HomeMy WebLinkAboutC200 OVERALL SITE PLANFUTURE MIXED USEFFE = ±860.50ANTICPATED 6 STORIES30,000 SQ. FT. FOOTPRINT156,000 SQ. FT. TOTALBUILDING A
FFE = 862.00
BUILDING B
FFE = 862.00
BUILDING D WITH
PARKING
FFE = 862.00BUILDING CFFE = 862.40FUTURE MIXED USEFUTURE MIXED USEFFE = ±860.00ANTICIPATED6 STORIES, 29,000SQ. FT.FOOTPRINT156,000 SQ. FTTOTALFUTURE MIXED USEFFE = ±860.50ANTICIPATED 6 STORIES29,000 SQ. FT. FOOTPRINT421,500 SQ. FT. TOTALW. CARMEL DRIVE(PRIMARY ARTERIAL - 120' ROW)N. PENNSYLVANIA STREET
(ARTERIAL - 100' ROW)
U.S.31U.S.31
N. PENNSYLVANIA STREET
(ARTERIAL - 100' ROW)
10
15
20
11 12 13 14 16
17
18
1910
1112131011121310111213LINE BLINE CLINE DLINE ALINE A
L13
L14
L15
L16L17L18Line Table: Alignments
Line #
L13
L14
L15
L16
L17
L18
Length
111.23
375.00
549.04
350.00
350.00
350.00
Direction
N0° 00' 09.28"E
N5° 03' 48.14"E
N1° 15' 28.51"W
S89° 59' 26.02"E
N90° 00' 00.00"E
N90° 00' 00.00"E
Start Point
(E=20008.06,N=20831.39)
(E=19974.18,N=20440.21)
(E=19985.51,N=19869.26)
(E=19987.39,N=20589.22)
(E=19977.20,N=20247.60)
(E=19984.41,N=19919.26)
End Point
(E=20008.07,N=20942.61)
(E=20007.28,N=20813.75)
(E=19973.45,N=20418.16)
(E=20337.39,N=20589.16)
(E=20327.20,N=20247.60)
(E=20334.41,N=19919.26)
Alignment
LINE A
LINE A
LINE A
LINE B
LINE C
LINE D
C1
C2
Curve Table: Alignments
Curve #
C1
C2
Radius
200.00
200.00
Length
22.07
17.67
Chord Direction
N1° 54' 09.82"E
N2° 31' 58.69"E
Start Point
E=(19973.45,N=20418.16)
E=(20007.28,N=20813.75)
End Point
E=(19974.18,N=20440.21)
E=(20008.06,N=20831.39)
Alignment
LINE A
LINE AN90°00'00"E - 284.09'N00°00'00"EN90°00'00"E27.99'N00°00'00"E - 245.29'
N00°03'57"W - 1186.40'N00°03'57"W - 1186.40'N84°51'18"W - 111.36'S89°59'30"W - 389.21'N24°1
9'
0
8
"
W
5
5
.
2
7'
N11°28'38
"
W
-
7
6
.
4
9
'
S00°10'07"E58.76'S00°07'31"E - 695.72'S00°07'31"E - 695.72'
46.53'S88°46'31"W - 226.41'S88°46'31"W - 228.07'S00°07'31"E
155.34'
N2
9
°
1
1
'
3
0
"
E
42
.
9
1
'
KRG Hamilton Crossing, LLC
Inst. No. 2004-59877
KRG Hamilton Crossing, LLC
Inst. No. 2004-59877North Meridian Carmel Hotel, L.P.Inst. No. 2004-27998KRG Hamilton Crossing, LLC
Inst. No. 2004-59877DRAIN EasementInst. No. 2001-5902PARKing Easement Area "A"
Inst. No. 2001-5902
PARKing Easement Area "B"
Inst. No. 2001-5902
DRAIN EasementInst. No. 2001-5902DRAIN EasementInst. No. 2001-5902DRAIN EasementInst. No. 2001-5902DRAIN EASEMENTINST. NO. 2001-590245'Half R/WNE Corner, NW 14Sec. 35, T18N, R3E,2nd PMHarrison Monument FoundState of IndianaInst. No. 201502646287.3'Southern Boundary of 110 Acre Parceldescribed in the Real Estate Covenantrecorded in Misc. Rec. 166, Page 545State
o
f I
n
di
a
n
a
Inst. N
o
.
2
0
1
9
0
1
7
8
6
5P.O.B.HOTEL PARCELREBAR W/SCHNEIDERCAP FOUNDUtility
Easement
Inst. No.
99-72494
Utility
Easement
Inst.
No.
