Hotel construction change orders (2-19-20)
Company Contract Detail Project Dollar Amount Funding Shiel Sexton Construction Manager See attached detail Hotel Carmichael 154,501.00$ Hotel bonds, 2016 TIF Bond, CRC Funds RL Turner General Trades See attached detail Hotel Carmichael (484,800.00)$ Hotel bonds, 2016 TIF Bond, CRC Funds RL Turner Concrete See attached detail Hotel Carmichael (4,840.00)$ Hotel bonds, 2016 TIF Bond, CRC Funds StresCore Hollow Core See attached detail Hotel Carmichael (13,233.00)$ Hotel bonds, 2016 TIF Bond, CRC Funds Broady Campbell Masonry See attached detail Hotel Carmichael (11,580.00)$ Hotel bonds, 2016 TIF Bond, CRC Funds Indiana Steel Fabricating Structural Steel See attached detail Hotel Carmichael 43,215.00$ Hotel bonds, 2016 TIF Bond, CRC Funds MoFab Decorative Railings See attached detail Hotel Carmichael 31,523.00$ Hotel bonds, 2016 TIF Bond, CRC Funds Chisholm Lumber & Supply Finish Carpentry See attached detail Hotel Carmichael 801,539.00$ Hotel bonds, 2016 TIF Bond, CRC Funds Horning Roofing Roofing and Sheet Metal See attached detail Hotel Carmichael 72,687.00$ Hotel bonds, 2016 TIF Bond, CRC Funds MAB Storefronts, Entrances, Windows See attached detail Hotel Carmichael 28,233.00$ Hotel bonds, 2016 TIF Bond, CRC Funds Quality Interiors Framing, Ceilings, EIFS See attached detail Hotel Carmichael 286,480.00$ Hotel bonds, 2016 TIF Bond, CRC Funds EF Marburger and Son Resilient, Carpet, Wood Flooring See attached detail Hotel Carmichael 66,000.00$ Hotel bonds, 2016 TIF Bond, CRC Funds Inline Painting Paint and Wall Coverings See attached detail Hotel Carmichael 41,583.00$ Hotel bonds, 2016 TIF Bond, CRC Funds Central Restaurant Products Kitchen Equipment See attached detail Hotel Carmichael 42,126.00$ Hotel bonds, 2016 TIF Bond, CRC Funds F.E. Moran Fire Protection See attached detail Hotel Carmichael 3,194.00$ Hotel bonds, 2016 TIF Bond, CRC Funds Gordon Plumbing Plumbing See attached detail Hotel Carmichael 106,610.00$ Hotel bonds, 2016 TIF Bond, CRC Funds DEEM HVAC/Mechanical See attached detail Hotel Carmichael 9,000.00$ Hotel bonds, 2016 TIF Bond, CRC Funds Huston Electric Electrical See attached detail Hotel Carmichael 74,833.00$ Hotel bonds, 2016 TIF Bond, CRC Funds Total 1,247,071.00$ 902 Fund Carmel Redevelopment Commission Approval of Change Orders 2/19/2020 Approved Change Log Hotel Carmichael #Contract Contract Title CO #Description Value 1 2.0 General Trades 1 Rev 8 - Alternate WaterProofing (23,000)$ 2 2.0 General Trades 1 Rev 8 - Alternate Balcony Coating (5,000)$ 3 2.0 General Trades 1 Rev 8 - Deletion of (2) gas fireplaces (25,920)$ 4 2.0 General Trades 1 Rev 8 - Door Hardware Revisions 8,376$ 5 2.0 General Trades 1 RFI 066--Added Expansion Joint 3,118$ 6 2.0 General Trades 1 Revision 11 Exterior Façade Changes - Joint Sealants 17,795$ 7 2.0 General Trades 1 Revision 11 Exterior Façade Changes - Expansion Joint 2,068$ 8 2.0 General Trades 1 Revision 11 Exterior Façade Changes - EIFS (140,296)$ 9 2.0 General Trades 1 Revision 11 Exterior Façade Changes - EIFS Bond Costs (1,403)$ 10 2.0 General Trades 1 DFH Submittal Questions Clarifications - welded frames, misc changes 16,864$ 11 2.0 General Trades 1 Remove TA F&I From Scope (41,388)$ 12 2.0 General Trades 1 Provide Gas options for Fireplace 2,116$ 13 2.0 General Trades 1 RFI 147/RFI 162 - Revised Opening 145F Framing/Door 2,018$ 14 2.0 General Trades 1 RFI 151 - Added EIFS at East Elevation 9,417$ 15 2.0 General Trades 1 RFI 151 - Additional Limestone Finish per RFI Response 24,582$ 16 2.0 General Trades 1 Remove DFH Install from Scope (194,079)$ 17 2.0 General Trades 1 Remove EIFS Scaffolding/Lifts from Scope (49,907)$ 18 2.0 General Trades 1 Delete Corner Guards per Show Drawing Review (10,140)$ 19 2.0 General Trades 1 RFI 173 - Fitness Room Door Conflict. New Door & Frame 2,050$ 20 2.0 General Trades 1 RFI 176 - Added Fire Extiguishers per Elevator Code Reqs.524$ 21 2.0 General Trades 1 Change Shower Doors to Custom Frosted Glass with Design 41,214$ 22 2.0 General Trades 1 Deduct Assa Abloy Install (12,550)$ 23 2.0 General Trades 2 RFI 139--Fire Extinguisher Cabinet Revisions 2,000$ 24 2.0 General Trades 2 Delete Waterproofing West/South Balconies (114,004)$ 25 2.0 General Trades 2 Revision 22 - Door Hardware Changes. Per Fire Marshall 744$ 26 3.1 Building Concrete 1 B/C- from ISF--Cut Column at 305C1 Base Plate and Weld (1,293)$ 27 3.1 Building Concrete 1 RFI 077 - Delete Concrete Curbs at Bars (1,889)$ 28 3.1 Building Concrete 1 RFI 091 - Delete Concrete Curbs at 3rd floor (3,187)$ 29 3.1 Building Concrete 1 RFI 099 - Concrete Curb Locations 1, 2, & Roof 1,529$ 30 3.2 Hollowcore Planks 1 B/C from QII. Infill at Suite B. Hollowcore too short (2,040)$ 31 3.2 Hollowcore Planks 1 B/C from QII. Wreck Forms at 6th Floor for StresCore Concrete Work (1,020)$ 32 3.2 Hollowcore Planks 1 B/C from ISF--T&M--Fix Embeds at Hollowcore -Mislocated/Missing (1,927)$ 33 3.2 Hollowcore Planks 1 B/C from ISF--T&M--Rework Broken Sections B147/B150. Arrived Broke (912)$ 34 3.2 Hollowcore Planks 1 B/C from ISF--T&M--Install Plates at Missing Embed Locations (2,624)$ 35 3.2 Hollowcore Planks 1 B/C from ISF--T&M--Cut Planks that were too long (4,710)$ 36 4.1 Masonry 1 Delete Cast Stone Balustrade btwn CL 26-28 and 11-17 (33,300)$ 37 4.1 Masonry 1 Revision 11--Exterior Façade Revisions 3,980$ 38 4.1 Masonry 1 Revision 13--Structural Changes for Exterior Façade Rev 11 15,790$ 39 4.1 Masonry 1 Rev. 17/RFI 130 - Add masonry wall at 2nd NW 1,950$ 40 5.1 Structural Steel 1 Revision 13 - Exterior Façade Changes - lintels/Bent plate 1,700$ 41 