Loading...
HomeMy WebLinkAbout191107 Clay Nails PlumbingSYMBOLS PIPING LMETVPES COLD WATER DOMESTIC CW GAS NATURAL OR PROPANE GAS HEATMG WATER RETURN DOMESTIC HWR HEATING WATER SUPPLV DOMESTIC HW SANITARV SEWER SAN PIPING SVMBOLS ANCHORIHANGER 3E BALLVALVE � CHECK, SWING VALVE �� DROP BALANCING VALVE PENDANT STYLE FIRE SUPPRESSION HEAO U PIPE GUIOE PITCHDOWNINDIRECTIONOFARROW �� PWG VALVE � PRESSUREGAUGE P RISER �C RUN OUT OFF BOTTOM OF MAIN T RUNOUTOFFTOPOFMAIN � THERMOMETER � ABBREVIATIONS AFF ABOVE FINISHED FLOOR BTUH BRITISH THERMAL UNIT PER HOUR CA COMBUSTION AIR CO CLEAN OUT CW COLD WATER FD FLOOR DR41N FT FEET GC GENER4LCONTR4CTOR GM GAS METER GPM GALLONS PER MINUTE HW HOT WATER HWR HOTWATERRETURN IN INCH LAV LAVATORY MAN MANUAL MFR MANUFACTURER MC MECHANICALCONTRACTOR PC PWMBINGCONTR4CTOR PSI POUNDS PER SQUARE MCH RPM REVOWTIONSPERMINUTE SAN SANITARV SEWER SK SINK TMV THERMAL MIXING VALVE UON UNLESS OTHERWISENOTED VIF VERIFV W RELD VTR VENTTHORUGH ROOF WC WATER CLOSET WH WATERHEATER WS WATERSOFTENER RELEA5E0 FOR CONSTRIICTI�N Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel r �un��V�lo•rvalM��_ onrE: 03/19/20 GENERAL 1. BI� INSTRUCTIONS: CONTRACTORS SHALL PROVI�E BASE BID IN STRICTACCORDANCE WITH DESIGN BA515 EQUIPMENTAND MATERIALS. PROJECT DOES ENCOURAGE COMPETITIVE PRICING AND ALLOWS FOR SUBSTITUTIONS OF E�UAL EQUIPMENT AND MATERIALSAGAINSTTHEBASISOFDESIGN. SUBSTITUTEITEMS WILL BE COMPARED AGAWST DESIGN BASIS DURING SUBMITTAL PROCESS. ENGINEER RESERVES THE RIGHT TO REJECT SUBSTITUTIONS FOUND NOT TO BE EpUAL TO ITEMS LISTED IN DESIGN BASIS. 2. PRIORTOPROCUREMENTCONTRACTORSHALLSUBMITTO ARCHITECT FULL SUBMITTALS FOR ALL ENERGY CONSUMING OR PRODUCING ITEMS AN� FOR ALL PWMBING FI%TURES, VALVES. DRAINS, CLEAN OUTS, PIPMG, PIPMG ACCESSORIES, INSULATION AND PIPING HANGERS. SUeMITTALS SHALL BE DELMEATED WITH TAGS INDICATED ON PRINTS, CONTRACTORS NAME, PROJECT NAME. CLEARLV INDICATE ALL MO�EL NUMBERS AND ALL ACCESSORIES AN� OPTIONS BEING PROVIDED. SUBMISSIONS SHAL� BE IN PDF FORMAT.ENGINEER RESERVES THE RIGHT TO REJECT ANV SUBSTITUTE ITEM. 3. CONTRACTOR SHALL BE RESPONSIBLE TO VISIT THE SITE TO EXAMINE ALL CONOITIONS THAT MAV IN ANY WAV AFFECT THE EXEWTIONOFHISWORK. HESHALLALSOE%AMINETHEDRAWINGS AND SPEGIFlGATIONS FOR OTHER BRANCHES OF WORK MAKWG REFERENCE TO THEM FOR DETAILS OF EXISTING BUILDING CON�ITIONS. NOEXTRASWILLBEALLOWEDFORFAILURETO INCW DE ALL REOUIREO WORK IN THE BIO. CONTR4CTOR SHALL GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO CONTRACT FOR A PERIOD OF ONE (1) VEAR FROM DATE OF ACCEPTANCE. 4. THE DRAWINGS IN THIS SECTION ARE DIAGRAMMATIC ANO ARE NOT INTENDED TO DEFINE EXACT OUANTITIES, LOCATIONS OR CODIFIED REQUIREMENTS. DRAWINGS SHOW GENERAL INTENT OF SVSTEMS. P.G SHALL PROVIDE AND PAV FOR ALL REQUIRED PERMITS. 5. UPON COMPLETION OF THE PLUMBIN6 WSTALLATION. DEMONSTRATE TO THE ENGWEER AN�/OR THE OWNER'S SATISFACTION THAT THE SVSTEMS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE DRAWMGS, SPECIFICATIONS AND APPLICABLE CODES. DEMONSTRATE THE DVNAMIC OPERATION OF EACHSVSTEM. VERIFVPROPEROPERATIONOFEQUIPMENT, FILTERS ARE QEAN AND COMPONENTS OF THE SVSTEM ARE INSTALLE� AND ADJUSTED IN FULL ACCORDANCE W ITH MANUFACTURERRECOMMENDATIONS. 