energy Code:
Bibibop
Mechanical Systems List
Quantity System Type & Description
Split System Heat Pump
Heating Mode: Capacity = 26 kBtu/h,
Proposed Efficiency = 11.00 HSPF, Required Efficiency = 7.70 HSPF
Cooling Mode: Capacity = 24 kBtu/h,
Proposed Efficiency = 21.40 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 2 Supply, Constant Volume, 700 CFM, 0.1 motor nameplate hp
SYSTEM VERIFICATION REQUIRED.
1 HVAC System 1
Split System Heat Pump
Heating Mode: Capacity = 26 kBtu/h,
Proposed Efficiency = 11.20 HSPF, Required Efficiency = 7.70 HSPF
Cooling Mode: Capacity = 24 kBtu/h,
Proposed Efficiency = 24.20 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 800 CFM, 0.1 motor nameplate hp
SYSTEM VERIFICATION REQUIRED.
1 HVAC System 2
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
Bibibop
P:\2020\0420995-119-00 Bibibop - The Bridges - Carmel, IN\06-Energy\119_Mech Comcheck.cck
12/17/19Report date:
91 ofPage
Katie Hager - PE 12/17/2019
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 90.1 (2007) Standard
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
4.2.2,
6.4.2
[PR2]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
4.2.2,
7.4.1
[PR3]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.4
[PR5]1
Detailed instructions for HVAC
systems commissioning included on
the plans or specifications for projects
>=50,000 ft2.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bibibop
P:\2020\0420995-119-00 Bibibop - The Bridges - Carmel, IN\06-Energy\119_Mech Comcheck.cck
12/17/19Report date:
92 ofPage
Section
#
& Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
6.4.3.8
[FO9]3
Freeze protection and snow/ice
melting system sensors for future
connection to controls.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bibibop
P:\2020\0420995-119-00 Bibibop - The Bridges - Carmel, IN\06-Energy\119_Mech Comcheck.cck
12/17/19Report date:
93 ofPage
Section
#
& Req.ID
Mechanical Rough-In
Inspection
Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
6.4.1.4,
6.4.1.5
[ME1]2
HVAC equipment efficiency
verified. Non-NAECA HVAC
equipment labeled as meeting
90.1.
Efficiency:_____Efficiency:_____Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list
for values.
6.4.3.4.1
[ME3]3
Stair and elevator shaft vents
have motorized dampers that
automatically close.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.4.3.4.2,
6.4.3.4.3,
6.4.3.4.4
[ME4]3
Outdoor air and exhaust systems
have motorized dampers that
automatically shut when not in
use and meet maximum leakage
rates. Check gravity dampers
where allowed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.4.5
[ME5]3
Ventilation fans >0.75 hp have
automatic controls to shut off fan
when not required.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.9
[ME6]1
Demand control ventilation
provided for spaces >500 ft2 and
>40 people/1000 ft2 occupant
density and served by systems
with air side economizer, auto
modulating outside air damper
control, or design airflow >3,000
cfm.
Complies
Does Not
Not Observable
Not Applicable
Exception: Systems with a
design outdoor airflow less
than 1200 cfm.
6.4.4.1.1
[ME7]3
Insulation exposed to weather
protected from damage.
Insulation outside of the
conditioned space and associated
with cooling systems is vapor
retardant.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.1.2
[ME8]2
HVAC ducts and plenums
insulated.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.1.3
[ME9]2
HVAC piping insulation thickness._____ in._____ in.Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.2.1
[ME10]2
Ducts and plenums sealed based
on static pressure and location.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage
testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage
testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bibibop
P:\2020\0420995-119-00 Bibibop - The Bridges - Carmel, IN\06-Energy\119_Mech Comcheck.cck
12/17/19Report date:
94 ofPage
Section
#
& Req.ID
Mechanical Rough-In
Inspection
Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
6.5.2.3
[ME19]3
Dehumidification controls
provided to prevent reheating,
recooling, mixing of hot and cold
airstreams or concurrent heating
and cooling of the same
airstream.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.5.4.1
[ME25]3
HVAC pumping systems >10 hp
designed for variable fluid flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.5.6.1
[ME30]1
Exhaust air energy recovery on
systems >=5,000 cfm and 70%
of design supply air.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.7.1
[ME32]2
Kitchen hoods >5,000 cfm have
make up air >=50% of exhaust
air volume.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.7.2
[ME33]1
Fume hoods exhaust systems
>=15,000 cfm have VAV hood
exhaust and supply systems,
direct make-up air or heat
recovery.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.8.1
[ME34]3
Unenclosed spaces that are
heated use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bibibop
P:\2020\0420995-119-00 Bibibop - The Bridges - Carmel, IN\06-Energy\119_Mech Comcheck.cck
12/17/19Report date:
95 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
10.4.1
[EL9]2
Electric motors meet requirements
where applicable.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bibibop
P:\2020\0420995-119-00 Bibibop - The Bridges - Carmel, IN\06-Energy\119_Mech Comcheck.cck
12/17/19Report date:
96 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
6.4.3.1.1
[FI2]2
Heating and cooling to each zone is
controlled by a thermostat control.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.1.2,
6.4.3.2,
6.4.3.3,
6.4.3.3.1,
6.4.3.3.2
[FI3]2
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.5
[FI5]3
Heat pump controls prevent
supplemental electric resistance heat
from coming on when not needed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.5
[FI5]3
Heat pump controls prevent
supplemental electric resistance heat
from coming on when not needed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.7
[FI6]3
When humidification and
dehumidification are provided to a
zone, simultaneous operation is
prohibited.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.2
[FI8]3
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.3
[FI9]1
An air and/or hydronic system
balancing report is provided for HVAC
systems serving zones >5,000 ft2 of
conditioned area.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.7.2.4
[FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.2
[FI20]1
Temperature controls have setpoint
overlap restrictions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.3.1
[FI21]1
HVAC systems equipped with at least
one automatic shutdown control.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.3.2
[FI22]1
Setback controls allow automatic
restart and temporary operation as
required for maintenance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bibibop
P:\2020\0420995-119-00 Bibibop - The Bridges - Carmel, IN\06-Energy\119_Mech Comcheck.cck
12/17/19Report date:
97 ofPage
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bibibop
P:\2020\0420995-119-00 Bibibop - The Bridges - Carmel, IN\06-Energy\119_Mech Comcheck.cck
12/17/19Report date:
98 ofPage
Project Title:
Data filename:
Bibibop
P:\2020\0420995-119-00 Bibibop - The Bridges - Carmel, IN\06-Energy\119_Mech Comcheck.cck
12/17/19Report date:
99 ofPage