5.1 Structural Steel 1 RFI 130 - Provide Bent Plate & Guardrail at 2nd N elev E end.2,300$ 42 5.1 Structural Steel 1 8.6.19--RFI 109--T&M 5-- 8.6.19--Install Angle at at A-A.7.3,039$ 43 5.1 Structural Steel 1 Rev 15 & 17 - Porte Cochere Revisions 30,230$ 44 5.1 Structural Steel 1 RFI 077 - Delete Misc Steel at Bars (3,200)$ 45 5.1 Structural Steel 1 Delete Site Bollards--Furnish Only (1,100)$ 46 5.1 Structural Steel 1 Hand/Gurd Rail Changes - Loading Dock, Ramp 105, Exterior Walk, 3 rail to picket 800$ 47 5.1 Structural Steel 1 T&M 4--Cut Column at 305C1 Base Plate and Weld-Backcharge to RL Turner 1,293$ 48 5.1 Structural Steel 1 5.30.19--T&M 6--Fix Embeds at Hollowcore -Mislocated/Missing--B/C to StresCore 1,927$ 49 5.1 Structural Steel 1 5.30.19--T&M 10--Rework Broken Sections B147/B150. Arrived Broke--B/C to StresCore 912$ 50 5.1 Structural Steel 1 7.19.19--T&M--Install Plates at Missing Embed Locations--B/C to StresCore 2,624$ 51 5.1 Structural Steel 1 8.14-8.27.19--T&M--Cut Planks that were too long--B/C to StresCore 4,710$ 52 5.1 Structural Steel 1 B/C from QII - Cleaning floors 5-6 of debris, grout, etc. to allow for framing (2,020)$ 53 5.2 Ornamental Railings 1 Revision 17 - Grand Stair Design changes 14,046$ 54 5.2 Ornamental Railings 1 Feinstein Club--Ornamental Railings 12,159$ 55 5.2 Ornamental Railings 1 Feinstein Club--BackBar Ornamental Doors 5,318$ 56 6.1 Finish Carpentry 1 Added Door Casing & Jamb at GA RR Toilet Door 46,000$ 57 6.1 Finish Carpentry 1 Add Trim at Shower Doors 14,000$ 58 6.1 Finish Carpentry 1 Add Window Casing at Suites 7,800$ 59 6.1 Finish Carpentry 1 Delete Drapery Pocket Framing--Original Contract Amount (32,261)$ 60 6.1 Finish Carpentry 2 Feinstein Club 766,000$ 61 7.5 Roofing 1 Porte Cochere Revisions. Added Pavers 13,217$ 62 7.5 Roofing 1 RFI 131 - Suite 312 Added Curbs. Scupper, flashing, copings 2,051$ 63 7.5 Roofing 1 Add back in Grand Manor Shingles 14,900$ 64 7.5 Roofing 1 Misc. Curb Flashing (Balance not covered in allowance)8,819$ 65 7.5 Roofing 1 Waterproofing Membrane at Balcony 33,700$ 66 8.5 Storefronts/Windows 1 Caulk at Window (at DensGlass)--Per Architect Field Visit 20,485$ 67 8.5 Storefronts/Windows 1 Glazing for all interior door not per plans 5,043$ 2/12/2020 68 8.5 Storefronts/Windows 1 Reorder Glass at Spec Rest, Framing & Conc. B/C--2.0/9.1 2,705$ 69 9.1 Framing/Drywall 1 Removal of framing at EIFS cornice--Original VE (19,500)$ 70 9.1 Framing/Drywall 1 Guestroom Corridors—Delete Intermediate Coffered Ceilings--(Original VE--By Contract 6.1)(41,200)$ 71 9.1 Framing/Drywall 1 Delete Lighting Coves at Guestroom Showers--Original VE (10,650)$ 72 9.1 Framing/Drywall 1 Public Areas—Delete Cross Patterned Ceilings-Prefunction/Lobby--(Original VE--By Contract 6.1)(29,400)$ 73 9.1 Framing/Drywall 1 Rev 11--Delete