6. PLUMBING WORK SHALL BE COMPLETE IN EVERV DETAIL AND ALL MISCELLANEOUS ITEMS OF MATERIAL AN� LABOR NECESSARV TO COMPLETE THE WORK DESCRIBED, SHOWN OR REASONABLV IMPLIED ON DRAWINGS OR SPECIFICATIONS SHALL BE INCWDED IN THECONTRACT. CONTRACTORSHALLMAKEMINORADJUSTMENTS TO THE WORK W HERE REQUIRED, W HEN SUCH ADJUSTMENTS ARE NECESSARV FOR PROPER OPERATION AND WITHIN THE INTENT OF THE CONTRACL CONTRACTOR SHALL GUARANTEE ALL LABOR AND MATERIALS EMERING INTO CONTRACT FOR A PERIOD OF ONE (1) VEAR FROM DATE OF ACCEPTANCE. ]. ALL WORK SHALL BE M FULL ACCORDANCE WITH 2O12 INDIANA PWMBING CODE (INTERNATIONAL PWMBING CO�E 2006), 2010 INDIANA ENERGV CODE (200] ASHRAE 90.1), 2014 INDIANA FUEL GAS CODE (20121NTERNATIONAL FUEL GAS CODE) AND ALL PERTINENT STATE COUNTY, CITV CODES AND ORDINANCES WITH INDIANA AMENDMENTS. 8. PLUMBINGCONTRACTORSHALLACCEPTSOLEANDCOMPLETE RESPONSIBILITV FOR CONOITIONS OF THE JOB SITE, INCWDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. 9. DURINGCONSTRUCTIONALLPLUMBINGFIXTURESTRIMANDOTHER EQUIPMENT SHALL BE PROTECTED AGAINST DAMAGE OR INJURY. ANV FIXTURES OR EpUIPMENT DAMAGED AND ANV TRIM WITH MARRED OR SCRATCHED FlNISH SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER. 10. PLUMBING CONTRACTOR SHALL VERIFV AND BE RESPONSIBLE FOR ALL WATER, GAS, STORM ANO SEWER UTILITV ROUGH-WS AND SHALL CONSULT WITH THE CIVIL PLANS AND WITH LOCAL UTILITV COMPANV(S) PROVIDING ALL MATERIALS AND LABOR AND PAVWG ALL COSTS NOT BORNE BV THE LOCAL UTILITY COMPANV(S) FOR WSTALLATION OF SERVICES INCLUDING SECURINGAND PAVING FOR ALL REQUIRED PERMITS. 11. PWMBING CONTRACTOR SHALL ENSURE EMPLOVEES ARE MEETING AND DOWMENTMG ALL OSHA AND JOB SPEQFlC SAFETY REQUIREMENTS AS RW UIRED BV LAW AND BY WNTRACT. PERSONAL PROTECTNE EpUIPMENT SHALL BE PROVIDED AND UTILIZED AS REQUIRED. MECHANICAL CONTRACTOR SHALL PAV ALL FMES LEVIED BV OSHA FOR FAILURE TO COMPLV WITH OSHA REQUIREMENTS. 12. ALLPLUMBINGMATERIALSINSTALLEOINRETURNAIRPLENUMS SHALL BE INSTALLED OR COVERE� WITH MATERIALS AS REQUIRED TO PROVIDE FLAME RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED INDEX OF NOT MORE THAN 50. PRIOR TO ROUGH-IN CONSULT WITH M.Q TO VERIFV ALL LOCATIONS OF RETURN AIR PLENUMS. 13. FURNISH AND INSTALL ACCE55 PANELS FOR ALL CONCEALEO EQUIPMENT, PIPMG VALVES, CLEANOUTS, ETC. ACCESS PANELS SHALL BE OF SUFFlCIENT SIZE TO PROVIDE ADEQUATE WORKING QEARANCE ANO ACCE55. 14. PLUMBINGCONTRACTORSHALLBERESPONSIBLEFORALL REQUIRED CUTTING AND PATCHING WCWOMG SAW WTTMG AND PATCHING OF E%ISTING FLOORS AS REQUIRED TO ACCEPT NE W ROORING. 15. UNLESSOTHERWISENOTED,ROUTEALLPIPINGASHIGHAS POSSIBLE AND ROUTE PERPENOICULAR AND/OR PARALLEL TO BWLDING STRUCTURE. EQUIPMENT 1. PROVIDEEQUIPMENTASSHOWNONEQUIPMENTSCHEDULESAND PLAN NOTES. SUBSTITUTIONS TO LISTED EQUIPMENT SHALL BE AT RISK OF CONTRACTOR. SUBSTITUTIONS SHALL ONLV BE ALLOWED IF ITEMS ARE EQUAL IN ALL ASPECTS. 2. PROVIDESUBMITTALSTOELECTRICIANASRE�UIREDFOR COORDINATION OF ALL REQUIRED ELECTRICAL POWER WIRING. WCW DE WIRING DIAGRAMS AND CABLING REOUIREMENTS FOR REFERENCE. COORDINATE ALL INTERLOCKS AS NEEOED. PROVIDE � S WGLE POINT CONNECTION KI �S AS PCEDED. 