Loading...
HomeMy WebLinkAboutSchutt Lookabill/Eng/CO #7/12,348.48/136th Multi-Use Path & Pedestrian Bridge – Project #18-ENG-08 City of Carmel Project 18-ENG-08 136th Multi-Use Path and Pedestrian Bridge CHANGE ORDER#7 Change in Contract to include additional costs for change of materials and installation of proposed storm sewer between storm structures#12 and#13 to avoid utility delay. Agreed upon as Time&Materials Change Order as approved by City of Carmel. Contract Price prior to this Change Order $1,790,909.69 Contract Price will be increased by this Change Order $12,348.48 New Contract Price including this Change Order $1,803,258.17 Amount Adjusted Contract Cumulative%Change Price from Original Contract Original Contract $1,775,981.08 N/A N/A CO 001 ($15,099.91) $1,760,881,17 -0.85% CO 002 $2,563.14 $1,763,444.31 -0.71% CO 003 $22,025.00 $1,785,469.31 0.39% CO 004 $3,290.97 $1,788,760.28 0.72% CO 005 $290.95 $1,789,051.23 0.74% CO 006 $1,858.46 $1,790,909.69 0.84% CO 007 $12,348.48 $1,803,258.17 1.54% ClarkDietz Engineering Quality of L.fe/ Project No.: 18-ENG-008 Description: Multi-Use Path-136th Street from Range Line Road to Stadium Drive Type: Design Change Summary: Change in Contract to Include additional Time&Material cost of installation of storm sewer between structures#12 and#13. Change Order Description: Change in Contract to include additional costs for change of materials and Installation of proposed storm sewer between storm structures#12 and#13 to avoid utility delay.Agreed upon as The&Materials Change Order as approved by City of Carmel. Awarded Project Amount: $1,775,981.08 Authorized Project Amount: $1,790,909.69 Change Order Amount: $12,348.48 Revised Project Amount: $1,803,258.17 Quantity Changes: Rem No. Description Unit Unit Price Quantity Amount 116* Revised Storm Sewer,STRs 12 and 13 LS $12.348.48 1.00 $12,348.48 $12,34&48 NOTES: Contractor Date CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.:7 DATE:02/11/2020 PROJECT NAME: I8-ENG-08 MULTI-USE PATH ALONG I36T"ST. FROM RANGELINE RD.TO STADIUM DR. CITY REQ.NO.: CITY PO NO.: 102757 CITY PO DATE:03/27/2019 I. You are directed to make the following changes in this Contract: a. See Page 2 for all changes to contract SCHEDULED ADJUSTMENT ITEM AMOUNT (+)OR(-)DAYS *See Page 2 for all changes to contract II. The following referenced Documents further describe the changes outlined in Paragraph I,and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other.Change Order 7 The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $1,790,909.69 Contract Price will be increased/decreased by this Change Order $ 12.348.48 New Contract Price including this Change Order $1,803,258.17 Contract Time Prior to this Change Order N/A Days N/A Completion Date Net increased/decreased resulting from this Change Order N/A Days Current Contract Time including this Change Order N/A Days N/A Completion Date This Change Order is for full and final settlement of all direct,indirect,impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended Accepted: Clark Dietz,Inc. sGKa IT lOO l& a, /Air. �� , ENGINEER CONTRACTOA / s Brain. Mayor 8900 Keystone Crossing 54 Sv kex K✓l u-F Address Address Mary em., Suite 475 on I.n,Member Indianapolis,IN 46240 INO,4,, ,3POCrS, 1/4 �ls'e:2Z City/State/Zip City/State/Zip Jeremy.. an,PE, ty En eer By: ,n(4e By: ATTEST: Phone: 219—775-1427 Phone: 17'1 d/. /6 VO `ham % SUE WOLFGANG,CITY CLERK Date:2-11-20 Date: 1/12/2O2a Date:0/4/49 SCHUThLOOILL CO,, INC CONTRACTORS 4050 Rockville Road INDIANAPOLIS,INDIANA 46222 (317)484-1500 August 8, 2019 Mr. Cody Niles Clark Dietz, Inc. 8900 Keystone Crossing, Suite 475 Indianapolis, IN 46240 RE: Sewer Pipe between Structures 12 & 13 City of Carmel