HomeMy WebLinkAboutProject Scope__________________________________________________________________________________________________
Indiana Kitchen Company Page 5 of 6
EXHIBIT A
DESCRIPTION OF WORK
General:
Daily clean up of jobsite
Haul away of all construction materials
Building Permits as required by City of Carmel
All necessary taxes
Deconstruction:
Disconnect existing plumbing fixtures and appliances
Tearout of existing cabinets and countertops
Tearout of existing drywall on ceiling and walls as needed to accommodate new lighting/electrical plan
Removal of wall between kitchen and dining room
Tearout of existing flooring in kitchen, foyer, sunroom, bar, great room, computer room, and pool room
Framing:
Labor/materials to build temporary walls to allow for placement of new recessed LVL beam
Install/supply new recessed LVL beam into attic between kitchen and dining room
Engineering of beam to be done by structural engineer
HVAC:
Rough-in ductwork for venting of hood to exterior
Electrical:
Relocate existing receptacles for refrigerator, dishwasher, range, range hood, and microwave drawer
Relocate existing can lights as needed in kitchen ceiling to accommodate new layout
Relocate/install switches and receptacles as needed to accommodate new layout
Install/supply LED undercabinet/in-cabinet lighting in specified areas
Rough-in/install up to (2) new pendants above island (Pendant lights not included)
Plumbing:
Relocate water/drain lines for new location of sink base in island
Relocate water line for new location of refrigerator
Install new (2) kitchen sinks, (2) kitchen faucets, and (2) garbage disposal (Badger 5)
Drywall/Painting:
Hang and finish new drywall on ceiling and walls in kitchen as needed
Patch, repair, and sand all necessary areas in kitchen to be ready for paint
Paint newly installed shoe molding to closely match existing trim paint
Labor/materials to repaint kitchen walls and ceiling with new paint color TBD
Paint newly installed trim to match existing trim paint color
Flooring/Tile:
Install/supply new 3/8” plywood underlayment in new kitchen, foyer, sunroom, bar, great room, computer room, and pool room
Install/supply new LVT tile in new kitchen, foyer, sunroom, bar, great room, computer room, and pool room
Install/supply tile backsplash w/grout upon countertop installation (Standard Pattern)
*Leveling of subfloor is not included in this estimate if needed*
*Floor transition strips may need to be used to account for unlevel floor*
__________________________________________________________________________________________________
Indiana Kitchen Company Page 6 of 6
Cabinetry/Trim:
Install cabinets and cabinet hardware as detailed in drawing
Install/supply new baseboard, casing, and shoe mold where required in kitchen
Install/supply new quarter round in kitchen, foyer, sunroom, bar, great room, computer room, and pool room area after installation
of flooring
Materials Allowances Included in Estimate:
IKC Custom Cabinetry: $24,295
Cabinet Hardware Allowance: $410
Countertops | Mont Rhapsody: $11,505
Flooring Allowance: $9,340 (Approx. 2,065 sq. ft @ $4.50 per sq. ft.)
Tile Backsplash Allowance: $750
Sinks | Undermount SS Sink: $500 (2 @ $250 each)
Kitchen Faucets: $600 (2 @ $300 each)
Notes:
-Does not include appliance or appliance installation
-Does not include construction cleaning
-Approx. construction time will be 8 weeks from start date