3. WSTALLALLEQUIPMENTMFU.I.aCCOR�ANCEWITH S".�ATIONS AND CLEARANCE ____..._._.. ._._ ___... REQUIREMENTS. PROVIOEALL REpl11RE� MOl1NTING OR HOUSEKEEPING PA�S. G.Q SHALL PROVIOE LEVEL GRADE FOR EMERIOR MOUNTED EQUIPMENT. P.G SHALL PROVIDE ALL HOISTING AND RIGGING NEEDE� TO SETALL PWMBING EpUIPMENT. 4. ALL EQl11PMENT SHALL BE INSTALLED AS NEEDED TO PREVENT OBJECTIONABLE NOISEAND/OR VIBRATION. P.G SHALL PROVIDE VIBRATION PADS, SPRING ISOLATORS, ATTENUATORS AND ACCESSORIES AS NEEDED. 5. PROVIDE ALL BLOCKING, HANGERS, SHELVES, BRQCKETS ETC. AS REQUIRED TO INSTALL ALL PWMBING EpUIPMENT. 6. INSTALL WATER HEATERS IN ACCORDANCE WITH NFPA-10. AND THE NATIONALELECTRICALCODE PROVIDEBRASSDRAINVAWE3/4" RELIEF VALVE AND COLO WATER DIP TUBE WSTALL HEATERS PER MANUFACTURES INSTALLATION INSTRUCTIONS. PROVIDE SHUT-OFF VALVES FOR SERVICE WORK. 1. THERMOSTATS ON WATER HEATER SHALL NOT BE USED FOR LIMITING HOT WATERTEMPERATURES. P C. SHALL PROVIDE MIXING VALVES FOR HOT WATER TO ALL HANDS-FREE FAIICETS ACCESSIBLE TO OCCUPANTS. MI%ING VALVE SVSTEMS SHALL LIMIT WATER TEMPERATURE AT FAUCETS TO 110 DEG E OR LESS. 8. PROVIDESCHEOULE40PVCPIPINGANDFITTINGSFORALL COMBUSTION AIR AN� VENT PIPING IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS ON ALL DIRECT VENT WATER HEATERS OR BOILERS. RXTURES 1. REFERENCE FIXTURE SCHEDULES ON PLANS AND PROVIDE ALL REQUIRED CARRIERS. BLOCKING, HANGERS, TAIL PIECES, TRAPS, RISERS, ESCUTCHEONS, GRIDS, Pl1TTV, GASKETS, CAl1LKING, ETC. AS RE�UIRED TO INSTALL ALL PLUMBING RXTURES. 2. REVIEWSUBMITTALSFORALLOWNERPROVIDEDWUIPMENTAND PROVIDE ANV REQUIRED ACCESSORIES AS NEEOED FOR A COMPLETE INSTALLATION. P C. SHALL BE RESPONSIBLE TO RECEIVE AND INSTALL ALL OWNER PROVIDED FI%TURES. 3 RXTUftES DESIGNATED FOft HANDICAPACCESSIBILITV SHALL COMPLV WITH ANSI A 11].1, LATEST EDITION, WCLUDING AOOPTED INDIANA AMENDMENTS. 4. PROVIDE ALL CODE REQl11RED BACKFLOW DEVICES FOR PROCESS HVAC EQUIPMENT AND FOR WATER SERVING ANV �RINKING OR FOOD PREPARATION RXTURES. 5. PROVIDEBELLOWSTVPEWATERHAMMERARRESTERS,STAINLE55 STEEL CASHING AN� BELLOWS, 25� PSI, WSTALL PER P�I STANDARD wHzoi PIPING 1. ALL EXPOSEo SUPPLV PIPES AND METAL TRIM IN CONNECTION WITH THE FlXTURES SHALL BE CHROME PLATEO RED BRA55 OR BRONZE, PROVIDE CHROME PLATED STOP VALVES IN ALL SUPPLIES TO ALL FlXTURES. PLASTIC STOPS OR TRIM SHALL NOT BE ACCEPTABLE. CAULK ALL FI%TURES WITH WATERPROOF SILICONE CAULK. TRAPS SHALL HAVE QEANOUT PLU6S. INSTALL ONE PIECE CHROME ESCUTCHEON PLATE WITH SET SCREW AT WALL PENETRATIONS. Y�Iila511J141q 4FY[HJ4HyfRP18�41JL1\U:iill� L[H�JIJS.9iG1��-13 a. il4" PER FOOT FOR PIPES UP TO 2VT'. b. ll8" PER FOOT FOR PIPES 3" TO 6". c. ii16" PER FOOT FOR PIPES e" OR LARGER. MAINS AND LATERAL BRANCHES SHALL BE SLOPED TOWARD THE BUILDING DRAIN. ALL PIPING SHALL BE INSTALLED AND TESTED IN ACCORDANCE W ITH THE CIIRRENT P W MBING CODE AND PER THE AUTHORITV HAVING JURISDICTION. 