Loading...
HomeMy WebLinkAboutS202-Sections & Details-f i i i i FOR BUILT-UP POST,SEE QZ,S-2�2 — FOR BUILT-UP BEAM,SEE aais-zoz — 4"x4"x0'-3" LONG x54-MIL.ANGLE WITH 4-#12 S.M.S. TO BM. AND 4-#12 S.M.S. TO POST 54-MIL PL. x 6"x8" EA. SIDE Wlfi-N0.10SCREWSTO POST & BM EA SIDE 4"x4"x0'-3" LONG x54-MIL.ANGLE WITH 4#12 S.M.S. TO BM. AND 4-#12 S.M.S. TO POST 01 BEAM TO POST CONNECTION 314'•=1•-0•' FOR BUILT BEAM - SEE 04/S402 5162-54 3LE MEMBER POST W/ 362T125-54 TRACK S.M.S. AT POINT OF 1(S) OR REACTION(S), JAL AT BUILT-UP � (8 SCREWS ON THE OPP.FACESNOT NN) i.M.S. al 17' OQ :AL AT BUILT-UP "(4 SCREWS ON �WOOPP. FACES SHOWN) 02 BUILT-UP POST 314'•=1•-0•• SEPHORA i �- 525 MARKET STREET, 32ND FLOOR SAN FRANCISCO, CA 94105 Ber me er g Y MICHAEL J. MCLAREN, P. E. PROJECT #1915705 12001 N. CENTRAL EXPRESSWAV, SUITE 300 DALLAS,TEXAS 75243 214]39.8100 FAX214]396354 STAMP RELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel `�y,:a���'.�`� �,�:;vaYa/„1��. DATE: QZ�Z�J�2O � � � STOP TRACKS OF BUILT-UP POST SHORT OF BOTTOM TRACK x il7'MAXIMUM � � �� �n e o � , � 54MILTRACKW/3-HILTI �3�� X-U P.A.F. TO GONGRETE SLAB (1 1/4" EMBED) COPE FLANGES EA. END. WEB PROTRUDES3"EA.END - FOR BUILT-UP POST, SEE 02/52.1 2-#12 S.M.S., EACH SIDE (OPP. SI�E NOT SHOWN) 03 POST BASE DETAIL 314••_1•-0•• BUILT-UP BM (SEE SIZES)W/362T150� TOP 8 80T (TYP) 8-#8 SMS @ 12" OC BOT) SCREWS ON � OPP FACES NOT Shvv.n 04 BUILT-UP BEAM 314••=1•-0•• � Q DATE ISSUEDESCRIPTION BY CHECK 100] 19 DESIGN �EVELOPMENT 11 04.19 ISSUE FOR PERMIT 11 25.19 ISSUE FOR BIO iQ 01.1I20 REV 1 PROJECTLOCATION: CLAY TERRACE 14390 CLAY TERRACE BLVD SPACE D13 CARMEL, IN 46032 AREA: 4,129 SF SHEET TITLE: SECTIONS & DETAI�S PROJECTNO. 19122 STORENO. 1326 SCALE: AS NOTED DATE: 11.042019 DRAWN BY: REVIEWED BY: S E N . S-202 � 19102113I2010) I