HomeMy WebLinkAboutReceipt
Shestak, Joe
From:Keesling, Rachel M
Sent:Monday, March 9, 2020 9:18 PM
To:Blanchard, Jim E; Chavez, Nathan; Conn, Angelina V; Hall, Willie; Haney, Douglas C;
Hollibaugh, Mike P; Jesse, Christina; John Molitor; Jordan, Alex; Kashman, Jeremy M;
Kass, Joslyn; Keeling, Adrienne M; Keesling, Rachel M; Krueskamp, Theresa A;
Littlejohn, David W; Lopez, Alexia K; Maki, Sue; Martin, Candy; McCoy, David W;
Mindham, Daren; Mishler, Nicholas F; Motz, Lisa; Shestak, Joe; Speth, Nichole M;
Thomas, John G; Warner, Caleb; Worrell, Jeff
Cc:Lisa Callahan; Butz, Bill; India Olson (India.Olson@washingtonprime.com)
Subject:Docket No. Assignment: Clay Terrace Utility Relocates (#20020016 TAC)
Follow Up Flag:Follow up
Flag Status:Completed
I have issued the Plan Commission Docket Numbers for the Clay Terrace Utility Relocates (TAC only). It is the following:
Docket No. 20020016 TAC: Clay Terrace Utility Relocates
The applicant seeks TAC only approval to begin the installation of storm sewer, sanitary sewer main, water main, and dry
th
utilities in anticipation of future redevelopment of Clay Terrace. The site is located generally at the SW corner of 146
Street and US 31. It is zoned Clay Terrace PUD Z-386-02. Filed by Bill Butz, P.E. of Kimley-Horn on behalf of the owner,
Washington Prime Group.
Mr. Bill Butz, Engineer, can be contacted at 317-218-9560 and bill.butz@kimley-horn.com.
Ms. Lisa Callahan, Senior VP of Development – Washington Prime Group, can be contacted at 317-986-8501 and
lisa.callahan@washingtonprime.com.
FILING FEES:
TAC only $371.00
Total Due: $371.00 PAID
Petitioner, please note the following:
1. This item will be on the Wednesday, March 18 , 2020 meeting agenda of the Technical Advisory Committee
(TAC), which begins at 9:00 AM. Petitioner, please have a representative attend this meeting. For your
reference, here is a link to the current TAC members list.
2. Mailed and Published Public Notice is not required.
3. The Filing Fee (RECEIVED) is due upon receipt of the application.
4. Informational Packets are not required.
5. Proof of Notice is not required.
6. Please refer to the application/checklist for more detail.
7. Review comments from the Planning/Zoning Dept. will be issued soon via ProjectDox.
Thank you,
Rachel
1
Rachel Keesling
Planning Administrator
City of Carmel, Indiana
1 Civic Square
rd
3 Floor – DOCS
Carmel, IN 46032
317-571-2417
rkeesling@carmel.in.gov
2