3. CLEAN OUTS SHALL BE INSTALLED WITH W 5 OF THE FOUNDATIONS AN� AT THE BASE OF EACH STORM AN� WASTE STACK, AND AT NOT MORE THAN ]5 FOOT INTERVALS ON ALL HORIZONTAL RUNS, AT THE HIGH POINT OF THE BUILDMG DRAIN AND PER THE CURRENT PLUMBWG CODE. 4. VERIFVLOCATION,DEPTHANDSREOFSANITARVSEWER CONNECTIONPOINTS. CONNECTASREQUIRED.OUTSIDESEWER SHALL BE INSTALLED WITH MINIMUM OF 3'-0" COVER. COORDINATE CONNECTIONS WITH SITE CONTRACTORAND LOCAL UTILITY 5. ALL OUTSIOE WATER PIPING SHALL BE COVERED PER LOCAL REQUIREMENTS OR WITH A MINIMUM BELOW PREDICTED FROST LWE WHICH EVER IS GREATER. 6. ALL INTERIOR PIPING PENETRATIONS THROUGH WALLS, CEILMGS, ROOFS AND FLOORS SHALL BE SLEEVED AND SEALED. PROVIDE UL LISTED RRE STOPPING WHERE RWUIRED. 1. ALL EXTERIOR UNDERGROUND PENETRATIONS OF BUILDING FOUNDATIONS OR SLAB FLOORS SHALL BE SLEEVED ANO SEALED. PENETRATIONS BELOW GRAOE INTO THE BUILOMG SHALL BE DONE WITH MECHANICAL SEALS LIKE "LINK SEAL" OR EQUAL. 8. ALL PIPING PASSING THROU6H CONCRETE OR CINDER WALLS OR SUBJECT TO EXPOSURE TO CONCRETE SHALL BE TAPE�, SLEEVED OR INSULATED TO PREVENT DIRECT CONTACT W ITH CONCRETE. 9. NOPWMBINGPIPINGSHALLPASSOIRECTLVOVERELECTRICAL PANELS OR oISTRIBUTION CABINETS. PRIORTO ROUGH IN cooRoin�nrE wirn E.c. 10. DIELECTRIC UNIONS SHALL BE USED TO CONNECT OISSIMILAR METALS OR METAL PIPING SHALL HAVE METAL CONNECTIONS ON EACH END THREADED TO MATCH THE A�JACENT PIPING. METAL COMPONENTS SHALL BE SEPARATED BV A NVLON INSULATOR TO PREVENTCURRENTFLOW BETWEENDISSIMILARMETALS. UNIONS SHALL BE SUITABLE FOR THE SVSTEM OPER4TING PRESSURES AND TEMPERATURE WELO TVPE: ASTM A-234. 11. PIPING SLEEVES; INTERIOR OR EMERIOR ABOVE GRADE; GALVANIZED-STEEL-PIPE SLEEVES OR PVGPIPE SLEEVES. VERIFV, W ITH FIRE AUTHORITIES HAVING JURISDICTION, THAT PVC MATERIALS ARE ALLOWED FOR SLEEVES. BELOW GRADE; ALL; MECHANICAL GALVANIZED-STEEL PIPE SLEEVE SYSTEM LIKE LINKSEAL. ALL SLEEVES SHALL BE FlRE STOPPED OR CAULKED. EMERIOR SLEEVES SHALL PROVIDE WATER/AIR TIGHT PENETRATION SVSTEM. 12 PROVIDE HANGERS PER MSS AND IPC STANDARDS BASED ON PIPWG TYPES AND SIZES. WHERE EXPOSED TO VIEW IN PUBLIC SPACES, RODS SHALL BE GAWANIZED. 13. VALVES'. 2" AND SMALLER SHALL BE LIKE CRANE (3) PIECE 3800 SERIES BALL OR 438 SERIES GATE VALVES &V2' OR LARGER SHALL BE LIKE CRANE SERIES G3500 BALL OR 465 GATE VALVES. 14. UNIONS:PROVIDEANDINSTALLUNIONSASRWUIRE�FORTHE INSTALLATION AND REMOVAL OF ALL EQUIPMENT. 15. STOPS'. ALL RXTURES SHALL BE INSTALLED WITH METAL'-a TURN CHROME PLATED PLUMBING STOPS COMPATIBLE WITH PIPING MATERIAL SERVING FIXTURES. i6. PIPING MATERIALS UNLE55 OTHERWISE NOTED ON THE PLANS SHALL BE AS FOLLOW S: GAS ABOVEGRADE T'ANDSMALLER;BLACKSTEELSCHEDULE 40 TVPE E OR 5 PIPE GftADE B', ASTM A531 A53M. A105 OR A120WITHTHREAOEDENDS; FITTINGSSHALLBE MALLEABLE IRON THREADED FITTINGS ASTM Bi6.3 CLASS 150 WROUGHT-COPPERSOLDERJOINTFITTMGS: ANSIB1622 WATER WHEftEINOICATEDONTHEPLANS,WATERTUBINGSHALL BE TVPE A PEX WIRSBO, ZURN, NIBCO, OR UPONOR CONFORMING TO ASTM F8I6, FS]], E84. E814, ANSINL 263 AND NSF14/61. 100 PSIG AT 18� DEG. BWE FOR COLD AND RED FOR HOT AND RE-CIRCULATION W HITE FOR GENERIC. FlTTINGS SHALL BE PER ASTM F1960 LIKE UPONOR ProPEX COLD EXPANSION, PUSH TO FIT OR COPPER CRIMP WITH BRASS OR ENGINEERE� PLASTIC FITTINGS. MANIFOLDS WHERE USE� SHALL BE LIKE UPONOR ProPEX TYPE L TO ASTM FB]� W ITH BRASS OR EP BALL VALVES. WATER BUILDINGMAINSANDRISERSOUTSIDEOFWATERROOM2" AND SMALLER'. FLOW GUARD GOLD OR EQUAL SDR 11 CPVC; PIPING ASTM D 2846 WITH SOCKET WELDE� FITTINGS ASTM F 493. MADE FROM CPVC CELL CLA55 24448 ASTM D 1184. MANUFACTURED PER NSF 14 AND 61. SEWERNENT POLVVINYLCHLORIDESEWERPIPE(PVC):ASTM026fi5, ASTM F 1866 SCHEDULE 40 SOLID CORE DRAIN WASTE AND VENT WITH PVC SOCKET WELDED FITTINGS DESIGNEDTO FIT PIPMG DIAMETERS. ALL PIPWG IN RETURN AIR PLENUMS SHALL CONFORM TO REQUIREMENTS FOR PLENUM MATERIALS. 