Wall Framing between CL Z-T (2,840)$ 74 9.1 Framing/Drywall 1 Delete Ceramic Board at Guestroom Showers (Provided by Contract 9.1)(19,940)$ 75 9.1 Framing/Drywall 1 Revision 8--Added Framing at 3rd Floor Mechanical Parapet(VE--Removed Ornamental Railing)5,110$ 76 9.1 Framing/Drywall 1 RFI 067 - Beam Conflicts and Architectural Layout 17,080$ 77 9.1 Framing/Drywall 1 RFI 077--Delete Wall at Casework Bars Specialty Rest (By Contract 6.1)(2,510)$ 78 9.1 Framing/Drywall 1 RFI 085 - Ramp 105 W Firewall Conflict - Shift RR wall W., reframe 520$ 79 9.1 Framing/Drywall 1 Change from KD to Welded Frames--Walls Previously Framed 2,040$ 80 9.1 Framing/Drywall 1 RFI 091 - Delete Conc Curbs, add plywood ILO sheathing 2,170$ 81 9.1 Framing/Drywall 1 Revise Framing for Drapery Pocket--Model Room Comments 20,350$ 82 9.1 Framing/Drywall 1 Revision 11--2nd Floor N Elevation Wall Location Changes T&M Tickets 570$ 83 9.1 Framing/Drywall 1 Reframed Windows D1 to revised elevation per GSB (moved up)1,140$ 84 9.1 Framing/Drywall 1 RFI 107 - Added Sheathing, Drywall, & Framing at Structural Steel Walls 19,100$ 85 9.1 Framing/Drywall 1 RFI 101 - Additional Walls to encapsulate Plumbing pipes at Kitchen 1,140$ 86 9.1 Framing/Drywall 1 RFI 103 - Add Framed Door Sill at 3rd Low Roof door 320$ 87 9.1 Framing/Drywall 1 Delete Air/Vapor Barrier at Fiber Cement (Covered in Contract 2.0)(20,170)$ 88 9.1 Framing/Drywall 1 Credit For Framing Revisions at Revised Window Details for EIFS, in conjunction w/Original VE (11,130)$ 89 9.1 Framing/Drywall 1 RFI 127--Re frame at Roof Davits 280$ 90 9.1 Framing/Drywall 1 RFI 122 - High Roof Dog House Framing Details 8,830$ 91 9.1 Framing/Drywall 1 RFI 133--Fireproof Sealant on Elevator Shaftwall 4,970$ 92 9.1 Framing/Drywall 1 RFI 124 - EFW-1 Drain/Mixing Valve Conflict. Added wall furing 350$ 93 9.1 Framing/Drywall 1 RFI 153--Add Fur Out of Corridor Levels 3-6 to Miss Brace Framing 10,670$ 94 9.1 Framing/Drywall 1 Rev. 17 - Change from Pocket Doors to Standard Swing 850$ 95 9.1 Framing/Drywall 1 RFI 122--Add roof blocking at roof doghouse--Dog House--Needed for Roofing 550$ 96 9.1 Framing/Drywall 1 RFI 158 - Fitness Room Conflicts. Add Chase, Bulkheads 1,370$ 97 9.1 Framing/Drywall 1 GFRC Pedestal Slope Change 1,880$ 98 9.1 Framing/Drywall 1 RFI 172 - Column Splice & Framing Conflict. Added Furing and column wrap 1,630$ 99 9.1 Framing/Drywall 1 RFI 164 - 6th Floor Wall Rating at Mansard Roof 61,170$ 100 9.1 Framing/Drywall 1 RFI 177 - Revised Framing at Suite B Tub 240$ 101 9.1 Framing/Drywall 1 RFI 130 - Added Framing & Blocking for Guardrail at 2nd N, E 610$ 102 9.1 Framing/Drywall 1 RFI 142 --Reframe Fireplace 1,240$ 103 9.1 Framing/Drywall 1 RFI 181 - Add Ceilings at Stairwells to conceal beams 14,010$ 104 9.1 Framing/Drywall 1 Feinstein Club 166,670$ 