Loading...
HomeMy WebLinkAbout018 Copper RunGE01T01GE02T02T02T02T02T02T03T03GE03T04T04T04T04T04T05T05T05T01T01T01GE04 T06 T06 T07 GE05M01M01M01M01TG01 M01M01M01GE06 GE07 GE09T05T04T09T09T09T09T09T09V01 V02 V03 V04 V05 V06 V07V08V09PB01PBE01PB01PB01PB01PB01PB01PB01PB01PBE01PB01PB0128-00-00 20-00-00 48-00-00 34-04-006-00-002-00-0042-04-0020-00-006-06-0021-06-00 58-00-0042-04-0034-04-0016-03-0818-00-0810-00-00 2-00-0020-00-007-03-0048-00-00 10-09-00 6-11-00 19-00-00 11-04-00 2-00-00 1-00-00 3-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-09-00 1-00-00 2-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-00 2-00-00 2-00-00 1-09-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-001-01-001-01-009-05-082-00-002-00-00 2-00-002-00-002-00-082-00-002-00-002-00-002-00-00OPTIONSDESCRIPTION DESCRIPTION- ELEVATION - HR2T -- LEFT HAND -- 3 CAR SEG -- GAME ROOM --TRAY CEILING - OWNER'SSUITE-- -PULTE HOMES018 Copper Run - Maple Valley - HR2TAddress:Sales:BILL HOLTScale: 1/8" = 1-00-00Job Number: B20000520 Drawn by:Brian Allen IIDate: 02/14/2020 Lot Number: COP 018 Designed by:Brian Allen II TRUSS PLACEMENT GUIDE CUSTOMER:JOB NAME & MODEL:DO NOT CUT TRUSSES! TRUSSES CUT BY ANY TRADE / SUB-CONTRACTOR WITHOUT FIRST RECEIVING PERMISSION ANDDIRECTION FROMPROBuild, (317) 834 5380, SHALL BE CONTRACTOR / BUILDER RESPONSIBILITY! NO EXCEPTIONS NOTES: TRUSSES ARE SPACED 24" ON CENTER UNLESS NOTED OTHERWISE. REFER TO THE INDIVIDUAL TRUSS DESIGN DRAWINGS FOR THE LOCATION OF LATERAL BRACING AND MULTY-PLY CONNECTION REQUIREMENTS. PER ANSI TPI 1-2002 THE TRUSS ENGINEER IS RESPONSIBLE FOR TRUSS TO TRUSS CONECTIONS AND TRUSS PLY TO PLYCONNECTIONS. THIS PLACEMENT PLANRECOMMENDS TRUSSTO BEARING CONNECTIONS AND TRUSS TO BEAMCONNECTIONS WHICH SHALL BE REVIEWED BY THE BUILDINGDESIGNER TO RESOLVE ALL ROOF FORCES ADEQUATELY TO THE FOUNDATION. ALL TRUSS TIES TO BE INSTALLED BEFORE O.S.B. IS APPLIED TO ROOF.