1. ALL PIPING INSULATION MATERIALS SHALL HAVE A FLAME SPREA� RATWG OF 25 OR LESS (ON THE FLAME SPREAD TEST SCALE) AND SMOKE DEVELOPMENT OF 50 OR LESS (ON THE SMOKE TEST SCALE) OR AS DERNED BV NFPA 255 STANDARD METHOD OF TESTING OF SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS, LOCAL CODES AND LOCAL AIITHORITIES HAVING JURISDICTION. ALL PVC PIPING LOCATED IN RETURN AIR PLENUM SPACES OR E%POSED SHALLBE WSULATED. 2. INSTALLALL INSULATION IN STRICTACCORDANCE WITH MANUFACTURERS WSTRUCTIONS IN A TIGHT AND NEAT MANOR. NO SAGGING, FR4VED OR TORN INSIILATION WILL BE EXCEPTED. 3. ALL INSULATION R-VALUES SHALL MEET THE CURRENT ENERGV CODE REQUIREMENTS. UNLESS OTHERWISE NOTED ON PLANS PIPING SVSTEMS SHALL BE INSULATED AS FOLLOWS: a. HOT WATER RE-CIRCULATION SVSTEMS; ALL HW AND HWR PIPING SHALL BE INSULATED b. NON RE-CIRCULATION HOT WATER STORAGE SVSTEMS; THE FlRST B FEET OF HW AND CW PIPING CONNECTED TO THE STORAGETANK. a COPPER WATER PIPING; ALL PIPING HOT OR COLO SHALL BE INSULATED. d. HEATTRACEDPIPINGALLHEATTRACE�SECTIONS. e. PLASTIC PIPING BELOW GRAOE; ALL HW, CW, HWR PIPING. EXCEPTIONS: THE TUBING FROM THE CONNECTION AT THE TERMINATION OF THE FlXTURE SUPPLV PIPING TO A PWMBING FIXTURE OR PWM8ING APPLIANCEPIPING FROM USER-CONTROLLED SHOWER AND BATH MIXING VALVES TO THE WATER OUTLETS. 4. STORM WATER PIPING EXPOSE� IN BUILDING SHALL BE INSULATED FOR SOUN� W ITH MINIMUM z' THICK ELECTROMETRIC CLOSE� CELL INSULATION. 5. INSULATION MATERIALS: a. PRE-FORMED TVPE I, 850 DEG F MINERAL OR GLASS FlBERS BONDE� WITH A THERMOSETTING RESIN AND HMGE� WITH SELF SEALING LAP. COMPLV WITH ASTM C 54], TVPE I, GRADE A, WITH FACTORV-APPLIED ASJ. b. FLEXIBLE ELASTOMERIC CLOSED CELL OR EXPANDED RUBBER PIPE MSULATION WITH PRESSURE SENSITNE A�HESNE SVSTEM, ASTM C534, ASTM E84 CLASS A 300 DEG F. a EMERIORIEXPOSED JACKETS: UV RESISTANT PVC PIPE JACKETS AND PREFORMED FITTING COVERS COMPLIANT WITH ASTM D25], D638, D]9�, D]92, Di]86, D36]9, E86AN� E136. FlRE STOPPING. a. FIRE STOPPING SVSTEMS SHALL BE IN FULL COMPLIANCE W ITH SECTIONS ]14 OF THE IBC AND SECTION 315 OF THE IPC. b. CONTRACTOR SHALL MAKE REFERENCE TO ARCHITECTURAL PLANS AND PROVIDE ALL REQUIRED RRE STOPPING SVSTEMS. a CONTRACTOR SHALL PROVI�E AHJ WITH FULL SUBMITTAL INDICATING METHODS OF CONSTRUCTION AND UL LISTINGS FOR EACH RW UIRED FlRE STOP SVSTEM. tl. ACCESSDOORSRWUIREDINCEILINGSOF FIRE-RESISTANCE-RATED FLOOR/CEILING ANO ROOF/CEILING ASSEMBLIES SHALL BE TESTED IN ACCORDANCE WITH ASTM E 119 OR UL 263 AS HORIZONTAL ASSEMBLIES AND LABELED BVANAPPROVEDAGENCYFORSUCHPURPOSE. 1. LABEL ALL MAJOR PIECES OF EOUIPMENT WITH LAMACOID PLASTIC, BLACK WITH WHITE LETTERS. SIZE TO BE CONSISTENT W ITH E�UIPMENT BEING LABELED. LENGTH AND WIDTH VARV FOR RWUIRED LABEL CONTENT. 