Loading...
HomeMy WebLinkAboutM100 HVAC PlanRELEA5E0 FOR CONSTRIICTI�N Su6jec��o compliance with allregula�ions of S�a�e antl Local Codes City of Carmel r �un��V�lo•rvalM��_ onrE: 03/19/20 C �� L � Y� � 1 R� -��`-'`���y O Q I FE I `� O r - 1 II y� II L -�J � . i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 � � � r- � � � ' ` ��,, u r�r ,, , � �—� � � 1 1 1 1 � � � � 1 1 1 1 1 1 1 I I r =n� il ;K li L — J � I,,_E � �N — — � I ,� HVAC DEMOLITION PLAN ��� SCALE: 1/4" = 1'-0" i 2 HVAC PLAN ,�- SCALE: 1/4" = 1'-0" ��`"� GENERALNOTES: 104 HALL I03 UTILITY � 1. REFERENCESHEETM-0�iFORLEGENDS, ABBREVIATIONS, SPEQFICATIONS AND NOTES. 2. REFERENCE SHEET M-001 FOR OETAILS AND SCHEDULES. 3. DEMOLITION PLANS ARE DIAGRAMMATIC AND BASED ON LIMITED SURVEV DATA. HVAC WNTRACTOR SHALL VISIT SITE, EXAMINE ALL PLANS AND DETERMINE E%ISTING ELEMENTS TO REMAIN AND EXISTING TO BE REMOVED AS NEE�ED TO MEET DESIGN INTENT. HVAC CONTRACTOR SHALL �ISPOSE OF ALL REMOVED HVAC COMPONENTS. PRIOR TO ANV DEMOLITION, CONTRACTOR SHALL COORDINATE WITH G C. 4. PRIOR TO ROl1GH IN HVAC CONTRACTOR SHALL ATTEN� MEETING WITH OWNER AN� G.G AND COORDINATE ALL FlNAL LOCATIONS AND CONNECTIONS FOR HVAC SVSTEMS. KEY NOTES: HAND WASH II, � I� 1 > n 106 lo� I LINEN �i ��T � i' 4"0 PVC � CO I 6"0 PVC (. I �;! 4"IIPVG � � U 4"0 PVC CO 6"0 PVC �i_��... 4"0 PVC IPP (8 PI Tf ��—; 4.a P�� co 6"0 PVC 4"II PVc {i O -' �OI �101 o"OP�� 10) NAIL o i ,�TION; ;� U � � I, � —r,;, � ; a•e avc ' ' co � I I: 6•'0 PVC � `—'� 4"0 PVC UJ�'. CHECK-1N/ 109 WAITING COFFEE MINI FRIC � EXISTING 2006 3 TON GAS ELECTRIC ROOF TOP. REMOVE ALL EXISTING SUPPLV AND RETURN AIR DUCTING BACK TO DROPS. INSTALL NEW R4 LINEO 90 AND CUT i 6 X 16 SCREENED OPENING IN THE TOP. PROVIDE NEW MERV 8 FILTERS, CHECK TEST AND START AND NOTIFV G.Q OF DERQENQES. 2O EXISTING RESTROOM EXHAUST SVSTEM TO BE REMOVED TO WALL CAP. REPURPOSE CAP FOR NEW DRVER VENT. PROVI�EAN� INSTALL4" DRVER VENTING TO RECESSE� WALL TERMINAL. O3 RELOCATEEXISTINGTHERMOSTAT. O NAIL CAPTURE EXHAUST SVSTEM: ROUTE 10" SHEET METAL EXHAUST DUCT DOWN WALL AND TRANSITION TO 10" PVC AT ROOR LEVEL. PROVIDE PVC CO AT BASE OF STACK. ROUTE PVC SCHEDULE 40 PIPING UNDER FLOOR AS SHOWN. STUB UP 50 CFM 4" PVC PIPES FOR EACH WORK STATION. SLOPE ALL PIPING BACK TO RISER AT a' PER FOOT. COORDINATE FINAL LOCATION OF CAPTURE EXHAUST CONNECTIONS TO TABLES WITH OWNER. ALL SAW CUTTWG AND PATCH WG BY HVAC CONTRACTOR. � PEDICURE CAPTURE EXHAUST SVSTEM: ROUTE 6" PVC PIPE DOWN WALL AN� INTO SLAB. CONTINUE BELOW SLAB TO PEDICURE CHAIR LOCATION AND STUB 4" PVC PIPES FOR EACH LOCATION. SLOPE ALL PIPING BACK TO RISER AT a" PER FOOT. PROVI�E CO IN RISER AT BASE OF STACK. COORDINATE CONNECTIONS TO CHAIRS WITH OWNER. O ERVWSTALLEDOVERRESTROOMSONPLATFORM, COORDINATE WITH G.C. 3 HVAC BELOW GRADE PLAN '�� SCALE: 1/4" = 1'-0" � (� Z � 4 W W Z C� Z W � � � W 0 a ` U U � � � C T N � � >N N Q W > � �' C �N ln(O � �� � r� � C (O OJ lIJ � d' c �� p� /��\ W O N Z u) I� v pU U c � � m O W � OMM'O U` � mQaLL W N N � � � .V/ W V � � �� V/ � No. ;� 10200395 �` � —� s.<.EOF Z� / 1 � siNoiAxr �G� � � � ; � m`�.5,`,�ONA��m`°°� 1� ✓ � nnnnmm 11/27/2019 n O a U w � O � � rn C � ^ � Q � 0 Z � W Z � O w � w w Q o � o J Q Z r Q U (`') ('') O �� Q � OQ � Z } Q Q � '�^ Z V Z W v� c7 � N Q �U M100 Z Q a U Q > 2