HomeMy WebLinkAboutC200 - OVERALL SITE PLANFHVTS&V
T 4"6"DOMFIREP W6"
85' WIDE EMERGENCY
SPILLWAY
W/ RIP RAP
REVETMENT COVER
DRAINAGE ESMT20'W BMP ACCESS ESMT
20
'
W
B
M
P
AC
C
E
S
S
ES
M
T
25'
W SA
N
S
W
R
ES
M
T
25'W SAN SWR ESMT
25'W SAN SWR ESMT 25'W SAN
SW
R
ES
M
T
30'W DRAINAGE ESMTWW W
W
WM PROPOSED ROWPROPOSED ROWWOUTDOOR
MECHANICAL YARD
20' BMP ACCESS
EASEMENT6''SSD6''SSD6''SSDINV = 863.2 (6"SSD)INV = 864.2 (6"SSD)
8" HDPE 8" HDPE
8" HDPE
INV = 860.8
8" HDPE
8" HDPE
8" HDPE
8" HDPE
8" HDPE
8" HDPE
8" HDPE
246 LF OF
8" HDPE
8" HDPE
12" HDPE
8" HDPE
5 LF OF 10" HDPE
5 LF OF 10" HDPE
20'W ELEC ESMT
10'W GAS ESMT
20'W WATER ESMT
20'W SAN SWR ESMT 8" HDPE
8" HDPE 20'W SAN SWR ESMTWETLANDS
(PROTECT)
5 LF OF 10" HDPE
5 LF OF 10" HDPE
5 LF OF 10" HDPE
5 LF OF 10" HDPE
SILVARA COURTDOMI
N
O DRIV
E
CLAY CENTER ROADN89°33'54"E 497.18'N00°23'36"E 1277.20'S44°59'34"E 926.14'S00°27'00"W 754.36'PARCEL 2
CARMEL CLAY
SCHOOLS
INST. #2016063314
15.01 ACRES N00°27'00"E 765.33'S89°38'07"W 456.04'N00°27'00"E 645.35'S00°27'00"W 519.35'S00°27'00"W 765.33'N89°38'07"E 456.04'PARCEL 1
CARMEL CLAY
SCHOOLS
INST. #2014001578
20.00 ACRES GROSS
WET POND
WITH
NATIVE BANKS Xref .\drawings in\context\2019-09-23\xref\cc-floor plan.dwgNO PARKINGNO P A RK ING
NO PA RKI N GNO PARKING25' SETBACK
25' SETBACK
25' SETBACK
15' SETBACK40' SETBACK25' SETBACK15' SETBACK45' HALF ROW40' SETBACK 111,802 SF
BLDG
ELEC SVC
GAS SVC
WATER METER IN BLDG
5'
MIN
BIKE PARKING
HVAC ON
BLDG TOP
CURBED PARKING LOT (TYP)
EMPLOYEES: 80
CLASSROOMS: 32
MAX STUDENTS: 750
REQUIRED PARKING: 144
PROVIDED PARKING: 148
REQUIRED ADA PARKING: 5
PROVIDED ADA PARKING: 5
BUS PARKING PROVIDED: 17
ANTICIPATE BUSSES: 14
18095
Project Number:
Drawing Number:
Certified By:
Checked ByDrawn ByIssue Date
Revisions:PROJECT:Scope Drawings:CARMEL, INDIANANEWFORCARMEL CLAY SCHOOLSCARMEL ELEMENTARY SCHOOLSDrawing Title:
06-21-19 SO MK
Rev. #Revision
Description
Issue
Date
1 ADDENDUM 7/9/2019
3 ASI #1 8/28/2019
C200
OVERALL
SITE PLAN
SCALE: 1" = 100'
PROJECT INFORMATION
NOTE:
SEE C500 SHEETS FOR DETAILED
UTILITY / UTILITIES INFORMATION.
THIS SHEET IS FOR INFORMATION
ONLY. SEE SHEETS L100-L106 FOR
SITE MATERIAL PLANS &
DIMENSIONS.
2 TAC COMMENTS 8/12/2019
4
4 ASI #2 9/20/2019
4
02/27/20