Loading...
HomeMy WebLinkAboutAnnual Report Letter 02-28-20 AkMartin Marietta February 28, 2020 Mr. Mike Hollibaugh Director, Department of Community Services City of Carmel, City Hall One Civic Square Carmel, Indiana 46032 RE: Annual Report Letter Dear Mr. Hollibaugh: The following items are included with the submission of our annual report: • An updated aerial photograph to serve as a mining progress report map. Mueller Property South - 04040024SU, 05090003SU, 08030032SU, 05090003SU • Mining activity on Mueller South consisted of 227,077 tons (122,933 limestone and 104,144 sand), which was used as raw material feed. • The Blue Woods Creek relocation is working as designed and is being monitored by State and local agencies. The Corps of Engineers released the project from additional mitigation monitoring in October 2015. • The North Indianapolis site continues to employ a contractor to provide street sweeping at least twice daily in and around the entrance area of the 96th Street site. When sales volumes increase during the busy construction season Martin Marietta increases sweeping to four times per day, and more as conditions warrant. The plant purchased a rotary broom sweeper to maintain in-plant roadways. Additional sweeping was added along Gray Rd. on an as needed basis. A wheel wash was constructed during November 2018 and began operation in spring of 2019. • The caution signals installed along 106th Street to provide additional safety during times of transporting material from the Mueller South property are functioning and inspected once a month. • The blasting program at North Indianapolis has been continuously refined through a cooperative effort with Vibra-Tech, Austin Powder, and Martin Marietta. Changes in blast sequencing, increased burden on the front row holes, and smaller shot sizes are all part of the effort to minimize blasting noise and neighbor disturbance. Underground blasting has moved to the South on Martin Marietta property. The surface mine is progressing North on Martin Marietta property and Mueller South Limestone. • A gate and landscaping was installed on the Mueller South property during April 2010. The gate was installed on the 106th Street entrance to prevent motorists from accessing Blue Woods Creek. Trees and boulders were installed to improve the aesthetics of the entrance and to prevent the public from driving around the newly installed gate. Indiana District Office 12220 North Meridian Street, Suite 100, Carmel, IN 46032 t. (317) 573-4460 f. (317)573-5975 www.martinmarietta.com Page February 28, 2020 Mueller Property North - 05010021SU • Mining activity on Mueller North consisted of 422,853 tons, which was used as raw material feed. • The Carmel Sand Plant primarily operated five 10 hour production shifts Monday through Friday and 6 hour production shifts on Saturday during 2019. A seasonal shutdown occurred between January 1 and February 15, 2019. • Customer service hours were 7am to 4:30pm Monday through Friday and 8am to 12pm on Saturday during the loading season. • Mine progression on Mueller Property North has resumed adjacent to the Kingswood neighborhood. • The berm located near the Northern part of the property was relocated and seeded in 2013. No additional seeding was needed from 2015 through 2019. • Martin Marietta and Kingswood HOA representatives met to discuss the issues and concerns of the Kingswood neighbors on February 27th, 2019. The discussions were productive, and strengthened the communication channels and understanding between all parties. The relationship between Kingswood and Martin Marietta remains open and positive. Mueller Property South & Mueller Property North • Groundwater and surface water monitoring have been ongoing on the Mueller properties since 2003 based on the monitoring plan prepared by Aqua Fusion. Quarterly reports summarizing water elevations and annual reports summarizing both water elevations and water quality sampling results are submitted to the Mr. John Duffy. Currently 13 wells, four groundwater sources (three lakes and Blue Woods Creek) are monitored. • Updates to the Spill Prevention Control and Countermeasures Plans for the North Indianapolis and Carmel Sand operations were submitted to the agencies designated in the Commitments on February 28, 2020 If you require additional information feel free to contact me at 317-575-5711. Sincerely, /..14„, Ed Gehr VP-Gen Mgr - IN District 'se��e ‘ Ia��eseae� . . ii)ot a' r• '-''' i. - _ MN tom i'-I,, bt A_. e s �t t I. , r . ,y .� i r '''4 4 11.04,41",,e, le 4 / 1 t ' et/ i . . $ r ' , - I iptio , OiriS: . ' /, - '1= / .7 441110 '/ ie. it l' 4 'A.4 'I lit 4, tt 1 wo...s ,... I� t '+ ;;Ti ,' . . a la,s, i`� . , .., ti=sr , ,�. , *�fiyi4e 41 t. •• . . . ,_, , , .. ,...... 1, - , ..... ,, 4T. ..... • .,:i , „.,,, ‘ .eir • ,r. !.' b • . , , _.... ` V. i ',,ti4.:,l a+r? .tom :,j . .; . ' t . 07° Oh At . • e.. lik _ , i fiNrit, I: , tit ilf e. i . ) r I 1 ' W.•00.14_ • . sdi ,. ;I. , ./. - . " Er1a 4 �r + r b `= g s :' Flight Date 09 18 19 x . „ %A-Ng. „:. ' 7 .: Iiiill am I rr� ,� SCASE� ® Mueller South and North Aerial Marietta ,,,—.