HomeMy WebLinkAbout191107 Clay Nails PlumbingSYMBOLS
PIPING LMETVPES
COLD WATER DOMESTIC CW
GAS NATURAL OR PROPANE GAS
HEATMG WATER RETURN DOMESTIC HWR
HEATING WATER SUPPLV DOMESTIC HW
SANITARV SEWER SAN
PIPING SVMBOLS
ANCHORIHANGER 3E
BALLVALVE �
CHECK, SWING VALVE ��
DROP
BALANCING VALVE
PENDANT STYLE FIRE SUPPRESSION HEAO U
PIPE GUIOE
PITCHDOWNINDIRECTIONOFARROW ��
PWG VALVE �
PRESSUREGAUGE P
RISER �C
RUN OUT OFF BOTTOM OF MAIN T
RUNOUTOFFTOPOFMAIN �
THERMOMETER �
ABBREVIATIONS
AFF ABOVE FINISHED FLOOR
BTUH BRITISH THERMAL UNIT PER HOUR
CA COMBUSTION AIR
CO CLEAN OUT
CW COLD WATER
FD FLOOR DR41N
FT FEET
GC GENER4LCONTR4CTOR
GM GAS METER
GPM GALLONS PER MINUTE
HW HOT WATER
HWR HOTWATERRETURN
IN INCH
LAV LAVATORY
MAN MANUAL
MFR MANUFACTURER
MC MECHANICALCONTRACTOR
PC PWMBINGCONTR4CTOR
PSI POUNDS PER SQUARE MCH
RPM REVOWTIONSPERMINUTE
SAN SANITARV SEWER
SK SINK
TMV THERMAL MIXING VALVE
UON UNLESS OTHERWISENOTED
VIF VERIFV W RELD
VTR VENTTHORUGH ROOF
WC WATER CLOSET
WH WATERHEATER
WS WATERSOFTENER
RELEA5E0 FOR CONSTRIICTI�N
Su6jec� �o compliance with all regula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��V�lo•rvalM��_
onrE: 03/19/20
GENERAL
1. BI� INSTRUCTIONS: CONTRACTORS SHALL PROVI�E BASE BID IN
STRICTACCORDANCE WITH DESIGN BA515 EQUIPMENTAND
MATERIALS. PROJECT DOES ENCOURAGE COMPETITIVE PRICING
AND ALLOWS FOR SUBSTITUTIONS OF E�UAL EQUIPMENT AND
MATERIALSAGAINSTTHEBASISOFDESIGN. SUBSTITUTEITEMS
WILL BE COMPARED AGAWST DESIGN BASIS DURING SUBMITTAL
PROCESS. ENGINEER RESERVES THE RIGHT TO REJECT
SUBSTITUTIONS FOUND NOT TO BE EpUAL TO ITEMS LISTED IN
DESIGN BASIS.
2. PRIORTOPROCUREMENTCONTRACTORSHALLSUBMITTO
ARCHITECT FULL SUBMITTALS FOR ALL ENERGY CONSUMING OR
PRODUCING ITEMS AN� FOR ALL PWMBING FI%TURES, VALVES.
DRAINS, CLEAN OUTS, PIPMG, PIPMG ACCESSORIES, INSULATION
AND PIPING HANGERS. SUeMITTALS SHALL BE DELMEATED WITH
TAGS INDICATED ON PRINTS, CONTRACTORS NAME, PROJECT NAME.
CLEARLV INDICATE ALL MO�EL NUMBERS AND ALL ACCESSORIES
AN� OPTIONS BEING PROVIDED. SUBMISSIONS SHAL� BE IN PDF
FORMAT.ENGINEER RESERVES THE RIGHT TO REJECT ANV
SUBSTITUTE ITEM.
3. CONTRACTOR SHALL BE RESPONSIBLE TO VISIT THE SITE TO
EXAMINE ALL CONOITIONS THAT MAV IN ANY WAV AFFECT THE
EXEWTIONOFHISWORK. HESHALLALSOE%AMINETHEDRAWINGS
AND SPEGIFlGATIONS FOR OTHER BRANCHES OF WORK MAKWG
REFERENCE TO THEM FOR DETAILS OF EXISTING BUILDING
CON�ITIONS. NOEXTRASWILLBEALLOWEDFORFAILURETO
INCW DE ALL REOUIREO WORK IN THE BIO. CONTR4CTOR SHALL
GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO CONTRACT
FOR A PERIOD OF ONE (1) VEAR FROM DATE OF ACCEPTANCE.