Contract 18-ENG-08, 136`h Street Multi-Use Path In accordance with INDOT 109.05 we are pleased to submit the following breakdown of costs incurred for extra work on the referenced project: Labor w/Burden $ 5,505.46 20% Allowable mark-up $ 1,101.09 Material $ 3,425.17 12%Allowable mark-up $ 411.02 Equipment $ 1,635.25 12%Allowable mark-up $ 196.23 Sub-Total $12,274.22 Bond $12,274 * 5.5/ 1000 + 10% $ 74.26 Total $12,348.48 Please find attached copies of all necessary backup. If you have any questions or need any additional information, please feel free to contact our office. Sincerely, Edward H. Kennedy, IV President enc cc: File 1908 AN EQUAL OPPORTUNITY EMPLOYER Schutt-Lookabill Co., Inc. Labor Cost City of Carmel Storm Sewer Pipe between Str. 12& 13 Date Employee Craft Type Hours Rate Total 07/02/19 Beaton,Jeff Construction Manager Regular 4.0 $ 79.80 $ 319.20 07/02/19 Smith, David Foreman Regular 8.0 $ 65.97 $ 527.76. 07/02/19 Smith, David Foreman Overtime 2.0 $ 87.28 $ 174.56 07/02/19 McClure, Daniel Operator Regular 8.0 $ 67.18 $ 537.44 07/02/19 McClure, Daniel Operator Overtime 2.0 $ 88.90 $ 177.80 07/02/19 Storms, Paul Carpenter Regular 8.0 $ 59.49 $ 475.92_ 07/02/19 Storms, Paul Carpenter Overtime 2.0 $ 77.18 $ 154.36 07/02/19 Davis, Karl Laborer Regular 8.0 $ 48.83 $ 390.64 07/02/19 Davis, Karl Laborer Overtime 2.0 $ 63.74 $ 127.48 07/02/19 Wilhite,Zachary Laborer Regular 8.0 $ 48.83 $ 390.64 07/02/19 Wilhite, Zachary Laborer Overtime 2.0 $ 63.74 $ 127.48 07/02/19 Whiteman, Justin Laborer Regular 8.0 $ 48.83 $ 390.64 07/02/19 Whiteman, Justin Laborer Overtime 2.0 $ 63.74 $ 127.48 07/03/19 Beaton,Jeff Construction Manager Regular 2.0 $ 79.80 $ 159.60 07/03/19 Smith, David Foreman Regular 2.0 $ 65.97 $ 131.94 07/03/19 McClure, Daniel Operator Regular 2.0 $ 67.18 $ 134.36 07/03/19 Storms, Paul Carpenter Regular 2.0 $ 59.49 $ 118.98 07/03/19 Davis, Karl Laborer Regular 2.0 $ 48.83 $ 97.66 07/03/19 Wilhite,Zachary Laborer Regular 2.0 $ 48.83 $ 97.66 07/03/19 Whiteman, Justin Laborer Regular 2.0 $ 48.83 $ 97.66 07/11/19 Smith, David Foreman Regular 3.5 $ 65.97 $ 230.90 07/11/19 Smith, David Foreman Overtime 1.0 $ 87.28 $ 87.28 07/11/19 Storms, Paul Carpenter Regular 2.0 $ 59.49 $ 118.98 07/11/19 Storms, Paul Carpenter Overtime 1.5_$ 77.18 $ 115.77 07/11/19 Davis, Karl Laborer Regular 2.0 $ 48.83 $ 97.66 07/11/19 Davis, Karl Laborer Overtime 1.5 $ 63.74 $ 95.61 Total: 89.5 $ 5,505.46 1-i j T(O T 9 / W VCD JJ 2 yi 1-Td o f - Dn Ca y o m-r 5 -10 mfn-0-1 D T 2 wamCCVX1- 5 - cm m 6Ca > T iD�= o N mD0 � cm mmamnE< .i>o mama T v m am3� n i-o@C Ty T� O r� � T T� zJ (� D y TJgo'� N@cam Q � � °1 T CO JQoo o mm m m i d co a a C m a .... - -+O is.6 N6Am .... O O O V) 0 0 0(T OoOm A 0 o e o e o e o 0 o a e.o DCDCDCDC (D W N N N N 0 N cum CO CO (D (D (D (D CDCDCDCD EA EA EA EA EA EA fA EA w EA EA m EA EA(A EA w EA EA EA EA EA EA EA(A fA fA IA EA EA EA EA fA EA EA EA EA(A EA EA EA EA fA EA EA FA EA EA EA EA EA EA EA EA 3 o Ca O-6 0n < C m m P n a W O O C N D) D) DC l J C J T. -,4w W O W W O O O O O O N O(0 W 0.0 N AOAA 00 0 0.00 m 00 V O)O W A �0 N 0 A N N N(J ) O 0 0 UI i d W N W 0)A 0 N N W W O W a W A CD O V A A V- COW 0 W 0 W W O(J C O O ) W OD •V O N CD N O A W W a r- D) (n 0 O, C n 0" m o " ................. EA 0 ................. FA 3 »O < £ x a �$T j A N a n D Zl c . ( O (O N CO D) op O N 3 (/) (O O' m 3. )< F m^ A N ((,�� 3 W W W O�-+O 0 0 O W 0) 6 5 W-W+A O N N O a o o o-s O(0 A O)O (O b W O - O N--,N 6 O) O bo - a ,,-a O W) -• N O W W N a V 0 W W 1 a O O V (D V N A-+W N N N W W 0 W A W A 01 M fD EA EA EA(A EA EA EA EA EA EA EA EA EA FA EA EA EA fA FA EA fA fA EA fA FA EA EA FA FA EA FA EA FA fR FA fA D) CA 0 d O fD N N 3 3 3 m m 3. W N m 0 W m W o N N O O O O W W m 5 CO