HomeMy WebLinkAboutProject Scope__________________________________________________________________________________________________ Indiana Kitchen Company Page 5 of 6 EXHIBIT A DESCRIPTION OF WORK General: Daily clean up of jobsite Haul away of all construction materials Building Permits as required by City of Carmel All necessary taxes Deconstruction: Disconnect existing plumbing fixtures and appliances Tearout of existing cabinets and countertops Tearout of existing drywall on ceiling and walls as needed to accommodate new lighting/electrical plan Removal of wall between kitchen and dining room Tearout of existing flooring in kitchen, foyer, sunroom, bar, great room, computer room, and pool room Framing: Labor/materials to build temporary walls to allow for placement of new recessed LVL beam Install/supply new recessed LVL beam into attic between kitchen and dining room Engineering of beam to be done by structural engineer HVAC: Rough-in ductwork for venting of hood to exterior Electrical: Relocate existing receptacles for refrigerator, dishwasher, range, range hood, and microwave drawer Relocate existing can lights as needed in kitchen ceiling to accommodate new layout Relocate/install switches and receptacles as needed to accommodate new layout Install/supply LED undercabinet/in-cabinet lighting in specified areas Rough-in/install up to (2) new pendants above island (Pendant lights not included) Plumbing: Relocate water/drain lines for new location of sink base in island Relocate water line for new location of refrigerator Install new (2) kitchen sinks, (2) kitchen faucets, and (2) garbage disposal (Badger 5) Drywall/Painting: Hang and finish new drywall on ceiling and walls in kitchen as needed Patch, repair, and sand all necessary areas in kitchen to be ready for paint Paint newly installed shoe molding to closely match existing trim paint Labor/materials to repaint kitchen walls and ceiling with new paint color TBD Paint newly installed trim to match existing trim paint color Flooring/Tile: Install/supply new 3/8” plywood underlayment in new kitchen, foyer, sunroom, bar, great room, computer room, and pool room Install/supply new LVT tile in new kitchen, foyer, sunroom, bar, great room, computer room, and pool room Install/supply tile backsplash w/grout upon countertop installation (Standard Pattern) *Leveling of subfloor is not included in this estimate if needed* *Floor transition strips may need to be used to account for unlevel floor* __________________________________________________________________________________________________ Indiana Kitchen Company Page 6 of 6 Cabinetry/Trim: Install cabinets and cabinet hardware as detailed in drawing Install/supply new baseboard, casing, and shoe mold where required in kitchen Install/supply new quarter round in kitchen, foyer, sunroom, bar, great room, computer room, and pool room area after installation of flooring Materials Allowances Included in Estimate: IKC Custom Cabinetry: $24,295 Cabinet Hardware Allowance: $410 Countertops | Mont Rhapsody: $11,505 Flooring Allowance: $9,340 (Approx. 2,065 sq. ft @ $4.50 per sq. ft.) Tile Backsplash Allowance: $750 Sinks | Undermount SS Sink: $500 (2 @ $250 each) Kitchen Faucets: $600 (2 @ $300 each) Notes: -Does not include appliance or appliance installation -Does not include construction cleaning -Approx. construction time will be 8 weeks from start date