4. THE DRAWINGS IN THIS SECTION ARE DIAGRAMMATIC ANO ARE NOT
INTENDED TO DEFINE EXACT OUANTITIES, LOCATIONS OR CODIFIED
REQUIREMENTS. DRAWINGS SHOW GENERAL INTENT OF SVSTEMS.
P.G SHALL PROVIDE AND PAV FOR ALL REQUIRED PERMITS.
5. UPON COMPLETION OF THE PLUMBIN6 WSTALLATION.
DEMONSTRATE TO THE ENGWEER AN�/OR THE OWNER'S
SATISFACTION THAT THE SVSTEMS HAVE BEEN INSTALLED IN
ACCORDANCE WITH THE DRAWMGS, SPECIFICATIONS AND
APPLICABLE CODES. DEMONSTRATE THE DVNAMIC OPERATION OF
EACHSVSTEM. VERIFVPROPEROPERATIONOFEQUIPMENT,
FILTERS ARE QEAN AND COMPONENTS OF THE SVSTEM ARE
INSTALLE� AND ADJUSTED IN FULL ACCORDANCE W ITH
MANUFACTURERRECOMMENDATIONS.
6. PLUMBING WORK SHALL BE COMPLETE IN EVERV DETAIL AND ALL
MISCELLANEOUS ITEMS OF MATERIAL AN� LABOR NECESSARV TO
COMPLETE THE WORK DESCRIBED, SHOWN OR REASONABLV
IMPLIED ON DRAWINGS OR SPECIFICATIONS SHALL BE INCWDED IN
THECONTRACT. CONTRACTORSHALLMAKEMINORADJUSTMENTS
TO THE WORK W HERE REQUIRED, W HEN SUCH ADJUSTMENTS ARE
NECESSARV FOR PROPER OPERATION AND WITHIN THE INTENT OF
THE CONTRACL CONTRACTOR SHALL GUARANTEE ALL LABOR AND
MATERIALS EMERING INTO CONTRACT FOR A PERIOD OF ONE (1)
VEAR FROM DATE OF ACCEPTANCE.
]. ALL WORK SHALL BE M FULL ACCORDANCE WITH 2O12 INDIANA
PWMBING CODE (INTERNATIONAL PWMBING CO�E 2006), 2010
INDIANA ENERGV CODE (200] ASHRAE 90.1), 2014 INDIANA FUEL GAS
CODE (20121NTERNATIONAL FUEL GAS CODE) AND ALL PERTINENT
STATE COUNTY, CITV CODES AND ORDINANCES WITH INDIANA
AMENDMENTS.
8. PLUMBINGCONTRACTORSHALLACCEPTSOLEANDCOMPLETE
RESPONSIBILITV FOR CONOITIONS OF THE JOB SITE, INCWDING
SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE
OF THE WORK.
9. DURINGCONSTRUCTIONALLPLUMBINGFIXTURESTRIMANDOTHER
EQUIPMENT SHALL BE PROTECTED AGAINST DAMAGE OR INJURY.
ANV FIXTURES OR EpUIPMENT DAMAGED AND ANV TRIM WITH
MARRED OR SCRATCHED FlNISH SHALL BE REPLACED AT NO
ADDITIONAL COST TO THE OWNER.
10. PLUMBING CONTRACTOR SHALL VERIFV AND BE RESPONSIBLE FOR
ALL WATER, GAS, STORM ANO SEWER UTILITV ROUGH-WS AND
SHALL CONSULT WITH THE CIVIL PLANS AND WITH LOCAL UTILITV
COMPANV(S) PROVIDING ALL MATERIALS AND LABOR AND PAVWG
ALL COSTS NOT BORNE BV THE LOCAL UTILITY COMPANV(S) FOR
WSTALLATION OF SERVICES INCLUDING SECURINGAND PAVING FOR
ALL REQUIRED PERMITS.
