HomeMy WebLinkAboutA201 REFLECTED CEILING DEMO 2020-01-29 PVA Construction Setr—r__i _�__
ii
i)
�
REMOVE EXISTING SURFACE
� MOUNTLIGHT�\�
1
� A \I
�I �J
REMOVE CEILING GRID, REMOVE RECESSED LIGHT FIXTURE.
RELOCATE DIFFUSER AND EXIT SIGN.
i)
�
I C)
0
0
WALL
ir
I�
II
�
�
�
�
�
�
�
` REMOVE ALL LIGHT RXTURES
AND REPLACE WITH NEW LED
FIXTURES (TVP) REMOVE ALL
CEILING TILE AND RETAIN
GEILING GRID IN PLACE (TVPJ
REMOVE ALL LIGHT RXTURES
AND REPLACE WITH NEW LED
FI%TURES. (TVP) REMOVE ALL
CEILMG TILE AND RETAIN
CEILMG GRID IN PLACE (TVP)
CEILING PLAN LEGEND
� EXISTINGCEILING � E%ITSIGN
� � LAV-IN FIXTURE
RETURN GRILLE
� � LAV-W FlXTUFE
SUPPLV DIFFUSER
� FECESSED CAN LIGHT
EMERGENCVEGRESS
LIGHT � SPEAKER
GENERAL CEILING PLAN NOTES
1. REMOVEEXISTINGSWITCHESTHATARENOTREUSED.
REMOVE CON�UIT AND W IRING BACK TO NEAREST BASE
BUILDING JUNCTION BOX. PATCH AND REPAIR WALL FOR
NEW RNISH.
2. THEGENERALCONTRACTORANOTHEELECTRICAL
CONTRACTOR SHALL VERIFV ALL CEILING HEIGHTS AND
CEILING PLENUM CONDITIONS FOR CLEARANCE OF
DUCTWORK LIGHTING. AND OTHER OBSTRUCTIONS TO
ASSURE THE RNISHED CEILING HEIGHT INDICATED. ANV
DISCREPANCV SHALL eE BROUGHTTOTHE DESIGNER'S
ATTENTION PRIOR TO PERFORMING ANV WORK.
3. CEILINGHEIGHTTHROUGHOUTTHESPACEIS "AEE.
UNLESS NOTE� OTHERWISE.
0. EXISTMGCEILINGGRIDANDACOUSTICALTILETOREMAIN,
UNLESS NOTEO OTHERW ISE. CONTRACTOR TO REMOVE
AND REPLACE ANV EXISTING CEILING TILES AND CEILING
GRI� THAT IS BROKEN. CHIPPED, OR PUNCTURE� WITH
NEW TO MATCH E%ISTING.
5. ALL NEW SWITCHES FOR LIGHTING SHALL BE LOCATED AS
SHOWN ON PLANS. MOUNT CENTER OF SWITCH 6"-9" FROM
EDGE OF DOOR FRAME, UNLE55 NOTEO OTHERWISE.
MOUNT 48" AF.R TO CENTER OF DEVICE.
6 EXIT SIGNS, DOWN LIGHTS. SPRMKLER HEADS, ETC. SHALL
BE CENTERE� W ITHIN TILE, UNLE55 NOTED OTHERW ISE.
7. COLOROFLIGHTSWITCHDEVICESANDCOVERPLATETO
BE BUILDING STANDARD, UNLESS NOTED OTHEFWISE.
6. ALLMl1LTIPLESWITGHLOGATIONSTOBEGROUPED
TOGETHER AND LABELED WITH A SINGLE DEVICE
COVERPLATE.
9. REFER TO ENGWEERMG �OCUMENTS FOR INFORMATION,
LOCATION AND SPECIFlCATIONS ON EXIT SIGNAGE, LIFE
SAFETV SVSTEMS, 24 EMERGENCY LIGHTING,
VENTILATIONS. HVAC SVSTEMS. GIRCUITING OF LIGHTS AN�
THERMOSTAT LOCATION ETC.
10. THERMOSTATSSHALLBELOCATEDDIRECTLVABOVEOR
ADJACENT TO LIGHT SW ITCH. ALL THERMOSTAT POSITIONS
AND LOCATIONS TO BE COORDINATED W ITH THE DESIGNER
BEFORE PLACEMENT.
11. SUPPLV AND RETUFN AIF GRILLES ARE TO BE RUSH W ITH
NEW CEILING TILES ANO ARE TO BE BLACK IN COLOR.
