HomeMy WebLinkAboutS202-Sections & Details-f
i
i
i
i
FOR BUILT-UP
POST,SEE
QZ,S-2�2 —
FOR BUILT-UP
BEAM,SEE
aais-zoz —
4"x4"x0'-3" LONG
x54-MIL.ANGLE WITH
4-#12 S.M.S. TO BM.
AND 4-#12 S.M.S. TO
POST
54-MIL PL. x 6"x8" EA. SIDE
Wlfi-N0.10SCREWSTO
POST & BM EA SIDE
4"x4"x0'-3" LONG
x54-MIL.ANGLE WITH
4#12 S.M.S. TO BM.
AND 4-#12 S.M.S. TO
POST
01 BEAM TO POST CONNECTION
314'•=1•-0•'
FOR BUILT
BEAM - SEE
04/S402
5162-54
3LE MEMBER POST W/
362T125-54 TRACK
S.M.S. AT POINT OF
1(S) OR REACTION(S),
JAL AT BUILT-UP
� (8 SCREWS ON THE
OPP.FACESNOT
NN)
i.M.S. al 17' OQ
:AL AT BUILT-UP
"(4 SCREWS ON
�WOOPP. FACES
SHOWN)
02 BUILT-UP POST
314'•=1•-0••
SEPHORA
i
�-
525 MARKET STREET, 32ND FLOOR
SAN FRANCISCO, CA 94105
Ber me er
g Y
MICHAEL J. MCLAREN, P. E.
PROJECT #1915705
12001 N. CENTRAL EXPRESSWAV, SUITE 300
DALLAS,TEXAS 75243
214]39.8100 FAX214]396354
STAMP
RELEA5E0 FOR CONSTRUCTION
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
`�y,:a���'.�`� �,�:;vaYa/„1��.
DATE: QZ�Z�J�2O
�
�
�
STOP TRACKS OF
BUILT-UP POST
SHORT OF BOTTOM
TRACK
x
il7'MAXIMUM � � �� �n e
o �
, �
54MILTRACKW/3-HILTI �3��
X-U P.A.F. TO GONGRETE
SLAB (1 1/4" EMBED) COPE
FLANGES EA. END. WEB
PROTRUDES3"EA.END
- FOR BUILT-UP
POST, SEE 02/52.1
2-#12 S.M.S., EACH SIDE
(OPP. SI�E NOT SHOWN)
03 POST BASE DETAIL
314••_1•-0••
BUILT-UP BM (SEE
SIZES)W/362T150�
TOP 8 80T (TYP)
8-#8 SMS @ 12" OC
BOT) SCREWS ON �
OPP FACES NOT Shvv.n
04 BUILT-UP BEAM
314••=1•-0••
�
Q DATE ISSUEDESCRIPTION BY CHECK
100] 19 DESIGN �EVELOPMENT
11 04.19 ISSUE FOR PERMIT
11 25.19 ISSUE FOR BIO
iQ 01.1I20 REV 1
PROJECTLOCATION:
CLAY TERRACE
14390 CLAY TERRACE BLVD
SPACE D13
CARMEL, IN 46032
AREA: 4,129 SF
SHEET TITLE:
SECTIONS & DETAI�S
PROJECTNO. 19122
STORENO. 1326
SCALE: AS NOTED
DATE: 11.042019
DRAWN BY:
REVIEWED BY:
S E N .
S-202 �
19102113I2010) I