11. PWMBING CONTRACTOR SHALL ENSURE EMPLOVEES ARE MEETING
AND DOWMENTMG ALL OSHA AND JOB SPEQFlC SAFETY
REQUIREMENTS AS RW UIRED BV LAW AND BY WNTRACT.
PERSONAL PROTECTNE EpUIPMENT SHALL BE PROVIDED AND
UTILIZED AS REQUIRED. MECHANICAL CONTRACTOR SHALL PAV ALL
FMES LEVIED BV OSHA FOR FAILURE TO COMPLV WITH OSHA
REQUIREMENTS.
12. ALLPLUMBINGMATERIALSINSTALLEOINRETURNAIRPLENUMS
SHALL BE INSTALLED OR COVERE� WITH MATERIALS AS REQUIRED
TO PROVIDE FLAME RATING OF NOT MORE THAN 25 AND A SMOKE
DEVELOPED INDEX OF NOT MORE THAN 50. PRIOR TO ROUGH-IN
CONSULT WITH M.Q TO VERIFV ALL LOCATIONS OF RETURN AIR
PLENUMS.
13. FURNISH AND INSTALL ACCE55 PANELS FOR ALL CONCEALEO
EQUIPMENT, PIPMG VALVES, CLEANOUTS, ETC. ACCESS PANELS
SHALL BE OF SUFFlCIENT SIZE TO PROVIDE ADEQUATE WORKING
QEARANCE ANO ACCE55.
14. PLUMBINGCONTRACTORSHALLBERESPONSIBLEFORALL
REQUIRED CUTTING AND PATCHING WCWOMG SAW WTTMG AND
PATCHING OF E%ISTING FLOORS AS REQUIRED TO ACCEPT NE W
ROORING.
15. UNLESSOTHERWISENOTED,ROUTEALLPIPINGASHIGHAS
POSSIBLE AND ROUTE PERPENOICULAR AND/OR PARALLEL TO
BWLDING STRUCTURE.
EQUIPMENT
1. PROVIDEEQUIPMENTASSHOWNONEQUIPMENTSCHEDULESAND
PLAN NOTES. SUBSTITUTIONS TO LISTED EQUIPMENT SHALL BE AT
RISK OF CONTRACTOR. SUBSTITUTIONS SHALL ONLV BE ALLOWED IF
ITEMS ARE EQUAL IN ALL ASPECTS.
2. PROVIDESUBMITTALSTOELECTRICIANASRE�UIREDFOR
COORDINATION OF ALL REQUIRED ELECTRICAL POWER WIRING.
WCW DE WIRING DIAGRAMS AND CABLING REOUIREMENTS FOR
REFERENCE. COORDINATE ALL INTERLOCKS AS NEEOED. PROVIDE
�
S WGLE POINT CONNECTION KI �S AS PCEDED.
3. WSTALLALLEQUIPMENTMFU.I.aCCOR�ANCEWITH
S".�ATIONS AND CLEARANCE
____..._._.. ._._ ___...
REQUIREMENTS. PROVIOEALL REpl11RE� MOl1NTING OR
HOUSEKEEPING PA�S. G.Q SHALL PROVIOE LEVEL GRADE FOR
EMERIOR MOUNTED EQUIPMENT. P.G SHALL PROVIDE ALL
HOISTING AND RIGGING NEEDE� TO SETALL PWMBING EpUIPMENT.
4. ALL EQl11PMENT SHALL BE INSTALLED AS NEEDED TO PREVENT
OBJECTIONABLE NOISEAND/OR VIBRATION. P.G SHALL PROVIDE
VIBRATION PADS, SPRING ISOLATORS, ATTENUATORS AND
ACCESSORIES AS NEEDED.
5. PROVIDE ALL BLOCKING, HANGERS, SHELVES, BRQCKETS ETC. AS
REQUIRED TO INSTALL ALL PWMBING EpUIPMENT.
