Loading...
HomeMy WebLinkAboutC403 - SWPP PLAN (FINAL)FFE = 868.50 FFE = 868.50 T HW 100: 855.9 NORMAL: 851.0 85' WIDE EMERGENCY SPILLWAY W/ RIP RAP REVETMENT COVER DRAINAGE & BMP ESMT855.6 855.1 20'W BMP ACCESS ESMT 20 ' W B M P AC C E S S ES M T 25 ' W SA N S W R ES M T 25'W SAN SWR ESMT 25'W SAN SWR ESMT 25' W SA N SW R ES M T 30'W DRAINAGE ESMTPROPOSED ROWPROPOSED ROW 20' BMP ACCESS EASEMENT C.O. C.O. C.O. C.O. C.O. C.O. C.O.C.O. C.O. C.O. C.O. C.O. C.O. 20'W ELEC ESMT 10'W GAS ESMT 20'W WATER ESMT 20'W SAN SWR ESMT 20'W SAN SWR ESMTWETLANDS (PROTECT)SILVARA COURTDOMI N O DRIV E CLAY CENTER ROADN00°23'36"E 1277.20'NO PARKINGNO P A RK IN G NO PA R K IN GNO PARKINGPLAYGROUND AREA REFER TO L212 NPDES POSTING BOARD SEE LANDSCAPE PLANS FOR SEED, SOD, AND OTHER STABILIZATION OR GROUND COVER IN BALL DIAMONDS. SEE LANDSCAPE PLANS FOR SEEDING, SODDING AND LANDSCAPING IN PARKING LOT ISLANDS APPLY NATIVE SEED AND PLANT PLUGS W/ EROSION CONTROL BLANKET ON POND BANKS BETWEEN ELEVATIONS 850.0 AND ELEV 853 (2' VERTICALLY ABOVE TOP OF 10 FT. SHELF) INSTALL RIP- RAP PER SHEET C405 AT ALL POND INLETS/OUTLETS BMP #1 AQUASWIRL FILTER AS-10 BMP #2 WET POND WITH NATIVE BANKS (SEE L401 & L410) PROVIDE GRAVEL BAG WEIR AROUND TRENCH DRAIN SEE LANDSCAPE PLANS FOR SEEDING, SODDING AND LANDSCAPING AROUND BUILDINGS "DO NOT MOW" SIGN = 6 TOTAL 7 7 WETLANDS (PROTECT) WETLANDS (PROTECT) 18095 Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANANEWFORCARMEL CLAY SCHOOLSCARMEL ELEMENTARY SCHOOLSDrawing Title: 06-21-19 SO MK Rev. #Revision Description Issue Date 1 ADDENDUM 7/9/2019 3 ASI #1 8/28/2019 LINE TYPE / SYMBOL EROSION CONTROL LEGEND LINE TYPE / SYMBOL DESCRIPTION DESCRIPTION SCALE: 1" = 100' THERE SHALL BE NO DIRT, DEBRIS, OR STORAGE OF MATERIAL IN THE STREET ADJACENT ROADS MUST BE SWEPT DAILY 1. REPAIR , REPLACE, AND MAINTAIN ALL SILT FENCE, CHECK DAMS OR INLET PROTECTION DAMAGED DURING EARTHWORK OR CONSTRUCTION ACTIVITIES. 2. DESIGNATE THE PERSON RESPONSIBLE FOR COMPLYING WITH THE ON-SITE SWPPP INSPECTIONS UNTIL ALL DISTURBED AREAS ON SITE SITE HAVE REACHED 70 PERCENT VEGETATIVE COVER DENSITY. 3. IF WORK OR CONSTRUCTION HAS STOPPED FOR 2 WEEKS OR MORE BEFORE PERMANENT SEED IS APPLIED, INSTALL TEMPORARY SEED AND MULCH AS DESCRIBED ON SHEET C405. COORDINATE RESPONSIBILITY FOR COMPLETING THE SITE REVIEW AFTER EACH 1 2" RAINFALL AND A MINIMUM OF ONE TIME A WEEK. 4. DETENTION BASIN SHALL BE USED AS SEDIMENT BASIN DURING CONSTRUCTION. COLLECTED SEDIMENT SHALL BE REMOVED WHEN IT REACHES DEPTHS OF 1.6 FEET (ELEVATION . DETENTION BASIN BOTTOM HAS BEEN SHALL BE OVER EXCAVATED 2.0 FEET TO ACCOMMODATE SEDIMENT (OVER EXCAVATE TO ELEVATION 851.0) . AT COMPLETION OF CONSTRUCTION CONTRACTOR SHALL REMOVE/EXCAVATE ALL SEDIMENT TO REACH A FINAL POND BOTTOM OF 853.00. 5. THIS SITE DRAINS TO ONE AQUASWIRL STRUCTURE THEN ON TO A WET POND DETENTION SYSTEM. BOTH THE AQUASWIRL STRUCTURE AND DETENTION POND SHALL BE INSPECTED MONTHLY THROUGHOUT THE PROJECT CONSTRUCTION. ALL VISIBLE SEDIMENT, IF PRESENT, SHALL BE REMOVED BY VACUUM TRUCK (AQUASWIRL STRUCTURE) OR EXCAVATOR (DETENTION POND) IF SEDIMENT LEVELS REACH LEVELS IDENTIFIED IN THE POST CONSTRUCTION OPERTATION AND MAINTENANCE MANUAL. 6. PREPARE ALL SEEDBEDS AND LANDSCAPING BEDS PER PLANS AND SPECIFICATIONS WHEN CONSTRUCTION IS COMPLETE ENOUGH FOR FINAL STABILIZATION. 