105 9.1 Framing/Drywall 1 RFI 204--Frame Columns at Cart Room 480$ 106 9.1 Framing/Drywall 1 RFI 189---Reframe Ballroom Column 820$ 107 9.1 Framing/Drywall 1 Premium Time-9/3/19 380$ 108 9.1 Framing/Drywall 1 Premium Time-9/4/19 330$ 109 9.1 Framing/Drywall 1 Premium Time-9/6/19 610$ 110 9.1 Framing/Drywall 1 Premium Time-9/7/19 2,440$ 111 9.1 Framing/Drywall 1 Premium Time-9/5/19 560$ 112 9.1 Framing/Drywall 1 Premium Time-9/9/19 560$ 113 9.1 Framing/Drywall 1 Premium Time-9/10/19 610$ 114 9.1 Framing/Drywall 1 Premium Time-9/11/19 560$ 115 9.1 Framing/Drywall 1 Premium Time-9/12-9/18 8,040$ 116 9.1 Framing/Drywall 1 Premium Time-9/19 - 9/27 6,290$ 117 9.1 Framing/Drywall 1 Premium Time-9/28-10/4 4,940$ 118 9.1 Framing/Drywall 1 Premium Time-10/5 - 10/9 2,560$ 119 9.1 Framing/Drywall 1 Premium Time - 10/5 - 10/9--Drywall 2,880$ 120 9.1 Framing/Drywall 1 Premium Time--10/10 - 10/19--Exterior 3,130$ 121 9.1 Framing/Drywall 1 Premium Time--10/10 - 10/12 1,810$ 122 9.1 Framing/Drywall 1 Premium Time--10/13--Sunday Drywall Hang 3,400$ 123 9.1 Framing/Drywall 1 Premium Time--10/23-10/28--Exterior 620$ 124 9.1 Framing/Drywall 1 Premium Time--10/26-11/2--Drywall 8,380$ 125 9.1 Framing/Drywall 1 Premium Time at 6th Floor Ceilings 1,800$ 126 9.1 Framing/Drywall 1 6th Floor Premium Overtime--12/11, 12/18, 12/21 3,620$ 127 9.1 Framing/Drywall 2 B/C To ISF - Cleaning floors 5-6 of debris, grout, etc. to allow for framing 2,020$ 128 9.1 Framing/Drywall 2 B/C To Strescore - Infill Suite B Balcony. Hollowcore too short 2,040$ 129 9.1 Framing/Drywall 2 Reframe Bathroom Toilet Doors for Resized Door--Due to Added Wood Jambs-Model Room Rvw 1,840$ 130 9.1 Framing/Drywall 2 Wreck Forms at 6th Floor for Sofco Concrete Work 1,020$ 131 9.1 Framing/Drywall 2 Guestroom Chandelier Medallions 3,110$ 132 9.1 Framing/Drywall 2 Tile Backer Board-ADA Rooms--Backed out in 004 2,170$ 133 9.1 Framing/Drywall 2 Rev.21--Monument Sign Added Urn 3,500$ 134 9.1 Framing/Drywall 2 Premium Time -1/11 -1/15 8,090$ 135 9.1 Framing/Drywall 2 RFI 145 - 6th Floor Angled Columns at Framing Conflict. Reframe columns, clg dtl 16,360$ 136 9.1 Framing/Drywall 2 PT for 6th Floor Ceilings 1,690$ 137 9.1 Framing/Drywall 2 RFI 184 - Reframe walls for welded frames ILO KD 2,300$ 138 9.6 Carpet/Resilient 1 Feinstein Club 66,000$ 139 9.9 Painting 1 Add to Paint Suite Window Trim--Added Scope 3,236$ 140 9.9 Painting 1 RFI 181 - Texture & Paint Exposed Concrete in Stairwell 14,385$ 141 9.9 Painting 1 Feinstein Club 23,963$ 142 11.4 Kitchen Equipment 1 Remove Ice Makers from Scope. To be Leased by Operator (10,511)$ 143 11.4 Kitchen Equipment 1 Owner Requested Kitchen Eq Additions 13,098$ 144 11.4 Kitchen Equipment 1 Feinstein Club 36,083$ 145 11.4 Kitchen Equipment 1 Added Washer and Dryer 3,456$ 146 21.1 Fire Protection 