C../ A O W W O 0 0 0 0 0 W O W V O N OD fO O) ' ' O n OM W - A W N W W W O W W ' 0 00 W (ID C0 O A-W+O W ' N ' Ni OOo W O- W A OW)A CWo EA(A EA EA EA EA EA EA EA EA(A EA EA EA EA EA EA EA fA EA EA fA(0 EA EA FA EA CA(A EA EA EA EA EA EA (A � 3 _ O C O7 N D]C f0 N _ C UT m 0 D) D) J CO O W O N N O O O O O O-+O(O (N0 v CO A O N N O O O W fO V `J< COA N W W W W ' N ' NCO W O W A OW)A V CO W N W V DD W W W W V 00D W (V!) ) N O O6 SCHUTT-LOOKABILL CO., INC. DAILY TIME REPORT AND COST DISTRIBUTION SHEET Please print clearly Date: -1 '2-�� T+-c �.c-�, DESCRIPTION AND LOCATION OF ITEM OF WORK Job#: I 43 ?, Tyr • Job Name: A-It-k 7111 SUPERVISOR'S SIGNATURE ,r`V>" EMPLOYEE NAME CRAFT HOURLY CODE CODE CODE CODE TIME TOTAL WAGE UNION RATE BASIS HOURS CODE CODE 11 D.TJO.T. REG. Li- D.TJO.T. 1*-k .t REG. D.TJO.T. JtAr n.!N`D ••I l.._LLIL.i, `�� REG. D.TJO.T. C �... JT'S� 1.,�..;., REG. S D.TJO.T. 7` _ A-t.J( S REG. D.TJO.T. D (4--:. L.. t 'ri-i REG. REG. sa D.TJO.T. REG. • D.TJO.T. REG. D.T./O.T. REG. D.T./O.T. REG. D.TJO.T. REG. TOTAL TOTAL HOURS BY CODE DAILY HOURS DAILY QUANTITIES BY CODE U..F... I i"""4: `, �'�! '-� ` � -� �•� -r 4�:. L__.. W E 14-A�+ . '` r t.0 L,F- - ,� Al 13\t•.- Q_x-( U l t L l /6f7 nJ •/ I. l h 1 r)_. r ;�+ P _ L f'- w j ' I. i.i' i—.a•;i _ L�D -{ \v\Llc S �.rJ f -E f , b - r,.;'I r. 1 �} {• =' I 1 (� i 27.N /1 iI-� �J IC:J�- —Q.� t...I '�; 't' 4/ �V cJ(T�^._ c;}r I�� r• �{nJ r C 5T,T r S WILL aE S crams / fiu SCHUTT-LOOKABILL CO., INC. DAILY TIME REPORT AND COST DISTRIBUTION SHEET Please print clearly Date: -7r ` \9 L-3CJ N'€31;.,..-,1 DESCRIPTION AND LOCATION OF ITEM OF WORK Job#: ��Ja 1 Job Name: C --12-ma_ SUPERVISOR'S SIGNATURE EMPLOYEE NAME CRAFT HOURLY CODE CODE CODE CODE TIME TOTAL WAGE UNION RATE BASIS HOURS CODE CODE D.TJO.T. Y�L�rJ'� �' REG. Z� _ �y\ 7 D.T.IO.T. 2 REG. 2� D.TJO.T. ' -"'1 C-L k l-,�L-`!-(� I/ REG. Z T c D.T.lO.T. REG. rL_ D.TJO.T. fjp(S REG. Z - ^. D.TJO.T. rrr T`G 7/' REG. D.T./O.T. JikSTI! ) `- An'I REG. 2-- D.TJO.T. REG. D.TJO.T. REG. D.T./O.T. REG. D.TJO.T. REG. D.TJO.T. REG. TOTAL TOTAL HOURS BY CODE DAILY HOURS DAILY QUANTITIES BY CODE (`-tom -L� i 10 I: v r ?Lc!-sue r- SCHUTT-LOOKABILL CO., INC. DAILY TIME REPORT AND COST DISTRIBUTION SHEET Please print clearly Date: -1 — DESCRIPTION AND LOCATION OF ITEM OF WORK Jab#: I 4 0 46 Job Name: �Z S PERVISOR'S SIGNATURE EMPLOYEE NAME CRAFT HOURLY CODE CODE CODE CODE TIME TOTAL WAGE UNION RATE BASIS HOURS CODE CODE D.TJO.T. 'LAAJ .I l4 REG. 3'( D.TJO.T. I (Z REG. L. �GA JlS D.TJO.T. . REG. D.TJO.T. REG. • D.TJO.T. REG, D.TJO.T. REG. • D.TJO.T. REG. D.TJO.T. REG. D.TJO.T. • , REG. D.TJO.T. REG. D.TJO.T. REG. • D.TJO.T. REG. TOTAL HOURS BY CODE DAILY TOTAL HOURS DAILY QUANTITIES BY CODE ,-'1;'2." I ;' 14 4 4-AL / `_c_U LA,,i F"' Schutt-Lookabill Co., Inc. Material Cost City of Carmel Storm Sewer Pipe between Str. 12&13 Date Vendor Description Amount 7/1/2019 Utility Pipe Sales 56' 12"SDR 35 Pipe $ 467.60 7/2/2019 Eastside Trucking 8 Hours Hauling $ 840.00 7/3/2019 Utility Pipe Sales 42'-12"SDR 35 Pipe $ 350.70 7/3/2019 Utility Pipe Sales 2-12"SDR 35 45-Deg Bends $ 263.60 • 7/3/2019 Utility Pipe Sales 1 -12"SDR 35 22.5 Deg Bends $ 167.27 7/3/2019 Irving Materials 16 Cyd Flowable Fill $ 1,336.00 $ 3,425.17 SCHUTT-LOOKABILL CO., INC. DAILY TIME REPORT AND COST DISTRIBUTION SHEET • Please print clearly -1 _ 9 • EQUIPMENT HOURS MATERIALS CA-7 �j �- �- QUANTITY JI I r-L. EA TNT I�Ian L \oe kG„. I J • • • • • • • • INDOT APPROVAL SCHUTT-LOOKABILL CO., INC. DAILY TIME REPORT AND COST DISTRIBUTION SHEET Please print clearly 1. 3_ t EQUIPMENT HOURS MATERIALS QUANTITY CA- cL3.� � .� l � ��C.�-�.