99-29602
DRAIN Easement
Inst. No. 2007070119
Lease Access
Road Easement
Inst. No. 2001-5902
Utility Easement
Bk 269, Pg 267 Utility Easement
Inst. No. 99-72494
& Inst. No. 99-29602
Access Drive
Inst. No. 2001-5902
Inst. No. 2004-27997
Utility Easement No. 99-72494
Utility Easement
BK 271, Pg 383
Utility Easement
Inst. No. 99-72494
& Inst. No. 99-29602
Water Line Easement
Bk 270, Pg 328
Inst. No. 85-359
Utility Easement
Bk 270, Pg 181
& Bk 279, Pg 396
PERPETUAL DRAIN EASEMENT
INST. NO. 2015026462
DRAIN Easement
Inst. No. 2001-5902
Sign subject to
"Consent to Encroach"
Inst. No. 2014-49087
Utility Easement
Bk. 244, Pg 141
ONLYONLYONLYONLYDesigned By:Checked By:
Drawing No.:
Issue Date:
Designed By:Drawn By:
Project No:Scale:
.02/16/2020
GAB KDR GAB
AS SHOWN
www.chacompanies.com
Union Station, 300 S. Meridian St.
Main: (317) 786-0461
Indianapolis, IN 46225HAMILTON CROSSINGREDEVELOPMENTByDateSubmittal / RevisionApp'd.No.REALTY GROUP
30 S. MERIDIAN STREET SUITE 1100
INDIANAPOLIS, IN 46204
PHONE 317-577-5600
FAX 317-577-5605 OVERALL SITE PLANC200N0
GRAPHIC SCALE (FEET)
25 50 100
EXISTING LEGEND
AIR CONDITIONER
BUSH
CLEAN OUT
CURB INLET
DRAINAGE INLET
DRAINAGE MH
ELECTRIC BOX
ELECTRIC METER BOX
ELECTRIC PEDESTAL
FIRE HYDRANT
FIRE PLUG
FIRE VALVE SHUT OFF
FLAG
FLAG POLE
GAS METER
GUARD POST
ADA PARKING
HOSE BIB
LIGHT POLE
MAIL BOX
MANHOLE
PINE TREE
RIGHT OF WAY MARKER
POST
FINISHED FLOOR ELEVATION
BURIED ELECTRIC LINE
BURIED GAS LINE
BURIED WATER LINE
OVERHEAD TRAFFIC LINE
BURIED COMMUNICATIONS LINE
BURIED FIBER OPTIC LINE
BURIED TELEPHONE LINE
YARD LIGHT
WATER VALVE SHUT OFF
WATER VALVE
WATER METER
TREE
TRANSFORMER
TRAFFIC POLE
TRAFFIC MH
TEMPORARY BENCH MARK
TELEPHONE PEDESTAL
TELEPHONE HANDHOLE
TELEPHONE CROSS BOX
STUMP
SPRINKLER CONTROL VALVE
SANITARY MH
SIGN
TOTAL PROJECT ACREAGE = ±14.29 ACRES, PROJECT ZONING: C2, TOTAL
PHASE I IMPERVIOUS AREA = ±6.75 ACRES, LOT COVERAGE = 47%
PHASE I BUILDINGS:
BUILDING A:
6 STORY BUILDING, 48,500 SQ. FT. FOOTPRINT
205,000 SQ. FT (TOTAL)
BUILDING B:
2 STORY BULIDING, 22,000 SQ. FT. FOOTPRINT
26,000 SQ. FT. TOTAL
BUILDING C:
5 STORY BUILDING, 32,000 SQ. FT FOOTPRINT
EXISTING BUILDING = ±63,500 SQ.FT. (TOTAL)
PROPOSED BUILDING = 96,000 SQ.FT. (TOTAL)
BUILDING D WITH PARKING:
6 STORY BUILDING, 63,500 SQ. FT. FOOTPRINT
421,500 SQ. FT. TOTAL
PHASE I PARKING:
SURFACE PARKING = 81 SPACES
GARAGE PARKING = 850 SPACES
PENNSYLVANIA STREET = 21 SPACES
TOTAL PROPOSED PARKING = ±952 SPACES
SITE DATA TABLE
SITE LEGEND
NEW HEAVY DUTY ASPHALT PAVEMENT
CONCRETE SIDE WALK/HARDSCAPE
COORDINATE WITH ARCHITECTURAL
PLANS
ASPHALT PAVEMENT PER CARMEL
ARTERIAL SECTION
PARKING SPACE COUNT
PROPOSED LIGHT POLE
GENERAL NOTES
1.CONTRACTOR SHALL PROTECT ALL EXISTING MONUMENT MARKERS
2.LOCATIONS OF ALL UTILITIES ARE BASED ON ABOVE GROUND
EVIDENCE. CONTRACTOR TO FIELD VERIFY LOCATION AND DEPTH,
NOTIFY ENGINEER IF VARIATION EXISTS.