REFER TO ENGWEERING DOCUMENTS FOR ADDITIONAL
W FORMATION.
12 ALLDIMENSIONSARETOTHECENTERLINEOFFI%TURE.
UNLESS NOTE� OTHERWISE.
13. IF REpUIRED. ALL CEILING MOUNTED EQUIPMENT
LOCATIONS TO BE COORDINATED W ITH THE DESIGNEF
PFIOR TOINSTALLATION.
14. IF PRESENT, VERIFV ALL SPRINKLER HEAD LOCATIONS.
NOTIFV DESIGNEF IF ANV OISCREPANCIES OCGUR.
15. PROVIDE FIRE OAMPERS AT FlRERATED PARTITIONS AS
REQUIRE� PEF APPLICABLE BUIL�ING CODES.
16. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL DUCTWORK, SUPPLV AND RETURN AIR AND
THEFMOSTATS. COOF�INATE ALL ELEMENTS OF THE HVAC
SVSTEM TO PROVIOE A COMPLETELV BALANCED AN�
EFFlCIENT HEATING AND COOLING SVSTEM.
1Z HVAC THERMOSTAT CONTROL FOR ALL ROOMS SHALL BE
�ocarEo wirHiN oEMisEo suirE. vERiFv allo aEwoRK
EXISTING OUCTWORKANO THERMOSTATS AS REpUIRED.
18. MECHANICALCONTRACTORSHALLVERIFVWOFKING
CONOITION OFALL EXITING THERMOSTATS, VAV BOXES,
E%HAUST FANS. AN� ANV OTHER DEVICE OIRECTLV
RELATED TO THE HVAC SVSTEM. CONTRACTOR TO NOTIFV
ENGWEER/�ESIGNER IMMEDIATELV UPON DISCOVERV OF
oEFEcrivE oEvicE.
LIGHT FIXTURE LEGEND
F1 2X4 LAV-W RXTURE, DALUME
RETROFIT EVOKIT OR EQUAL,
350�K LED
F2 2X2 LAV-IN FIXTURE, DAWME
RETROFIT EVOKIT OR EQUAL,
350�K LED
F3 RECESSED LIGHTING, 61N
RECESSED LED CAN 3500K
F4 SURFACE MOUNT 4"xA' LED, 3500K
DAWME OR EOUAL
F5 HUBBELL MODEL NO. CU2RC OR
EQUAL,EMERGENCYEGRESS
LIGHTS W ITH BATTERV BACKUP.
F6 E�GE LIT RED LE0.. LITHONIAOR
EQUAL
� PROGRESS � STUDIO
PROGRESS STU�IQ LLC
5915 N. College Ave., Suite 213
Intlianapalis. IN 46220
31]-9]B-1100
www.ihepwgressslutlio.com
IN ASSOCIATION W ITH
niiH�y-mHdsarva� noo.nounswm��nw.mavne,w���ao,
:mmi�+m� o.nra�ymea�:.e moa,izi�emg
oec ymm
��� ��,Ko,me�a
prvoio�v��a,� omoa,orova�vimormeno�rein�:vnem,w wima
onolPecopppM1iownei. Am/unau�M1wlva]uxerswlllCepmsem�e0�o
�na n�uesieaam oi meiAw ���a�ei�e e�vi�aai i� m���ree er me�oayneni W,��-
PFEPAREDFOR
PVA Wealth Advisors
3850 Priority Way S. Drive, Suite 118
Indianapolis, IN 46240
PFOJECT
PVA Wealth
Advisors Renovation
2900 East 96th Street
Indianapolis, IN 46240
CERTIFICATION
: AR11700002 `.
��'. STATE OF :'
rT �NP I ANP,7,�
NO. �ATE DESCRIPTION
— 01i29,�2020 CONSTFUCTION PLANS
DRAWNBV: TL
REVIEWEDBV: JL
PROJECTNUMBER 20004
SHEET TITLE
FIRST FLOOR DEMOLITION RCP PLAN
va„ = i._o„
RELEA5E0 FOR CONSTRIICTI�N
Su6jec� �o compliance with all regula�ions
of S�a�e antl Local Codes
City of Carmel
`�v�:����i l�rcvalM.��
DATE: 02�Z5�2O
Q�j ;1 BASEMENT DEMOLITION PLAN
�J ,ia„_,,_o„
DEMO REFLECTED
CEILING PLANS
SHEETNUMBER
A201