�err,�,� �t��2c INDOT APPROVAL SCHUTT-LOOKA,BILL CO., INC. DAILY TIME REPORT AND COST DISTRIBUTION SHEET Please print clearly 7_ 11, 1 9 • EQUIPMENT HOURS MATERIALS QUANTITY INIEM1111111111111 11111111111111111111111111 I -11.111.4 11111111111111111.1 -�i -i 11.11111111.111111111 111.1111111.1.11111 .111.1.1.11111.1111111111.1.11111111.1111111111 INDOT APPROVAL UTILITY PIPE SALES OF IN, INC. Invoice i►. 1 1802 N Green River Road �I hLJ I ILITY Evansville IN 47725 ■ PIPE SALES (317)224(317)224-23 30100ax Number i IN084540 Providing The Flow, Above& Below" ' 1 Page 1 Date 07/02/2019 Bill I SCHUTT-LOOKABILL CO., INC. I Ship SCHUTT-LOOKABILL CO., INC. To 4050 ROCKVILLE RD To 4050 ROCKVILLE RD SCHU INDIANAPOLIS, IN 46222-3950 SCHU ;INDIANAPOLIS, IN 46222-3950 IIInIIII„III1IIILLIIIIIIILIJiiiliiiilli IuiII Customer PO# I Shi Date i p I Salesperson 1 Terms Tax Code r---------- 1908 . . I 07/01/2019 1 JAY SCHEIL i • Net 30 Days IN Document # Warehouse Freight 1 Ship Via 00080282 UTILITY PIPE SALES OF IN, INC. Prepaid BEST WAY Item/Description I Ordered Ship d BackOrder j uM I Price Per ! Extension P3512G 56 56 0 FT 8.35 FT 467.60 12" SDR 35 PVC SEWER PIPE GASKET JT 14' LENGTH Taxes: INDIANA 3 1 I lea I � `log ODD _ G>Ooaa ... 1 y.b'1, ),0 I Sb - I a � 502 Ss-- Pi L..-- I I `• y 1 r., .c,x, ,- ; -v, - ,..:�,. . ——. I i 1 i 06/01/15-INVOICES WILL NO LONGER BE MAILED. Merchandise Add On Charges Tax Total Due PROVIDE PAYABLES EMAIL ADDRESS TO -- —-- — — ---- We appreciate your business 467.60 0.00 _ 3_ HII!IIlIIJIIIIIJIIJ UIIIJIIIUhI I II III II III II III II III II III H III I IIII IN IN084540 Customer Copy ... Last page UTILITY PIPE SALES OF IN, INC. PICK TICKET II ° IIUTILITY 2821 N. wood Ave. Indianapolis, IN 46219 PIPE jammILES (317)224-2300 (317)224-2301 FaX Number 100080282-030-001 E-Mail: sales@utilpipe.com "Providing The Flow, Above & Below" Website: www.utilitypipesales.com - Page !1 Date 07/02/2019 Ship SCHU Bill SCHUTT-LOOKABILL CO., INC. To SCHUTT LOOKABILL CO., INC. To 4050 ROCKVILLE RD 4050 ROCKVILLE RD SCHU SCHU INDIANAPOLIS, IN 46222-3950 INDIANAPOLIS, IN 46222-3950 PO #/Ref.# I Order Date Req. Date Slsp. Terms WH Freight Ship Via 1908 07/02/2019 ASAP JS Net 30 Days 030 Prepaid BEST WAY Item Description Ordered Shipped Backorder um Weight um l Loc P3512G 56 0 FT 56.000 EA' 0/S-N 12" SDR 35 PVC SEWER PIPE GASKET JT 14' LENGTH • • • • • • • 1 i I , I is Cutoff Date 07/02/2019 Printed 07/02/2019 07:06 tg Total Weight: + I IIII IIII I IIII I I IIII I III!II III II III II II I II I I I II III II III II III II III I IIII II III II III II III I IIII II III II III II III I IIII PT 00080282-030-001 Customer Copy ... Last page ��TRu � , ` Invoice Date: 16-Jul-19 Remit To: 1545 East 35th St. trsCP •• Indianapolis, IN 46218 i ,'A 1 m-z-U INVOICE#: 16290 e; I 0 2JOB#: 1908 Schutt Sold To: • f'-;r-- "` Schutt JOB NAME: City of Carmel 136th Street Schutt-Lookabill Co.Inc JOB TYPE: Certified PO#: 4050 Rockville Road Indianapolis,IN 46222 WEEK ENDING: 7/6/2019 HOURLY INVOICE DATE TRK#/EMP TICKET# REG HRS REG RATE OT HRS OT RATE DB HRS DB RATE TOTAL -- 8.00 ��,�.0 y1r� �1 4/'/ 7/1/2019 MT6I7:NA 78133 $105.00 2.00 / $120.00 0.00 $0.00 $1,080.00 7/1/2019 720:NA 79215- 6.501 $105.00 0.00 $120.00 0.00 $0.00 $682.50 kvl- d'1 J 7/1/2019 142:NA 79216- \\''•°` .. 6.00 $105.00 0.00 $120.00 0.00 $0.00 $630.00 TOTAL FOR 7/1/2019 -i-} .. o.°- . 20.50 2.00 0.00 S2,392.50 8 / 7/2/2019 MT617:NA`�09 79217 s ��y 8.00 / $105.00 3.00✓ $120.00 0.00 $0.00 $1,200.00 0- 3 TOTAL FOR 7/2/2019 8.00 3.00 0.00 $1,200.00 t.i9V 1. -•/..;- "- ..aa 5-'?s-- 7/3/2019 . MT617:NA 79218--.,1 � t.8.4.00........ t$105.00! 0.25 • $120.00 0.00 $0.00 $870.00 - TOTAL FOR 7/3/2019 8.00 0.25 0.00 S870.00 TOTAL HOURS: a s �36.50 C 5.25 0.00 #OF TICKETS5 PLEASE PAY THIS AMOUNT: TOTAL CUSTOMER INVOICE: $4,462.50 NET 30 DAYS I2 Code Am De6c. O0$ off - °- - -I- o1 la3o, b. ‘,.