HomeMy WebLinkAboutL122 - Planting Plans(4) Aro-m
(2) Pic-o
(9) Ile-v
(1) Ame-c
(1) Cel-o
(15) Vib-x
(2) Que-x
(3) Cor-k
(1) Pic-p
(1) Pla-a
(2) Ame-x
(1) Tax-d
(2) Ame-x
(16) Ile-v
(3) Tax-d
(13) Aro-m
(2) Pic-p
(1) Nys-s
(1) Tax-d
(1) Lir-t
Tax-x
Myr-p
Die-l
(13) Tax-x
(1) Nys-s
(1) Pla-a
(1) Pla-a
(1) Pic-a
(19) Ile-v
(2) Pic-o
Aro-m
0
Scale 1" = 20'-0"
40'20' 10'
North
Architecture | Engineering | Interior Design
1715 Magnavox Way
Fort Wayne, IN 46804
260.432.9337
930 North Meridian
Indianapolis, IN 46204
317.917.1190
www.msktd.com
SHEET TITLE
SHEET NUMBER
SET DESCRIPTION
Permit Set
PROJECT NO. DATE
MSKTD
& Associates
PRELI
MI
N
A
R
Y
NOT FOR
CONS
T
R
U
C
TI
O
N
5/9/2019 5:42:23 PMCarmel, IndianaFranciscan Orthopedic Center ofExcellence7382 08-12-19A Project for:REV. DATE
Planting Plan
L122
Matchline - Refer to Sheet L121 Matchline - Refer to Sheet L123 Matchline - Refer to Sheet L123Matchline - Refer to Sheet L121
PARKING LOT INTERIOR
Requirement: Provide a minimum of 1 shade tree + 5 shrubs for every 10 parking spaces
provide.
Required: 69 spaces = 7 shade trees + 35 shrubs
Provided: 7 shade trees + 35 shrubs
FOUNDATION PLANTINGS
Requirement: Provide planting beds 5 feet in width, excluding driveways, courtyards,
plazas, and pedestrian access to building entrances. Plantings shall cover seventy-five
percent (75%) of the planting area
Required:
Office Building @ 1,280 l.f. - 775 l.f. hardscape x 5 = 2,525 x 75% = 1,894 s.f.
planting area
Garage @ 1002 l.f. - 52 l.f. for drive access - 16 l.f. for pedestrian access x 5 =
4,670 s.f. x 75% = 3,503 s.f. planting area
Proposed:
Office Building: 3,975 s.f. planting area
Garage: 3,506 s.f. planting area
BUFFER YARDS
Requirements:
Type A: 5' Minimum Yard Width - 4 Shade or Evergreen Trees + 10 shrubs/100 l.f.
Type C: 15' Minimum Yard Width - 6 Shade or Evergreen Trees + 1 Ornamental Tree + 15
shrubs/100 l.f.
Type D: 30' Minimum Yard Width - 8 Shade or Evergreen Trees (at least 3 shall be
evergreen) + 2 ornamental trees + 20 shrubs/100 l.f.
Note: 1 Evergreen Tree = 3 shrubs
Required:
West: (Illinois Street) Type C @ 825 l.f. - 65 l.f. (gas easement) = 46 Shade or
Evergreen Trees + 8 Ornamental Tree + 114 shrubs
East: (US 31) Type C @ 669 l.f. - 65 l.f. (gas easement) = 36 Shade or Evergreen
Trees + 6 Ornamental Trees + 91 shrubs
North:
Same property for future development @ 234 l.f.- no buffer required
(Residential Neighborhood) Type D @ 600 l.f. - 35 l.f. sanitary easement = 45
Shade or Evergreen Trees + 11 ornamental trees + 113 shrubs
South:
(Office Use) Type A @ 700 l.f. = 28 Shade or Evergreen Trees + 70 shrubs
Proposed:
West: 46 shade/evergreen trees + 8 ornamental trees + 114 shrubs
East: 36 shade/evergreen trees + 7 ornamental trees + 91 shrubs
North: 282 l.f. existing vegetation to remain + 6 existing evergreen trees + 17 shade
trees /evergreen + 6 ornamental trees + 57 shrubs
South: 23 shade/evergreen trees + 70 shrubs
STREET TREES
Requirement: Provide 1 tree for every 25 l.f. (minimum spacing) to 50 feet (maximum
spacing) in ROW.
Required: Illinois Street @ 823 l.f. = 17-32 canopy trees
Proposed: 17 trees
1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to
Plant Schedule and Planting Details for additional information.
2. All materials are subject to the approval of the Landscape Architect and Owner at any
time. Landscape Architect to inspect all plant locations and plant bed conditions prior to
installation. On-site adjustments may be required.
3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for
Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.
4. Remove from the site any plant material that turns brown or defoliates within five (5)
days after planting. Replace immediately with approved, specified material.
5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor
shall make own plant quantity takeoffs using drawings, specifications, and plant schedule
requirements (i.e., spacing), unless otherwise directed by Landscape Architect.
Contractor to verify bed measurements and install appropriate quantities as governed by
plant spacing per schedule. Plant material quantities shown on plan are minimum
quantities. Additional material may be needed to meet spacing requirements and field
conditions.
6. Seed all areas disturbed by construction activities that are not otherwise noted to receive
pavement, planting bed, or sod treatment.
7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet
Specifications. Contractor shall coordinate quantity and placement of topsoil.
Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications
for topsoil source and placement requirements)
8. All tree locations shall be marked with 2x2" stakes prior to planting for review and
approval by the Landscape Architect. Any plant material installed in an incorrect
location, by the judgment of the Landscape Architect, shall be reinstalled at the
Contractor's expense.
9. All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless
otherwise noted).
10. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities
to Owner's satisfaction at no additional cost.
11. The Contractor shall maintain all plant material and lawns until the project is fully
accepted by the Landscape Architect, unless otherwise noted.
12. All workmanship and materials shall be guaranteed by the Contractor for a period of one
calendar year after Final Acceptance.
13. Install all plant material in accordance with all local codes and ordinances. Coordinate
with the Owner to obtain any required permits necessary to complete work.
14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than
24 hours shall be installed using tree pit drainage.
15. Tree Protection Fencing is the responsibility of the Contractor. Minimum protected area
shall include the full drip line of the canopy. NO construction activities, material storage,
etc. may occur within that area. The Contractor shall ensure that no soil compaction or
tree damage occurs in any Protected areas, at any time during the construction process.
16. Trees shall be matched in groups unless otherwise noted.
GENERAL LANDSCAPE AND
PLANTING NOTES
ORDINANCE CHART
NOTE: ALL PLANTINGS SHALL BE INSTALLED PER CARMEL STANDARD
DETAILS. REFER TO SHEET L510 FOR CARMEL STANDARD DETAILS AND
PLANT CHART
Revised 08/12/2019