2. PW MBING CONTRACTOR SHALL FURNISH ALL TOOLS, INSTRUMENTS AND EQUPMENT REOUIRE� FOR TESTING PIPMG. ALL TESTING SHALL BE �ONE PRIOR TO CONCEALMENT. ALL PARTS OF THE SANITARV DRAINAGE SVSTEM SHALL BE TESTED AS REQUIRED BV LOCAL PWMBING INSPECTORS. ALL WATER PIPING SHALL BE HVDROSTATICALLV TESTED TO MINIMUM 125 PSIG. 3. CLOSE OUT�. PROVIDE MANUFACTURERS OPERATION AND MAIMENANCE MANUALS ANo AS BUILT DRAWINGS. PROVI�E (i) TRAINING SESSION TO OWNER SELECTEo PERSONNEL AS REQUESTED AN� PROVI�E WARRANTV INFORMATION FORALL MANUFACTURERS WARRANTED EQUIPMENT 4. FlLLSYSTEMSWITHFRESHWATERAN�INSPECTALLCONNECTIONS FOR LEAKAGE. REMOVE ALL PACKING ANo PROTECTIVE SHIPPMG MATERIALS. 0.EAN ALL RXTURES AN� START-UP ALL WATER HEATERS, PUMPS, AND EQUIPMENT. VERIFV PROPER OPERATION. OPERATE ALL FAUCETS AND INSPECT STOPS, RISERS, TRAPS AND DRAINS. CORRECTALL LEAKS. WATER HAMMER AND VIBRATIONS AS RE�UIRED. � � a I I I ) � I . N �U ) d C� � � T N ) � N N ) W � C f C� � N N CO � tp � N ' � � (p W ln C � rn � 7 CO N /��, 1 U � Z O r v � d U c � � m � W y O M M'O �� �¢'aiiui W N � n Q - � r � � _ rn � V/ � : W V � �^` Wrn � v � No. ;_ 10200395 �- ,- s,<.EOF �i= � Ei/ 2� I � e i/ �/ m C9 c � o Ha �� -/ *S�ONA�.E?O., Y��/C •nmuminnnnm�o 11/27/2019 n O O� U W � � d P � n � Q � � Z � w Z � O W ti w � � � M M O � � Q � � Q � Z } Q Q � J K Z Z Z WC } � C Q (7 � J � Q U �U _� � Z Z Q � F Q U W LL � U m W ma Q � � � Z (n m J �m � J r a� P001 S.S. CLAMPING RING NON-INSULATEDPIPE �_ FY.`INGICIJI�[H:�I�[H STAINLESS STEEL WIRE MESH il4"xi/4•' -NON-WSULATED PIPE LAP SEALANT PIPE INSULATION MEMBRANE RASHING LAP SEALANT il2" (MINJ FOAM-IN�LACE URETHANE OR DOW CORNING #3-6548 SILICONE RTV RESILIENT FOAM PENETR. SEALANT IN PIPE SLEEVE 6 VENT THRU ROOF DETAIL SCALE:NONE REDUCER QF NECCESARV) AGA RATED GAS STOP l ELBOW � � ItlIyUD/y:ilyl�y�[HCI ELBOW PETES PWGS 6" DIRT LEG WITH CAP ROOF LINE MIRO PIPE STAND APPLIANCE � GAS CONNECTION DETAIL SCALE:NONE UP TO ABOVE CEILING, SEE PLAN FOR CONTIN. SEE PLAN FOR CONTW. 4l ry I FLOW CW � HW F��W 0 2"SS VERIFV W ITH EQUIPMENT � SIOUX CHIEF "LAUNDRV MINI" WATER HAMMER ARRESTOR (TYP. 6 PLCS.) � ACCESS PANEL TYPICAL � _ � 2 ss SLEEVE THRU SLAB TVP. SEE PLAN FOR CONTIN. 8 WASHER SUPPLY/DRAIN DIAGRAM SCALE:NONE RELEA5E0 FOR CONSTRIlCTION Su6jec��o compliance with allregula�ions of S�a�e antl Local Codes City of Carmel � �un��\i�lo.va�M��_ onrE: 03/19/20 BALLVALVE CHECKVALVE FROM HOT WATER SUPPLV BRANCH TO HOT WATER RETURN MAIN FLOW SCHEDULE MARK FLOW �TV TOTAL SRE GPM GPM F1 2 1 2 �12,• 3 HOT WATER RETURN DETAIL SCALE:NONE FWSH COVER FIN. FLOOR CLEANOUTPLUG ADJUSTING COLLAR AND BODV, SEE SPECS. � PVC RISER PVC WYE ( WYE W ITH REDUC W G IF MAIN IS OVER 4'� PVC BEND FULL SIZE, 4" MAX. P W G IF END OF LME FLOW — � 4 CLEANOUT DETAIL SCALE:NONE METALPROTECTION SHIELDS SUPPORT CHAIR BOLTED TO CHANNEL HANGING RODS Yz"MIN. NUTS & LOCK WASHERS — STEELCHANNEL ADEpUATE TO CARRV LOAD � RIGID MOLDED RBERGLASS INSULATION INSULATED PWMBING PIPES. 