� lq $ te-, . og.4" "1. al .45-.. . . `{. ,� h 3 19j . t D�a OO�ep _ a $'Ao o!J O \q oZ -►,N.C.- t5S1 LA q , la 'g 11 - otial.`-1- o.0 1{o1 .-aS I .‘"h : 5 I g 303- oaa\ o . ,==s,t 15 ').�'b \ .f1�3 Any questions in regard to this invoice,please call(317)283-6774 Strive not to be a success,but rather to he of value. -Albert Einstein Created by BattsDatabaseDesign.com • • • A/a- /e/5 1;:zick 79217 Eci1,ide Trucking. Inc. 1545 E.35th Street,Indianapolis,IN 46218 * Phone:317-283-6774 * F •317-283- 785 LOADS DAY /rj( DATE D ! A/O/? lb 11 21 CONTRACTOR Sc`tutt- 10044-6r 12 22 TRUCK NO. 03 13 23 TIME IN 6 i 694 7 TIME IN -71. d" — c27 L s. 14 24 TIME OUT 00 TIMEOUTIIIJ-OS149-tv4-3Ws 05 15 25 ei TOTAL HOURS `( VV > 06 16 26 / y� 07 17 27 D( f�!' i+. �/"G/ T���FORE — �, — �11B) 18 28 JOB#1 /%7 _ i3 / 09 19 29 JOB#2 10 20 30 � s I 3act-ram UTILITY PIPE SALES OF IN, INC. Invoice /j .--, 1 1 1 802 N Green River Road ep�� � Evansville IN 47725 PIPE .. SALES (3 (317)2-230300ax '',`�' - Number IN084670 'Providing They Flow, Above: & Below" - ----- Page 1 Date 07/05/2019 Bill i SCHUTT-LOOKABILL CO., INC. i Ship 136th Street Pathe To 14050 ROCKVILLE RD 1 To Schutt-Lookabill Co.,Inc. SCHU i INDIANAPOLIS, IN 46222-3950 I PATHE Project 18-ENG-08 1366th ST • J Path Range Line Rd to Keystone I;IiiIilliiiililitlililliliillililu ililliiiliiill Carmel, IN Customer PO# Ship Date ; Salesperson Terms Tax Code 19-08 07/03/2019 1 JAY SCHEIL Net 30 Days INGOV Document It Warehouse Freight ! Ship Via 00080232 UTILITY PIPE SALES OF IN, INC. Prepaid ' Customer Pick-Up Item/Description / Ordered Shipped! Back Order una Price Per Extension P3512G 42' ✓ 42I 0 FT 8.351 FT 350.70 12" SDR 35 PVC SEWER PIPE GASKET JT 14' LENGTH J 1 I FS1245BG / 2': 2 j 0 EA 131.80 EA 263.60 12" SDR35 45-DEG BEND GXG I J i N-FS1222BG I 1. / 1 0 J EA 167.27 EA 167.271 12" SDR35 22.5-DEG BEND GXG I SMPO J 121 /12 0 EA 6.37 EA 76.44 ORANGE INVERTED SPRAY I I J 1 PAINT, PLASTIKOTE • 1 '1 81.E •4� ' - 1A" 6 be-3r PJ4- 1 { 0 00� , a� - `I. ' \ PA. i.- ': 'Th �.. I ir•c-may`.3 i 0 6101/1 5-INVOICES WILL NO LONGER BE MAILED. Merchandise! Add On Charges Tax Total Duel PROVIDE PAYABLES EMAIL ADDRESS TO ' - We appreciate your business 858.011 0.00 0.00 ✓ 858.01I I IIIIIIIlIUhIlIUIIi IHflhiI!UhlIlIIIiIJII. 111111 UIIIIIIIIHIII IN IN084670 Customer Cony . )-as rlana UTILITY PIPE SALES OF IN, INC. PICK TICKET II ° iiUTILITY 2821 N. wood Ave. Indianapolis, IN 46219 ■ PIPE SALES (317)224-2300 (317)224-2301 Fax E Mail: sales@utilpipe.com Number:00080232-030-001 "Providing The Flow, Above &Below" Website: www.utilitypipesales.com Page !1 • Date ;07/01/2019 Ship PATHS Bill �SCHUTT-LOOKABILL CO., INC. 136th Street Pathe To Schutt Lookabill Co.,lnc. To j 4050 ROCKVILLE RD PATHS project 18 ENG 08 1366th ST SCHU INDIANAPOLIS, IN 46222-3950 Path Range Line Rd to Keystone Carmel, IN PO #/Ref.# Order Date Req. Date Slsp. Terms WH Freight Ship Via 19-08 07/01/2019 ASAP JS „ Net 30 Days 030 Prepaid Customer P/U Item Description Ordered Shipped Backorder um l Weight um Loc P3512G • 42 0 FT 42.000 EA, 0/S-N 12" SDR 35 PVC SEWER PIPE GASKET JT 14' LENGTH • FS1245BG 2 �? — 1 EA 19.660 EA D/16 12" SDR35 45-DEG BEND GXG N FS 1222BG • 1 1 EA .000 EA: 12" SDR35 22.5-DEG BEND GXG SMPO 12 0!EA .000 EA! C/14 ORANGE INVERTED SPRAY • J V V PAINT, PLASTIKOTE 1u! I � • • • • • I • Cutoff Date 07/01/2019 Printed 07/01/2019 08:12 me Total Weight: + PIE> Ib fl .rJJ'�I�f�' 'II II �I II I I II I I� I I II III II DM111!I IIII II III II III II IIII IIII JIIIIIiII ffI11111 II II _II I1Ii1IIIIIIIIIII1IIIIIIIIIIllllll1IIIIIIIIIIIIIlIhlllllHmdllj-030-001 PT 00080232-030-001 Picked' , st page ® 411 P.O. Box 7048, Group#2 I VOICE Phone(317)326-3101 7048 Irving Materials, Inc. Fax(317)326-3105 Customer Acct# Invoice Date invoice www.irvmat.com 89844 07/03/2019 10726200 For billing questions,please call our office at (317)326-3101 Total Due if Paid by 08/10/2019 $1,336.00 Total Due if Paid after 08/10/2019 $1,384.00 SCHUTT LOOKABILL 4050 ROCKVILLE RD Delivery Address SUITE 44A 18=ENG=08 MULTI USE PATH} 136TH ST/S_ INDIANAPOLIS IN 46222 PO,No -Job-No:---- -.