HomeMy WebLinkAboutSPP010.1R.L.S. # LS20500017 DATE:
FOR: OLD TOWN DESIGN GROUP
BY: JD HALL LAND SURVEYING, IVOSB
803 S. OHIO STREET
SHERIDAN, INDIANA 46069
Ph: 317-696-3594
Fx: 317-758-5510
JOB NO: 17-006 (21) SHEET 2 OF 2
NOTE:
Erosion and sediment plan, for this lot, shall, at a minimum, includes the following measures and at all times follow the
guidelines for Individual residential lots and the previously approved SWPPP for CARMEL:
1) Install and maintain a stable construction site access at the location of the proposed drive.
2) Install and maintain an appropriate perimeter erosion and sediment control measures prior to land disturbance, ie silt
fence.
3) Minimize sediment discharge and tracking from the lot.
4) Clean-up sediment that is either tracked or washed onto roads. Bulk clearing of sediment shall not include flushing
the area with water. Cleared sediment must be redistributed or disposed of in a manner that is in compliance with all
applicable statutes and rules.
5) Adjacent lots disturbed by an individual lot operator must be repaired and stabilized with temporary or permanent
surface stabilization.
6) Self-monitoring program plan and procedures per the previous approved SWPPP shall be followed all individual lot
construction.
7) Additional erosion/sediment control measures may be required upon inspection by local planning authority.
8) I hereby certify that this individual lot plan is consistent with the storm water management permit, as approved by
CARMEL, for SUNRISE ON THE MONON.
SITE PLAN
LOT 21 SUNRISE ON THE MONON
CARMEL, INDIANA
1496 DAYLIGHT DRIVE
03/05/20
David Rutti