5 TRAPEZE HANGER DETAIL SCALE:NONE GENERALNOTES: 1) PROTECTION SADDLES SHALL BE COPPER CLAD IF COPPER TIIBE IS USED. 2) PROVIDE INTERMEDIATE HANGING ROD SUPPORT WHERE NUMBER OF PIPES EXCEED FlVE(5). NE%US UMS AUTOMATIC FLOW CONTROL VALVE SEE SCHEDULEFORGPMS. PLUMBING FIXTURE SCHEDULE (BID PURPOSE ONLY, PRIOR TO ORDER APPROVED SUBMITTAL IS REQUIRED) ITEM DESCRIPTION CW HW W (inch) Qnch) Qnoh) CO CLEANOUT�. SIOX CHIEF 852-'-PNR WITH ADJUSTABLE ROUND NICKLE BRONZE TOP _ _ SEE PLANS FD FLOOR DRAIN: SIOUX CMEF 832-'-PNQ W RH ADJUSTABLE SaUARE NICKLE BRONZE STRAINER. _ _ SEE PLANS W� WATER GLOSET' AMERICAN STANDARO COLONV RIGHT HEIGHP51AA.001, WHITE, i fi GPF, WITH RIGHTHEIGHT � ��p. - 3� ELONGATED BOWL 3251A 001R. CHl1RCH 255 WHT ELONGATED O/F. UCOVER, PLASTIC SEAT. LAVATORP. AMERICAN STANDARD �ECORUM 9024 008EC WALLHUNG LAVATORV WITH EVERCLEAN. WHITE FAUCET: LAV-0 AMERICAN ST�NO�RO ESTATE TWO�HANDLE WIDESPREA� LAVATORV ]]22801. PROVIOE ORAIN, MCGUIRE 8902 P�TRAP � V2" PT' 1-012' W ITH CLEANOUT, AND LAV-GUARO PIPE COVERS. LAV2 �AVATORV:AMERICANSTPNDARDAQUALVNWHITEDROPWSINKW/AMERICNNSTANDARDCOLONVCENTERSET ��p. ��p. �_��p.. FAUCET ANO MCGUIRE 8902 P-TRAP, 155A GRIO DRAIN, AND PROVIDE WITH LAV-GUARD PIPE COVERS. LAVd LMVATORV' AMERICANSTAN�AROUTILITVSINK,MODELFlAT20"FREESTANDINGPOLVETHVLENEOTILITYSWKWITH ��p^ �/p• �.�/p^ FFAUCET, P-TRAP AND SUPPLV LWES. WH WATER HEATER' BRAOFORD WHITE RTGK-060-Ni, TANKLE55 GAS WFTER HEATER, NATURAL GA5160,000 BTU, TEMPERATURE RISE 45`F, 0 96 VEF, SETTEMPERATURE 3l4" 3/4" TO 110°F, 120V/10 ELECTRICAL, 2" TW IN PIPE VENTING SVSTEM. g.� WASHER BOX (GUV GRAV-T2�O WASHING MACHME CONNECTION. RECESSEDWLD-ROLLED STEEL WITH WHITE ��p• ��p• p• POWER COAT FINISH, INTEGRQL SUPPLV VALVES ANO STANDPIPE DRAIN.) RP HOT WATER REQRCULATION PUMP, GRUN�FOS UP 1548 BS BRONZE HOT WATER REQRCULATION PUMP, V20 HP, 115 V, 3 GPM, 11'. V2" WS-0 DUPLEX WATER SOFTENER: BV OTHERS, AQUASVSTEMS 3l4" 3l4" PROVIDE STRAMERS, DRAINS, TAIL PIPES, TRAPS, CHROME WATER STOPS, AND STAMLESS STEEL FLEXIBLE RISER FOR ALL FlXTURES. PROVIDE SHUT OFF VALVES ANO UNIONS FOR ALL EQUIPMENT. �.. �� I � I � �'vi \ 4'� � �\ I �� � � LAV2 � � I � �L �� g„ ti.7 � � I � 3"VTF� � � CO LAV3 � � � T �� � LAV3 � I� �� I � � FD-2 ,.� WCi `°w�� �9 3� >I I��T � �y �an --� � >I � � � ,���� a/`r° WCi�� ,,, I �I ��I �I I �� � w j'� i � > � � y,� SPACHAIR �I �I ' I I � I � P�anc AiR� � I `� �I i� I .s�srs P-TRAP � I �� vl )I � ��� �sW� ��2., �;�_^� �,��� � co i LAV1 W81 _I^Q � � U ti�s�" � LAV1 �� �.� SPACHAIR I - I > P�PACHAIR� � �I I ��� P-TRAP p � I I SPACHAIR U � '� P-TRAP I SPACHAIR � I P-TRAP SPA CHAIR � �" � CO P-TRAP SPA CHAIR P-TRAP HOT WATER RETURN FROM FIXiURES 1" H&CW, SEE PLANS FOR CONTINUATION 1" BALL VALVE IN ACCESSIBLE LOCATION THERMOMETER 2GALLONTHERMALEXPANSION TANK WITH NSF LINER. ASME RATED TEMPERATURE & PRESSURE RELIEF VALVE. EXTEND FULL-SIZED DISCHARGE TO SPILL INTO MOP SINK 3/4" DRAIN VALVE � I 1 � ���2., r' I � 2 GAS TANKLESS WATER HEATER SCALE:NONE ,� BUILDING ISOMETRIC SCALE:NONE 1-1/2" LOW PRESSURE NATURAL GAS SUPPLY, SEE PLANS FOR CONTINUATION CONCENTRIC VENT-SEE HVAC DWGS SECURE TO WALL PER MANUFACTURER'S RECOMMENDATIONS 1-1/2" AGA RATED GAS VALVE IN ACCESSIBLE LOCATION INSTANTANEOUS GAS WATER HEATER- RINNAI MODEL R94LSi REDUCER, LOCATE WITHIN 3" OF WATER HEATER CONNECTION ( TYP X 3) UNION (TYPX3) 8" LONG CAPPED DIRT LEG c� Z a' Q W W Z C� Z W � � W Q L O U d � � � T 4J