------ Project No. - Order No. 19 02 1D08. 8s� 48 I ;Plant; Item°No • _ escnption •/ ty UOM . Price xtended Amount 109 9140IN FLOWABLE FILL REMO ABLE 16.00 cy 8-55r 0 gA.0 1,300.00 I.31A 4' 109 31�� �ENVIRONMENTAL FEE/ ✓2.00 ea 12.00 24.00 * 109550 2, 10955/76 ✓✓ RA✓✓may f i e.42 Code w_: ,,r,[s «� , I I14,g a) 1336. — ,...A - c i ( 1 j '9- y t srar ..... _r--'-r r--._C. :�`e.rr-'+mot-►"w.-.yfiir Discount ,.. IIt.,Paid By Total Quantity . Subtotal Sales.Tax "PI.►�L�Di*0>tlrtl� $48.00 08/10/2019 16.00 cy $1,384.00 $.00 $4,304.0&- FM01(12/17) ✓ Retain this portion for your records. ® Detach here and return with your payment Customer Acct# Invoice Date Invoice# mow s 111111 P.O. Box 7048, Group#2 89844 07/03/2019 10726200 Irving Materials, Inc. Indianapolis, IN 46207-7048 Total Due / if Paid by 08/10/2019 $1,336.00 Total ifPaidDueafter 08110/2019 $1,384.00 * 0 3 0 3 0 2 Amount Enclosed ' Make check payable to Irving Materials, Inc. SCHUTT LOOKABILL Remit To: 4050 ROCKVILLE RD SUITE 44A Irving Materials, Inc. INDIANAPOLIS IN 46222 P.O. Box 7048, Group#2 Indianapolis, IN 46207-7048 0 0 Remit To:P.O.Box 7048,Group#2 Indianapolis,IN 46207-7048 Concrete Delivery Ticket 1.M.1 Irving Materials,Inc. Plant A Ticket Number Truck I Load Size Mix Slump Use Date LI Customer .. .. Sold To Tax Code Driver 1 Project No. Order No. Delivery Address P.O.Number 'T'. -E;'-;n-i.71;.; :';;'; 7 i • t1'.!' rif;TH} 1-36 TH '---..-.:r r' NC ;-.77-7 PO ,--1.; i: ":1:;;.i.l:;7-j T T a Cii; 7,1-W...; :'. "',;f: Pr2 ni,; ,I;;_..1-t= ;:;Ii::3!-fif:'-::-1 ;;;-.fril,' T-;'. Job No.I • j':', i . 7:: .--• -.•-. • .:---,•i N 7 :::.'_'' ':..'•: ":''-'7''' WE i;..-i',*...5 L':...-H TV, 7. 1. -',.; ..,.W '-;.; Load Quantity Total I_Ordered Quantity Product Code Product Description 1 Unit Price Amount _ , . . . t5z...., 1 1 I -SitiMAINetiiri:',:.7,:' dtshitgt-ii-Retitiett-- TNtlaGiallons Readirig.:,.-. .L. -,....,-:- Subtotal Tax On Job Time Finish Pour Time Total PROPERTY DAMAGE RELEASE/WARNING - Irritating To The Skin and Eyes Dear Customer-The Seller is not responsible for slumps,strength or quality of concrete to which water or any other material has been added by the purchaser or at his request. The undersigned hereby authorizes Irving Materials,Inc.to use private property for making the delivery shown here on and assumes full responsibility for any damage or injury due to the premises. The undersigned agrees to reimburse said Company for loss of time and equipment by reason of such delivery and also to identify and save harmless said Company from any and all claims,demands and suits for or on account of or in any manner caused by or arising from private property delivery. The undersigned assumes responsibility for a suitable roadway from public highway to point of delivery and is responsible for any needed wrecker service charges as a result SAFETY WARNING: Keep away from children. Contains Portland Cement. Irritating to the skin and eyes. Wear rubber boots,gloves and eye protection. Prolonged contact may cause bums. In case of contact with skin or eyes,flush thoroughly with water. If irritation persists,get medical attention. For additional information regarding the HAZARDS OF READY MIX CONCRETE,consult the Material Data Safety Sheet(MSDS)available upon request. PRODUCT NOTICE: Seller