7. PLACE PERMANENT SEEDING AND MULCH OR EROSION CONTROL BLANKET WITHIN 30 HOURS OF SEEDBED PREPARATION. INSTALL EROSION CONTROL BLANKETS INDICATED ON PLANS. 8. FINAL STABILIZATION IS CONSIDERED COMPLETE WHEN ALL LAND DISTURBING ACTIVITIES HAVE BEEN COMPLETED AND A UNIFORM VEGETATED SURFACE WITH 70% DENSITY IS ACHIEVED ON ALL DISTURBED/DENUDED AREAS AND AREAS NOT HAVING A PERMANENT STRUCTURE. THE CONTRACTOR SHALL OVER-SEED AS REQUIRED TO OBTAIN 70 PERCENT VEGETATIVE DENSITY IF REQUIRED. 9. AFTER SITE HAS REACHED 70% VEGETATIVE COVER, CONTRACTOR SHALL REMOVE REMAINING TEMPORARY BMP STRUCTURES AND REPAIR AND RE-SEED ANY DISTURBED AREAS AS REQUIRED. 10. ONCE THE CONSTRUCTION ACTIVITY IS COMPLETED (BY RULE LANGUAGE, WHEN FINAL STABILIZATION HAS OCCURRED), A COMPLETED RULE 5 NOTICE OF TERMINATION (NOT) MUST BE SUBMITTED TO IDEM. FINAL POST CONSTRUCTION SEQUENCING NOTES INLET/OUTLET PROTECTION PERMANENT SEEDING WITH NORTH AMERICAN GREEN EROSION CONTROL BLANKET - SC150 BN. PERMANENT NATIVE EMERGENT SEEDING AND PLANT PLUGS WITH NORTH AMERICAN GREEN SC 150 BN EROSION CONTROL BLANKET. SEE SHEET L401 & L410. EROSION CONTROL NOTES 1. THE EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON THE DRAWINGS ARE CONSIDERED THE MINIMUM PRACTICES NECESSARY FOR COMPLIANCE WITH THE NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY AS IDENTIFIED UNDER SECTION 327-IAC-15-5 OF THE INDIANA ADMINISTRATIVE CODE. HOWEVER, SITE CONDITIONS, CONSTRUCTION METHODS, SEQUENCING OF WORK AND GENERAL PRACTICE MAY WARRANT VARIATION AND/OR ADDITIONS TO THE QUANTITIES, TYPES, AND LOCATIONS OF BMP MEASURES AS SHOWN. 2. UNLESS OTHERWISE SHOWN, TEMPORARY CONTROL MEASURES SHALL BE REMOVED UPON SATISFACTORY ESTABLISHMENT OF PERMANENT VEGETATION. 3. SEE SHEET C404-C405 FOR DETAILS AND SPECIFICATIONS REFERENCED ON THIS SHEET. 4. PERIMETER CONTROL MEASURES (I.E. SILT FENCE, DIVERSION DITCHES AND BERMS, TREE PROTECTION FENCING) SHALL BE INSTALLED PRIOR TO COMMENCING EARTHWORK ACTIVITIES. 5. IN ADDITION TO THE MAINTENANCE REQUIREMENTS IDENTIFIED FOR INDIVIDUAL MEASURES, ALL EROSION CONTROL MEASURES INSTALLED UNDER THIS PROJECT SHALL BE INSPECTED WEEKLY TO ENSURE THEY ARE FUNCTIONING PROPERLY. MEASURES FOUND TO BE DEFICIENT SHALL BE REPAIRED OR REPLACED IMMEDIATELY THEREAFTER. 6. THE CONTRACTOR SHALL MAINTAIN A STABLE CONSTRUCTION ENTRANCE AT ALL TIMES AND SHALL MAKE EFFORTS TO MINIMIZE THE ACCUMULATION OF SOIL, MUD AND DEBRIS ON ADJOINING ROADWAYS. 7. SYMBOLS FOR INLET PROTECTION MEASURES AND DITCH CHECKS ARE SHOWN LARGER THAN ACTUAL SIZE. 8. DISTURBED AREAS AND STOCKPILES THAT ARE TO REMAIN IDLE FOR MORE THAN 14 DAYS SHALL BE STABILIZED WITH TEMPORARY SEEDING. 9. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE INSPECTOR. 10. PORTABLE TOILETS SHALL BE ANCHORED TO THE GROUND TO PREVENT TIPPING AND SPILLS. PERMANENT SEEDING WITH MULCH NOTES: 1. ALL DISTURBED AREAS SHALL BE STABILIZED WITH SEED AND MULCH, SEED AND EROSION CONTROL BLANKET, PAVEMENT OR LANDSCAPE BEDS WHETHER INDICATED ON THESE PLANS OR NOT. 2. SEE LANDSCAPE PLANS FOR SPECIFIC STABILIZATION METHODS AND MATERIALS IN BALL DIAMONDS, PARKING LOT BEDS, AND AREAS AROUND THE BUILDING. 3. SEE LANDSCAPE PLANS FOR PLAYGROUND AREAS. 4. SEE LANDSCAPE PLAN L401 FOR NATIVE SEED AND PLAT PLUGS IN WET POND WITH NATIVE BANKS. C403 SWPP PLAN (FINAL) 2 TAC COMMENTS 8/12/2019 4 ASI #2 9/20/2019 7 ASI #6 12/03/2019 9 ASI #9 01/09/20209 9 9 9 9 9 02/27/20