V% � >N N Q W > � °i% � � N � (p � �'._--� � I� � � C(O W N C tn d V (O N � W O N Z� r� p U � � � � � a �% C N � W � O M M a U' � �QdLL W Q� N � O � � � N � � � �� V/ � No. �� f� ��2�0395 �@ s =�` / \ .A.sor s imoinxP �G�:` � % / . % �,S/ONALE.oe000 , _ � ,t / ` 11/27/2019 � O P U w � � � P � n � Q � � Z � W Z Z � . C� N �yJ N � W W Q 0 � 0 � J Q Z r Q U c") M O �� Q � Q 0 Q '�^�z V Z w v� �� N Q ^U P002 � z Q w J � O � W J 2 Q U � �w c7 � Z m � � J a e V � � — _ � �E%. CW TO REMAIN ,� PLUMBING DEMO PLAN ��� SCALE: 1 /4" = 1'-0" i IO� `UTILITY �z r2--_ aL �. r__� � � � Z.. W84 _p� J I ��'"" — �' I 04 Z �'-o'a � HALL LAV- I UL V Z LICO 2 HAND WASH \ 1 � \ d � A ( �101 10) NAIL I TIONS t 1 � ( ) 1 � 1 � r �2"FD � �_� i s� - ---, i oz 5 I 5 J _I LAV-1 I06 `"�' � i .— � 4 TO ET � �i IU7 I ���b LINEN i I i � " g. _ 4 I�II � _ II yII 9 /_ ___::�' I � I �� I I I � � -�i�' � �i a I 08 ii �, (8) PEDICURE i I i STATIONS �ii � �_ � �i ��i �� I >%3.. �I�I _-, ��� �',b i �i , — ����i I6 I a I�I I - � �� __��!II �IOO BULKHEAD510'-0" CHECK-INI I 09 WAITING COFFEE 2 PLUMBING SANITARY PLAN ��� SCALE: 1/4" = 1'-0" i J 3 PLUMBING PIPING PLAN ��� SCALE: 1/4" = 1'-0" i �j ROUTE CONDENSATE PIPE TO ROOR DRAIN. BO ROUTE 1"COLD, 1" HOT WATER AND 1/2" HOT WATER RETURN LINES ABOVE CEILING TO PEDICURE CHAIR AREA. 9O ROl1TE 1/2"CW S VP'HW BR4NCH LINES DOWN EACH HVAC CHASE TO SERVE PEDICURE CHAIRS. C9 z � a W W Z � Z W � � W Q L O U d � � � a d �n o� >m � Q W > � °�y m � M �n cO � �p N r � j C(O W N C � tn d V (O N � W O N Z� r� p U O d V c � � m � W � O M M a c�� �¢'aiiui N � O � .� � W � � � �� � � No. �� +� ��2�0395 �@ �; � � s.A.EOF _ s iNoiAxP �G�:` � % / . % �,S/ONALE.oe000 , _ � ,t / ` 11/27/2019 � 0 P U w � � � d a � C� ^ � a � � Z � wz � O � � w w Q 0 � 0 � J Q z r Q U (� M O �� Q � 0 Q K Q � — Q � '�^z V Z WC � L r> � �n Q N � RELEA5E0 FOR CONSTRIICTI�N Su6jec��o compliance with allregula�ions of S�a�e antl Local Codes City of Carmel r �un��V�lo•rvalM��_ onrE: 03/19/20 GENERALNOTES: 1. REFERENCE SHEETP001FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCESHEETP002FORSCHEDULESAND DETAILS. 3. PRIOR TO ROUGH IN PW MBING CONTRACTOR SHALLATTEND MEETING WITH OWNERAND G.C. AND COORDINATE ALL FINAL LOCATIONS AND CONNECTIONS FOR PWMBING SVSTEMS. KEY NOTES: 1" WS-0 LAV-3 1-112�c�. �fQT c�3W4• � O cw � WH-0 � o a� � I w � � �RP- HAND WC-1 LAV-0 1O LOCATE EXISTING SANITARV LINE. ROUTE NEW 4" SANITARV LINE TO EXISTING. 2O COORDINATE TRENCH CUT TO ACCOMMODATE SANITARV BELOW GRADE. O REMOVE EXISTING FIXTURES IN THISAREA. REMOVE SANITARV SERVING FIXTURES TO BELOW GR4DE AND CAP. REMOVE COLD AND HOT WATER LINES SERV WG FIXTURES BACK TO MAIN AND CAP. O ROUTE 2" SANITARV PIPE UP TO CHAIR DRAIN CONNECTION WITH 1-014" VENT. ROUTE VENTS UP HVAC CHASES, COORDINATE WITH M.G. SEE SHEET P002 BWLDING ISOMETRIC. TVPICAL. OS ROUTE T' VENT PIPE UP WALL. LAV-1 ' 6O ROUTE NEW 1"GAS LINE FROM GAS MAIN UP TO ROOF ROUTE PIPE DOWN FROM ROOF TO WATER , HEATER. LINEN ( �101 10) NAIL p TIONS 0 (8 PE TA 1 � ( ) 1 � 1 � R�� j � S i i ,. �IOO BULKHEADS 10'-0" CHECK-INI 109 WAITING COFF� 104 p � LIC HALL OILET IOE �W P LIC -. �„ �,. , P100 � z a J a } � Q F Z Q � C7 z m � 7 J a