will not be held responsible for the final appearance of exposed aggregate,integral coloring,stamped and decorative surfacing,and all other forms of architectural and design concrete. DELIVERY NOTICE: Seller assumes no responsibility for deliveries beyond the public right of way. Buyer assumes responsibility for damages including but not limited to curb,sidewalk, driveway,or any property of the contractor or property owner or agents. NOTICE:MY SIGNATURE BELOW INDICATES THAT I HAVE READ THE SAFETY AND HEALTH WARNING NOTICE AND ACCEPTANCE OF THE LOAD. Release,Load and Terms Accepted By: X ,.. .... .., M.•••=.11111 eMINNIIMMmime .1...! '...-•-4-c-.,'-,,, %-:::4 co —kl3 1111111,- - — c•-•''' 1 141-:',-0 —.co ,p sow orri• „..,,_:- _ -''• - • ...:::-..:,----.7 ..-, .,,,,-.N.,,...„4:11E--..e ,litH; ;0- 1,5 !:,;,• 4,,:•; ',., ;::.; ' :“. „. f i'- . .............., C 414).V;', • 4,:tc: .s4)..7 12. e,Ot, m.... . ..... ... ...., .11..1......m. Concrete - Sand - Gravel - Stone "We're Proud Of Our Work" General Office (317) 326-3101 CUSTOMER COPY 0 Remit To,:Pp. Box 7048,Group#2 ' Indianapolis,IN 46207-7048 Concrete Delivery Ticket 1H111. Irving Materials,Inc. Plant i'iTicket Number Truck I Load Size Mix I Slump I Use Date Customer Sold To Tax Code Driver _Project No. Order No. LOC,' . 7 7 ;--,. Delivery Address P.O.Number ;.;-7_-;•7 ZET— ;•-•:,:wE; , E N 'T.: H ST/.:::;MC:1 'sr:SF Job No.l. -40h Load Quantity Total Ordered Quantity I Product Code • Product Description Unit Price Amount ; • •••••';','•f‘ ••• Water Added it At Tia :SfiMie Mtr ,ciipt.9044;neopst NO.Gallons ReadingSubtotal ... Tax On Job Time Finish Pour Time - Total PROPERTY DAMAGE RELEASE/WARNING - Irritating To The Skin and Eyes Dear Customer-The Seller is not responsible for slumps,strength or quality of concrete to which water or any other material has been added by the purchaser or at his request. The undersigned hereby authorizes Irving Materials,Inc.to use private property for making the delivery shown here on and assumes full responsibility for any damage or injury due to the premises. The undersigned agrees to reimburse said Company for loss of time and equipment by reason of such delivery and also to identify and save harmless said Company from any and all claims,demands and suits for or on account of or in any manner caused by or arising from private property delivery. The undersigned assumes responsibility for a suitable roadway from public highway to point of delivery and is responsible for any needed wrecker service charges as a result. SAFETY WARNING: Keep away from children. Contains Portland Cement. Irritating to the skin and eyes. Wear rubber boots,gloves and eye protection. Prolonged'contact-may cause burns. In case of contact with skin or eyes,flush thoroughly with water. If irritation persists,get medical attention. For additional information regarding the HAZARDS OF READY MIX CONCRETE,consult the Material Data Safety Sheet(MSDS)available upon request. PRODUCT NOTICE: Seller will not be held responsible for the final appearance of exposed aggregate,integral coloring,stamped and decorative surfacing,and all other forms of architectural and design concrete. DELIVERY NOTICE: Seller assumes no responsibility for deliveries beyond the public right of way. Buyer assumes responsibility for damages including but not limited to curb,sidewalk, driveway,or any property of the contractor or property owner or agents. NOTICE:MY SIGNATURE BELOW INDICATES THAT I HAVE READ THE SAFETY AND HEALTH WARNING NOTICE AND ACCEPTANCE OF THE LOAD. Release,Load and Terms Accepted By: X • •••••=.1111=••• asIMilimim••••• --,24•4 • . •• p-ewA Cr)••=••••=mmmal 7.