6. INSTALL WATER HEATERS IN ACCORDANCE WITH NFPA-10. AND THE
NATIONALELECTRICALCODE PROVIDEBRASSDRAINVAWE3/4"
RELIEF VALVE AND COLO WATER DIP TUBE WSTALL HEATERS PER
MANUFACTURES INSTALLATION INSTRUCTIONS. PROVIDE SHUT-OFF
VALVES FOR SERVICE WORK.
1. THERMOSTATS ON WATER HEATER SHALL NOT BE USED FOR
LIMITING HOT WATERTEMPERATURES.
P C. SHALL PROVIDE MIXING VALVES FOR HOT WATER TO ALL
HANDS-FREE FAIICETS ACCESSIBLE TO OCCUPANTS. MI%ING VALVE
SVSTEMS SHALL LIMIT WATER TEMPERATURE AT FAUCETS TO 110
DEG E OR LESS.
8. PROVIDESCHEOULE40PVCPIPINGANDFITTINGSFORALL
COMBUSTION AIR AN� VENT PIPING IN ACCORDANCE WITH
MANUFACTURERS INSTRUCTIONS ON ALL DIRECT VENT WATER
HEATERS OR BOILERS.
RXTURES
1. REFERENCE FIXTURE SCHEDULES ON PLANS AND PROVIDE ALL
REQUIRED CARRIERS. BLOCKING, HANGERS, TAIL PIECES, TRAPS,
RISERS, ESCUTCHEONS, GRIDS, Pl1TTV, GASKETS, CAl1LKING, ETC.
AS RE�UIRED TO INSTALL ALL PLUMBING RXTURES.
2. REVIEWSUBMITTALSFORALLOWNERPROVIDEDWUIPMENTAND
PROVIDE ANV REQUIRED ACCESSORIES AS NEEOED FOR A
COMPLETE INSTALLATION. P C. SHALL BE RESPONSIBLE TO RECEIVE
AND INSTALL ALL OWNER PROVIDED FI%TURES.
3 RXTUftES DESIGNATED FOft HANDICAPACCESSIBILITV SHALL
COMPLV WITH ANSI A 11].1, LATEST EDITION, WCLUDING AOOPTED
INDIANA AMENDMENTS.
4. PROVIDE ALL CODE REQl11RED BACKFLOW DEVICES FOR PROCESS
HVAC EQUIPMENT AND FOR WATER SERVING ANV �RINKING OR
FOOD PREPARATION RXTURES.
5. PROVIDEBELLOWSTVPEWATERHAMMERARRESTERS,STAINLE55
STEEL CASHING AN� BELLOWS, 25� PSI, WSTALL PER P�I STANDARD
wHzoi
PIPING
1. ALL EXPOSEo SUPPLV PIPES AND METAL TRIM IN CONNECTION WITH
THE FlXTURES SHALL BE CHROME PLATEO RED BRA55 OR BRONZE,
PROVIDE CHROME PLATED STOP VALVES IN ALL SUPPLIES TO ALL
FlXTURES. PLASTIC STOPS OR TRIM SHALL NOT BE ACCEPTABLE.
CAULK ALL FI%TURES WITH WATERPROOF SILICONE CAULK. TRAPS
SHALL HAVE QEANOUT PLU6S. INSTALL ONE PIECE CHROME
ESCUTCHEON PLATE WITH SET SCREW AT WALL PENETRATIONS.
Y�Iila511J141q 4FY[HJ4HyfRP18�41JL1\U:iill� L[H�JIJS.9iG1��-13
a. il4" PER FOOT FOR PIPES UP TO 2VT'.
b. ll8" PER FOOT FOR PIPES 3" TO 6".
c. ii16" PER FOOT FOR PIPES e" OR LARGER.
MAINS AND LATERAL BRANCHES SHALL BE SLOPED TOWARD THE
BUILDING DRAIN. ALL PIPING SHALL BE INSTALLED AND TESTED IN
ACCORDANCE W ITH THE CIIRRENT P W MBING CODE AND PER THE
AUTHORITV HAVING JURISDICTION.
