HomeMy WebLinkAboutS1 - Construction Struct Plan R20202011Approximate location of
existing drop beam under
existing deck is 24" inset
from edge.
5. Electrical installed per IN NEC.
1. Code clarification notes
per Carmel (11 FEB 20)
02/18/20
Mike Sheeks