• $1. — • • "• v.:a? -; it 1: . !1•1: !!, . _ Concrete - Sand - Gravel -Stone "We're Proud Of Our Work" General Office (317) 326-3101 CUSTOMER COPY Schutt-Lookabill Co., Inc. Equipment Cost City of Carmel Storm Sewer Pipe between Str. 12&13 Date Description Hours Rate Total 7/2/2019 Cat 315 Excavator 10 $ 100.00 $ 1,000.00 7/2/2019 Chevy 2500 Pickup 10 $ 17.50 $ 175.00 7/2/2019 Chevy 1500 Pickup 4 $ 15.00 $ 60.00 7/2/2019 Hand Tools 10 $ 3.00 $ 30.00 7/3/2019 Cat 315 Excavator 2 $ 100.00 $ 200.00 7/3/2019 Chevy 2500 Pickup 2 $ 17.50 $ 35.00 7/3/2019 Chevy 1500 Pickup 2 $ 15.00 $ 30.00 7/3/2019 Hand Tools 2 $ 3.00 $ 6.00 7/11/2019 Demolition Saw 2 $ 5.00 $ 10.00 7/11/2019 Chevy 2500 Pickup 4.5 $ 17.50 $ 78.75 7/11/2019 Hand Tools 3.5 $ 3.00 $ 10.50 $ 1,635.25 SCHUTT-LOOKABILL CO., INC. DAILY TIME REPORT AND COST DISTRIBUTION SHEET Please print clearly a_ 1 9 • EQUIPMENT HOURS MATERIALS QUANTITY e4tsBSIA . TNf(cam �1 t • • INDOT APPROVAL SCHUTT-LOOI<ABILL CO., INC. DAILY TIME REPORT AND COST DISTRIBUTION SHEET Please print clearly `l. 3, t EQUIPMENT I HOURS MATERIALS n- �. r QUANrirr Li 1 (0 � �s INDOT APPROVAL SCIIUTT-LOOKABILL CO., INC. DAILY TIME REPORT AND COST DISTRIBUTION SHEET Please print clearly -1. 1 I- 1 9 EQUIPMENT HOURS QUANTITY I /1111=====.11111111I I � =MMEMINIMIIM-ii t I -i mmomm __MMEMEIMIIIMMI mnown _=MEMEMEMINIMIN mmommmmoMMEMEMEMININII INDOT APPROVAL 18-ENG-08 136th St. Multi-Use Path & Pedestrian Bridge Progress Meeting Agenda Wednesday, July 10, 2019 Attendees: X Cody Niles Clark Dietz 219-775-1427 cody.niles@clarkdietz.com Eric Von Hoven Clark Dietz 317-313-7502 eric.vonhoven@clarkdietz.com X David Littlejohn City of Carmel 317-571-2306 dlittlejohn@carmel.in.gov Josh Kirsh City of Carmel 317-519-8652 jkirsh@carmel.in.gov X Bob Bowlen Schutt-Lookabill 317-484-1500 bobbowlenslc@hotmail.com Ted Kennedy Schutt Lookabill 317-484-1500 ehkennedy@hotmail.com Charley Highsmith Schutt-Lookabill 317-484-1500 charleyhighsmithslc@hotmail.com Ben Highsmith Schutt-Lookabill 317-484-1500 bhighsmith@hotmail.com Meeting Agenda: 1.0 Construction 3-Week Schedule Update Bob Bowlen • Schedule will be provided by Bob Bowlen this week Road Work Bob Bowlen • Curb framing on west end of project through First Ave. Planning to pour on Thursday, Friday, and Monday. • Modular Block Wall shop drawings will be provided by Bob Bowlen this week Bridge Work Bob Bowlen • Thursday begin on the east end, clearing the drive and gate, building a crane pad and access for the crane • Next Wednesday or Thursday, crane will come in and Thursday or Friday piles will be driven • Schutt plans bridge will be delivered late July(^29th) Maintenance of Traffic Cody Niles • Discussed a possible road closure to set bridge due to the small space near the creek and the size of crane needed 2.0 Utility Coordination Duke Conflicts Cody Niles 1 • Need Modular Block Wall shop drawings in order to examine sleeving Electric through wall. Spectrum Conflicts Cody Niles 3.0 Clerical Erosion Control Reports Cody Niles • No Erosion Control Reports received to date • To be provided by Deanna Certified Payrolls Cody Niles • Receipt for processing Pay Applications • Add Carmel PO to Pay Application for processing • To be provided by Deanna Sign & Barricade Reports Cody Niles • No Sign & Barricade Reports received to date. • To be provided by Deanna Change Orders Cody Niles • Change Order 001—Modular Block Wall (complete) • Change Order 002—STR#22 (complete) • Change Order 003—Additional Tree Clearing (complete) • Change Order 004— Force Account Work for STR#13 Safety Bob Bowlen 4.0 Public Relations Concerns and Coordination David Littlejohn/Josh Kirsh • Continued coordination with property owner at 741 15t Ave. NE (Ryan Coyle) regarding salvaging landscaping and fence removal. 2