3. CLEAN OUTS SHALL BE INSTALLED WITH W 5 OF THE FOUNDATIONS
AN� AT THE BASE OF EACH STORM AN� WASTE STACK, AND AT NOT
MORE THAN ]5 FOOT INTERVALS ON ALL HORIZONTAL RUNS, AT THE
HIGH POINT OF THE BUILDMG DRAIN AND PER THE CURRENT
PLUMBWG CODE.
4. VERIFVLOCATION,DEPTHANDSREOFSANITARVSEWER
CONNECTIONPOINTS. CONNECTASREQUIRED.OUTSIDESEWER
SHALL BE INSTALLED WITH MINIMUM OF 3'-0" COVER. COORDINATE
CONNECTIONS WITH SITE CONTRACTORAND LOCAL UTILITY
5. ALL OUTSIOE WATER PIPING SHALL BE COVERED PER LOCAL
REQUIREMENTS OR WITH A MINIMUM BELOW PREDICTED FROST LWE
WHICH EVER IS GREATER.
6. ALL INTERIOR PIPING PENETRATIONS THROUGH WALLS, CEILMGS,
ROOFS AND FLOORS SHALL BE SLEEVED AND SEALED. PROVIDE UL
LISTED RRE STOPPING WHERE RWUIRED.
1. ALL EXTERIOR UNDERGROUND PENETRATIONS OF BUILDING
FOUNDATIONS OR SLAB FLOORS SHALL BE SLEEVED ANO SEALED.
PENETRATIONS BELOW GRAOE INTO THE BUILOMG SHALL BE DONE
WITH MECHANICAL SEALS LIKE "LINK SEAL" OR EQUAL.
8. ALL PIPING PASSING THROU6H CONCRETE OR CINDER WALLS OR
SUBJECT TO EXPOSURE TO CONCRETE SHALL BE TAPE�, SLEEVED
OR INSULATED TO PREVENT DIRECT CONTACT W ITH CONCRETE.
9. NOPWMBINGPIPINGSHALLPASSOIRECTLVOVERELECTRICAL
PANELS OR oISTRIBUTION CABINETS. PRIORTO ROUGH IN
cooRoin�nrE wirn E.c.
10. DIELECTRIC UNIONS SHALL BE USED TO CONNECT OISSIMILAR
METALS OR METAL PIPING SHALL HAVE METAL CONNECTIONS ON
EACH END THREADED TO MATCH THE A�JACENT PIPING. METAL
COMPONENTS SHALL BE SEPARATED BV A NVLON INSULATOR TO
PREVENTCURRENTFLOW BETWEENDISSIMILARMETALS. UNIONS
SHALL BE SUITABLE FOR THE SVSTEM OPER4TING PRESSURES AND
TEMPERATURE WELO TVPE: ASTM A-234.
11. PIPING SLEEVES; INTERIOR OR EMERIOR ABOVE GRADE;
GALVANIZED-STEEL-PIPE SLEEVES OR PVGPIPE SLEEVES. VERIFV,
W ITH FIRE AUTHORITIES HAVING JURISDICTION, THAT PVC
MATERIALS ARE ALLOWED FOR SLEEVES. BELOW GRADE; ALL;
MECHANICAL GALVANIZED-STEEL PIPE SLEEVE SYSTEM LIKE
LINKSEAL. ALL SLEEVES SHALL BE FlRE STOPPED OR CAULKED.
EMERIOR SLEEVES SHALL PROVIDE WATER/AIR TIGHT
PENETRATION SVSTEM.
12 PROVIDE HANGERS PER MSS AND IPC STANDARDS BASED ON PIPWG
TYPES AND SIZES. WHERE EXPOSED TO VIEW IN PUBLIC SPACES,
RODS SHALL BE GAWANIZED.
13. VALVES'. 2" AND SMALLER SHALL BE LIKE CRANE (3) PIECE 3800
SERIES BALL OR 438 SERIES GATE VALVES &V2' OR LARGER SHALL
BE LIKE CRANE SERIES G3500 BALL OR 465 GATE VALVES.
14. UNIONS:PROVIDEANDINSTALLUNIONSASRWUIRE�FORTHE
INSTALLATION AND REMOVAL OF ALL EQUIPMENT.