1 RFI 158 - Rework of Fitness Room due to Clg. Hgt. Conflict 1,593$ 147 21.1 Fire Protection 1 RFI 153 - Furout Corridor. Relocate Sprinkler Heads 1,601$ 148 22.1 Plumbing 1 Rev. 8 Plans 25,948$ 149 22.1 Plumbing 1 RFI 40 - 3rd Floor Balcony Roof Changes 6,132$ 150 22.1 Plumbing 1 RFI 126 - EWC-1 Location 1,089$ 151 22.1 Plumbing 1 Change From Delta to Brizo to Brizo Invari 52,757$ 152 22.1 Plumbing 1 Feinstein Club 8,929$ 153 22.1 Plumbing 1 RFI 170 - 1st Kitchen Gas Valve Location. Add Vert. Drops 1,931$ 154 22.1 Plumbing 2 RFI 189 - Ballroom Plumbing Relocated Pipe 1,828$ 155 22.1 Plumbing 2 Rev 21--Added Washer and Dryer 4,100$ 156 22.1 Plumbing 2 Coury requested Kitchen Equipment Additional Provisions 3,895$ 157 23.1 HVAC 1 Feinstein Club 9,000$ 158 26.1 Electrical 1 RFP 4 - Rev. 8 Changes & Rev 10 Electrical Gear Upgrade 96,092$ 159 26.1 Electrical 1 Rev. 10 Changes--Wi-Fi/Low Voltage 59,790$ 160 26.1 Electrical 1 Original VE: Change Buss for Panelboards to Aluminum-Transformer To Aluminum and 150 Degree Rise (35,000)$ 161 26.1 Electrical 1 Rev. 12 Changes--Smoke Damper Changes (55,731)$ 162 26.1 Electrical 1 Rev. 13 Changes--FA, LV, Technology Misc Changes (129,614)$ 163 26.1 Electrical 1 Originally Removed in Contract: Add back in L20, L25, L26, L27 Fixtures 32,000$ 164 26.1 Electrical 1 Changes for FA Tie-in to accommodate City 12,331$ 165 26.1 Electrical 1 Fiber Changes--Weatherhead/City Feed 27,335$ 166 26.1 Electrical 1 RFI 141 - ADA Comm Rooms. Add Visual Alarms 38,625$ 167 26.1 Electrical 1 VE Light Fixture Package (68,000)$ 168 26.1 Electrical 1 RFI 155 - Fitness Room. Revised layout. Added power/data.--Less Fixtures 12,411$ 169 26.1 Electrical 1 Rev. 18 - FA Changes per Marriott Review 10,999$ 170 26.1 Electrical 1 Rev 20 - Added Lighting at Retail 9,585$ 171 26.1 Electrical 1 Rev 19 12,486$ 172 26.1 Electrical 1 Rev. 15 ---Deleted switches at Bathrooms (524)$ 173 26.1 Electrical 2 T&M #6 - RFI 153 - Rework electrical due to wall furout at 3rd corridor.1,619$ 174 26.1 Electrical 2 T&M #10 - RFI 153 - 4th Floor Corridor Wall Furout 593$ 175 26.1 Electrical 2 T&M #11 - RFI 153 - 5th Floor Corridor Wall Furout 593$ 176 26.1 Electrical 2 December 2019--Overtime Costs 5,885$ 177 26.1 Electrical 2 November 2019--Overtime Costs 20,611$ 178 26.1 Electrical 2 January 2020--Overtime Costs 15,269$ 179 26.1 Electrical 2 T&M #24--Kitchen Equipment Additional Provisions 9 (partial work)952$ 180 26.1 Electrical 2 T&M #32 - RFI 176 - Added Switches & Circuiting at 6th per Elevator Code Req.2,032$ 181 26.1 Electrical 2 T&M #33 - B/C to Gordon Rewire DHW Booster Pump for Gordon 642$ 182 26.1 Electrical 2 T&M #37 - POS Rough Ins 895$ 183 26.1 Electrical 2 RFI 234 - Add Power for EWC & Fridge at Reception Desk 2,957$ Anticipated Totals (Excludes CM Fees)1,092,570$