Loading...
HomeMy WebLinkAboutLD100 - TREE PROTECTION AND REMOVAL PLANGG G GGG GG G G G G G G GGGG GGG G G G G G G G G G G G G G G G G G G G G GGG G GGG G G G G GW WWW W W W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W WOHU OHUOHU OHU OHUOHUOHU OHU OHU W WW W W W W W W WW WW W W W W WWOHU OHUOHUOHUOHUOHU OHU OHUOHUOHU OHU OHU OHU OHUOHU OHU OHUOHUOHU OHU OHUOHU OHU OHU OHU OHU OHU OHU OHUOHU OHUOHUOHU OHU OHU OHUOHUB C C D E F G H I A J C C D 0 Scale 1" = 100'-0" 200'100' 50' North 1. For more detail on tree protection and fencing refer to specifications. 2. Tree Protection Fencing locations are fixed. Install exactly where shown on these plans. Any adjustments to fencing locations must be approved by the Owner. Damages will be assessed if tree protection fence location is adjusted without Owner approval. Fence deviation from this plan or approved change will be corrected by the General Contractor prior to the start of construction. 3. All tree pruning and limb restraint will be performed under the direct supervision of a Certified Arborist. Contractor shall not prune trees or restrain limbs. 4. No staging, equipment, material storage, or vehicles are allowed on non-paved areas unless indicated otherwise on plan. 5. Abandon all utilities to be removed when located within a Protected Root Zone. 6. Backfill all depressed and void areas with top soil following removal of vegetation. Soil shall be free of debris. Compact soils to ensure settling and sedimentation do not occur. 7. Owner is responsible for transplanting identified trees, as noted. Coordinate with Owner if trees to be transplanted remain on site when mobilization begins. 8. Cleanly cut all roots encountered during construction. Contractor to Air-knife all roots around trees around all indicated as being essential to the campus landscape vocabulary and any tree over 18" in diameter. 9. Coordinate locations of Tree Protection Fencing and Construction Fencing prior to the start of construction activities. In areas where Tree Protection and Construction Fences overlap, the Contractor may elect to install the more restrictive fence type of the two provided that the single fence accommodates the requirements of both fences. 10. Trimming of existing trees shall occur no later than March 15th. All tree trimming shall be under the direct supervision of a certified arborist. 11. If construction fencing limits access to tree area then tree protection fencing is not necessary. TREE PROTECTION GENERAL NOTES TREE PRESERVATION LEGEND Wooded Area to be Protected Trees to be Removed Tree Protection Fence Locations - To be installed PRIOR TO DEMOLITION Tree Protection Fence Refer to detail this sheet. Tree Protection Fence Refer to detail this sheet. TREE PRESERVATION CHART SYMBOL WOODED AREA LOCATION TREATMENT A North Tree Line REFER TO LD101 B North East REMOVE C North East Propertyline SAVE D South East Grouping SAVE E South Center Single Tree SAVE F South Central Grouping SAVE G South Central/ West Grouping SAVE H South West SAVE I South West REMOVE J South West REMOVE 1 NOT TO SCALE TREE PROTECTION FENCING Remove trees tagged by Landscape Architect. Refer to LD101 for detail. 8/27/2019 Daren Mindham 02/27/20