15. STOPS'. ALL RXTURES SHALL BE INSTALLED WITH METAL'-a TURN
CHROME PLATED PLUMBING STOPS COMPATIBLE WITH PIPING
MATERIAL SERVING FIXTURES.
i6. PIPING MATERIALS UNLE55 OTHERWISE NOTED ON THE PLANS
SHALL BE AS FOLLOW S:
GAS ABOVEGRADE T'ANDSMALLER;BLACKSTEELSCHEDULE
40 TVPE E OR 5 PIPE GftADE B', ASTM A531 A53M. A105 OR
A120WITHTHREAOEDENDS; FITTINGSSHALLBE
MALLEABLE IRON THREADED FITTINGS ASTM Bi6.3 CLASS
150
WROUGHT-COPPERSOLDERJOINTFITTMGS: ANSIB1622
WATER WHEftEINOICATEDONTHEPLANS,WATERTUBINGSHALL
BE TVPE A PEX WIRSBO, ZURN, NIBCO, OR UPONOR
CONFORMING TO ASTM F8I6, FS]], E84. E814, ANSINL 263
AND NSF14/61. 100 PSIG AT 18� DEG. BWE FOR COLD AND
RED FOR HOT AND RE-CIRCULATION W HITE FOR GENERIC.
FlTTINGS SHALL BE PER ASTM F1960 LIKE UPONOR ProPEX
COLD EXPANSION, PUSH TO FIT OR COPPER CRIMP WITH
BRASS OR ENGINEERE� PLASTIC FITTINGS. MANIFOLDS
WHERE USE� SHALL BE LIKE UPONOR ProPEX TYPE L TO
ASTM FB]� W ITH BRASS OR EP BALL VALVES.
WATER BUILDINGMAINSANDRISERSOUTSIDEOFWATERROOM2"
AND SMALLER'. FLOW GUARD GOLD OR EQUAL SDR 11
CPVC; PIPING ASTM D 2846 WITH SOCKET WELDE�
FITTINGS ASTM F 493. MADE FROM CPVC CELL CLA55
24448 ASTM D 1184. MANUFACTURED PER NSF 14 AND 61.
SEWERNENT POLVVINYLCHLORIDESEWERPIPE(PVC):ASTM026fi5,
ASTM F 1866 SCHEDULE 40 SOLID CORE DRAIN WASTE AND
VENT WITH PVC SOCKET WELDED FITTINGS DESIGNEDTO
FIT PIPMG DIAMETERS. ALL PIPWG IN RETURN AIR
PLENUMS SHALL CONFORM TO REQUIREMENTS FOR
PLENUM MATERIALS.
1. ALL PIPING INSULATION MATERIALS SHALL HAVE A FLAME SPREA�
RATWG OF 25 OR LESS (ON THE FLAME SPREAD TEST SCALE) AND
SMOKE DEVELOPMENT OF 50 OR LESS (ON THE SMOKE TEST SCALE)
OR AS DERNED BV NFPA 255 STANDARD METHOD OF TESTING OF
SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS,
LOCAL CODES AND LOCAL AIITHORITIES HAVING JURISDICTION. ALL
PVC PIPING LOCATED IN RETURN AIR PLENUM SPACES OR E%POSED
SHALLBE WSULATED.
2. INSTALLALL INSULATION IN STRICTACCORDANCE WITH
MANUFACTURERS WSTRUCTIONS IN A TIGHT AND NEAT MANOR. NO
SAGGING, FR4VED OR TORN INSIILATION WILL BE EXCEPTED.
3. ALL INSULATION R-VALUES SHALL MEET THE CURRENT ENERGV
CODE REQUIREMENTS. UNLESS OTHERWISE NOTED ON PLANS
PIPING SVSTEMS SHALL BE INSULATED AS FOLLOWS:
a. HOT WATER RE-CIRCULATION SVSTEMS; ALL HW AND HWR
PIPING SHALL BE INSULATED
b. NON RE-CIRCULATION HOT WATER STORAGE SVSTEMS; THE
FlRST B FEET OF HW AND CW PIPING CONNECTED TO THE
STORAGETANK.
a COPPER WATER PIPING; ALL PIPING HOT OR COLO SHALL BE
INSULATED.
d. HEATTRACEDPIPINGALLHEATTRACE�SECTIONS.
e. PLASTIC PIPING BELOW GRAOE; ALL HW, CW, HWR PIPING.
