Loading...
HomeMy WebLinkAboutGN010.0FINAL #1 of 10 Date: 01.28.20 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.Lew ResidenceBathroom RemodelPaul & Wanda Lew40 Wildwood DriveCarmel, Indiana 46032Approved By: Date: Jennifer Norrington Project Developer jnorrington@caseindy.com 317.205.4398(c) G002 Megan Nagy Designer mnagy@caseindy.com GENERAL / CONSTRUCTION NOTES DDEEMMOOLLIITTIIOONN NNOOTTEESS EELLEECCTTRRIICC NNOOTTEESS F/I (1) ONE NEW GFCI OUTLET IN BATHROOM F/I (1) ONE NEW EXHAUST FAN ON NEW SWITCH F/I (1) ONE NEW VANITY LIGHT FIXTURE ON NEW DIMMER SWITCH F/I (1) ONE NEW WATERPROOF RECESSED CAN LIGHT CENTERED ON SHOWER AREA F/I (1) ONE NEW 6" RECESSED LED CAN LIGHT IN CLOSET ON NEW DIMMER SWITCH F/I (1) ONE NEW OUTLET IN CLOSET F/I (1) ONE NEW SWITCH IN BEDROOM CEILING MOUNT LIGHT F/I (1) ONE NEW OUTLET IN BEDROOM F/I (1) ONE NEW INTERCONNECTED SMOKE DETECTOR IN BEDROOM F/I NEW INTERCONNECTED SMOKE DETECTOR & CARBON MONOXIDE DETECTORS ON ALL FLOORS & SLEEPING AREAS AS REQUIRED PER 2018 IRC R315.2.2 & R314.2.2 F/I ARC FAULT CIRCUIT INTERRUPTERS ON ALL BRANCH CIRCUITS IN REMODELED ROOMS AS REQUIRED PER 2018 IRC E3902.16 SALVAGE DOOR HARDWARE FROM BEDROOM ENTRY DOOR & BEDROOM CLOSET SALVAGE CLOSET SHELVING SYSTEM FOR RE-INSTALLATION EXISTING BEDROOM CEILING MOUNT FIXTURE TO REMAIN;RELOCATE SWITCH ALL EXISTING WINDOWS TO REMAIN DEMO WALLS PER PLANS R/H BULKHEAD ABOVE SHOWER R/H PEDESTAL SINK, FAUCET & TOILET R/H MIRROR & ACCESSORIES R/H TRACK LIGHTING, EXHAUST FAN & SHOWER CAN LIGHT R/H ACRYLIC SHOWER SHOWER PAN, SHOWER TILE WALLS, SHOWER GLASS ENCLOSURE & PLUMBING FIXTURES R/H WALL COVERING IN BATHROOM R/H TILE FLOORING, UNDERLAYMENT & TILE BASE IN BATHROOM R/H EXISTING PLYWOOD SUBFLOOR WHERE PROPOSED SHOWER BASE WILL BE LOCATED R/H DOORS, CASING, JAMBS & HEADERS FOR BATHROOM ENTRY, BEDROOM ENTRY & BEDROOM CLOSET R/H CARPET, CARPET PAD & TACK STRIP IN BEDROOM & CLOSET R/H BOARDER WALL COVERING IN BEDROOM R/H BASE & SHOE AS NEEDED IN BEDROOM & FOYER FRAME NEW 2X4 WALLS PER PLANS FRAME NEW OPENINGS FOR NEW DOOR LOCATIONS; INSTALL POCKET DOOR FRAMING FOR NEW 36X80 SOLID CORE BATHROOM DOOR INSTALL NEW BLOCKING TO SIDES OF EXISTING FLOOR JOIST; INSTALL 3/4" PLYWOOD IN EACH BAY FRAME NEW NICHE IN SHOWER RELOCATE HVAC IN BEDROOM/BATH & FOYER DUE TO DESIGN MODIFICATIONS BLOCK FOR GRAB BARS; FIELD VERIFY HEIGHTS & FINAL LOCATIONS W/ H.O. DRYWALL NEW WALLS & CEILING; PATCH WALLS & TEXTURED CEILING TO MATCH EXISTING AS NEEDED RELOCATE SHOWER DRAIN FOR NEW LINEAR DRAIN RELOCATE PLUMBING FOR NEW SINK, FAUCET & TOILET LOCATIONS RELOCATE PLUMBING FOR NEW SHOWERHEAD, HANDHELD & TURN ON/OFF VALVE INSTALL NEW ZERO THRESHOLD SHOWER PAN & LINEAR DRAIN WITH 2X6 TILE INSTALL UNDERLAYMENT ON FLOOR TO BE FLUSH F/I NEW 12X24 SHOWER WALL TILE ON HORIZONTAL 1/3 BRICK LAY F/I NEW FURNITURE VANITY & CABINET HARDWARE F/I NEW UNDERMOUNT SINK, FAUCET & TOILET F/I NEW SHOWERHEAD, HANDHELD & TURN ON/OF VALVE F/I (1) ONE NEW SHOWER ROD F/I NEW VANITY QUARTZ CTOPS, BANJO CTOP 9" CORNER SHELF & NICHE CAP F/I NEW FRAMED MIRROR F/I NEW ACCESSORIES; CONFIRM FINAL LOCATION W/ H.O. F/I WINDOW FILM ON EXISTING WINDOW IN BATHROOM INSTALL SALVAGED CLOSET SHELVING F/I NEW PRE HUNG 6 PANEL DOORS & CASING FOR CLOSET & BEDROOM DOOR; INSTALL SALVAGED DOOR HARDWARE F/I (1) ONE NEW 36X80 SOLID CORE 6 PANEL POCKET DOOR, DOOR HARDWARE & CASING F/I NEW OAK FLOORING IN BEDROOM & CLOSET; STAIN TO MATCH EXISTING HARDWOOD FLOORS F/I NEW BASE & SHOE MOLDING IN BEDROOM & CLOSET; F/I BASE & SHOE MOLDING AS NEEDED IN FOYER DUE TO RELOCATION OF BEDROOM DOOR PAINT WALLS, CEILINGS, DOORS, TRIMS & ONE WINDOW IN BATHROOM PAINT WALLS, CEILINGS, DOORS, TRIMS & WINDOW CASINGS IN BEDROOM & CLOSET PAINT BASE MOLDING IN FOYER; STAIN SHOE MOLDING TO MATCH EXISTING FOYER'S SHOE MOLDING PPRROOPPOOSSEEDD NNOOTTEESS #2 02.17.20 03/04/20 Adam Schriner