HomeMy WebLinkAboutM100 HVAC PlanRELEA5E0 FOR CONSTRIICTI�N
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��V�lo•rvalM��_
onrE: 03/19/20
C ��
L �
Y� �
1
R�
-��`-'`���y O
Q
I FE
I
`�
O
r - 1
II y� II
L -�J
�
.
i
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
�
�
�
r- �
� �
' `
��,,
u r�r ,, ,
� �—� � �
1
1
1
1
�
�
�
�
1
1
1
1
1
1
1
I
I
r =n�
il ;K li
L — J
� I,,_E
� �N
— — � I
,� HVAC DEMOLITION PLAN ���
SCALE: 1/4" = 1'-0" i
2 HVAC PLAN ,�-
SCALE: 1/4" = 1'-0" ��`"�
GENERALNOTES:
104
HALL
I03
UTILITY
�
1. REFERENCESHEETM-0�iFORLEGENDS,
ABBREVIATIONS, SPEQFICATIONS AND NOTES.
2. REFERENCE SHEET M-001 FOR OETAILS AND
SCHEDULES.
3. DEMOLITION PLANS ARE DIAGRAMMATIC AND
BASED ON LIMITED SURVEV DATA. HVAC
WNTRACTOR SHALL VISIT SITE, EXAMINE ALL
PLANS AND DETERMINE E%ISTING ELEMENTS
TO REMAIN AND EXISTING TO BE REMOVED AS
NEE�ED TO MEET DESIGN INTENT. HVAC
CONTRACTOR SHALL �ISPOSE OF ALL
REMOVED HVAC COMPONENTS. PRIOR TO ANV
DEMOLITION, CONTRACTOR SHALL
COORDINATE WITH G C.
4. PRIOR TO ROl1GH IN HVAC CONTRACTOR
SHALL ATTEN� MEETING WITH OWNER AN�
G.G AND COORDINATE ALL FlNAL LOCATIONS
AND CONNECTIONS FOR HVAC SVSTEMS.
KEY NOTES:
HAND WASH
II,
�
I�
1
>
n
106
lo� I
LINEN �i
��T
� i' 4"0 PVC
� CO
I 6"0 PVC
(.
I �;! 4"IIPVG � �
U
4"0 PVC
CO
6"0 PVC
�i_��... 4"0 PVC
IPP
(8 PI
Tf
��—; 4.a P��
co
6"0 PVC
4"II PVc
{i
O -' �OI �101
o"OP�� 10) NAIL
o i ,�TION;
;�
U
�
�
I, � —r,;,
�
; a•e avc
' ' co
� I I: 6•'0 PVC
�
`—'� 4"0 PVC
UJ�'.
CHECK-1N/ 109
WAITING COFFEE
MINI
FRIC
� EXISTING 2006 3 TON GAS ELECTRIC ROOF TOP.
REMOVE ALL EXISTING SUPPLV AND RETURN AIR
DUCTING BACK TO DROPS. INSTALL NEW R4 LINEO
90 AND CUT i 6 X 16 SCREENED OPENING IN THE
TOP. PROVIDE NEW MERV 8 FILTERS, CHECK TEST
AND START AND NOTIFV G.Q OF DERQENQES.
2O EXISTING RESTROOM EXHAUST SVSTEM TO BE
REMOVED TO WALL CAP. REPURPOSE CAP FOR
NEW DRVER VENT. PROVI�EAN� INSTALL4" DRVER
VENTING TO RECESSE� WALL TERMINAL.
O3 RELOCATEEXISTINGTHERMOSTAT.
O NAIL CAPTURE EXHAUST SVSTEM: ROUTE 10"
SHEET METAL EXHAUST DUCT DOWN WALL AND
TRANSITION TO 10" PVC AT ROOR LEVEL. PROVIDE
PVC CO AT BASE OF STACK. ROUTE PVC SCHEDULE
40 PIPING UNDER FLOOR AS SHOWN. STUB UP 50
CFM 4" PVC PIPES FOR EACH WORK STATION.
SLOPE ALL PIPING BACK TO RISER AT a' PER FOOT.
COORDINATE FINAL LOCATION OF CAPTURE
EXHAUST CONNECTIONS TO TABLES WITH OWNER.
ALL SAW CUTTWG AND PATCH WG BY HVAC
CONTRACTOR.
� PEDICURE CAPTURE EXHAUST SVSTEM: ROUTE 6"
PVC PIPE DOWN WALL AN� INTO SLAB. CONTINUE
BELOW SLAB TO PEDICURE CHAIR LOCATION AND
STUB 4" PVC PIPES FOR EACH LOCATION. SLOPE
ALL PIPING BACK TO RISER AT a" PER FOOT.
PROVI�E CO IN RISER AT BASE OF STACK.
COORDINATE CONNECTIONS TO CHAIRS WITH
OWNER.
O ERVWSTALLEDOVERRESTROOMSONPLATFORM,
COORDINATE WITH G.C.
3 HVAC BELOW GRADE PLAN '��
SCALE: 1/4" = 1'-0" �
(�
Z
� 4
W
W
Z
C�
Z
W �
� �
W 0
a ` U
U � �
� C T N
� � >N N
Q W > �
�' C �N ln(O �
�� � r�
� C (O OJ lIJ �
d' c �� p� /��\
W O N Z u) I� v
pU
U c � � m
O W � OMM'O
U` � mQaLL W
N
N
�
�
�
.V/
W
V
� �
��
V/
�
No. ;�
10200395 �` � —�
s.<.EOF Z� / 1 �
siNoiAxr �G� � � � ; �
m`�.5,`,�ONA��m`°°� 1� ✓ �
nnnnmm
11/27/2019
n
O
a
U
w
�
O
�
�
rn
C
� ^
� Q �
0 Z �
W Z
� O w
�
w w Q
o � o
J
Q
Z
r
Q
U
(`')
('')
O
��
Q �
OQ
� Z
} Q
Q �
'�^ Z
V
Z W
v�
c7 �
N Q
�U
M100
Z
Q
a
U
Q
>
2