EXCEPTIONS: THE TUBING FROM THE CONNECTION AT THE
TERMINATION OF THE FlXTURE SUPPLV PIPING TO A PWMBING
FIXTURE OR PWM8ING APPLIANCEPIPING FROM
USER-CONTROLLED SHOWER AND BATH MIXING VALVES TO THE
WATER OUTLETS.
4. STORM WATER PIPING EXPOSE� IN BUILDING SHALL BE INSULATED
FOR SOUN� W ITH MINIMUM z' THICK ELECTROMETRIC CLOSE� CELL
INSULATION.
5. INSULATION MATERIALS:
a. PRE-FORMED TVPE I, 850 DEG F MINERAL OR GLASS FlBERS
BONDE� WITH A THERMOSETTING RESIN AND HMGE� WITH
SELF SEALING LAP. COMPLV WITH ASTM C 54], TVPE I,
GRADE A, WITH FACTORV-APPLIED ASJ.
b. FLEXIBLE ELASTOMERIC CLOSED CELL OR EXPANDED
RUBBER PIPE MSULATION WITH PRESSURE SENSITNE
A�HESNE SVSTEM, ASTM C534, ASTM E84 CLASS A 300 DEG F.
a EMERIORIEXPOSED JACKETS: UV RESISTANT PVC PIPE
JACKETS AND PREFORMED FITTING COVERS COMPLIANT
WITH ASTM D25], D638, D]9�, D]92, Di]86, D36]9, E86AN�
E136.
FlRE STOPPING.
a. FIRE STOPPING SVSTEMS SHALL BE IN FULL COMPLIANCE
W ITH SECTIONS ]14 OF THE IBC AND SECTION 315 OF THE
IPC.
b. CONTRACTOR SHALL MAKE REFERENCE TO ARCHITECTURAL
PLANS AND PROVIDE ALL REQUIRED RRE STOPPING
SVSTEMS.
a CONTRACTOR SHALL PROVI�E AHJ WITH FULL SUBMITTAL
INDICATING METHODS OF CONSTRUCTION AND UL LISTINGS
FOR EACH RW UIRED FlRE STOP SVSTEM.
tl. ACCESSDOORSRWUIREDINCEILINGSOF
FIRE-RESISTANCE-RATED FLOOR/CEILING ANO ROOF/CEILING
ASSEMBLIES SHALL BE TESTED IN ACCORDANCE WITH ASTM
E 119 OR UL 263 AS HORIZONTAL ASSEMBLIES AND LABELED
BVANAPPROVEDAGENCYFORSUCHPURPOSE.
1. LABEL ALL MAJOR PIECES OF EOUIPMENT WITH LAMACOID PLASTIC,
BLACK WITH WHITE LETTERS. SIZE TO BE CONSISTENT W ITH
E�UIPMENT BEING LABELED. LENGTH AND WIDTH VARV FOR
RWUIRED LABEL CONTENT.
2. PW MBING CONTRACTOR SHALL FURNISH ALL TOOLS, INSTRUMENTS
AND EQUPMENT REOUIRE� FOR TESTING PIPMG. ALL TESTING
SHALL BE �ONE PRIOR TO CONCEALMENT. ALL PARTS OF THE
SANITARV DRAINAGE SVSTEM SHALL BE TESTED AS REQUIRED BV
LOCAL PWMBING INSPECTORS. ALL WATER PIPING SHALL BE
HVDROSTATICALLV TESTED TO MINIMUM 125 PSIG.
3. CLOSE OUT�. PROVIDE MANUFACTURERS OPERATION AND
MAIMENANCE MANUALS ANo AS BUILT DRAWINGS. PROVI�E (i)
TRAINING SESSION TO OWNER SELECTEo PERSONNEL AS
REQUESTED AN� PROVI�E WARRANTV INFORMATION FORALL
MANUFACTURERS WARRANTED EQUIPMENT
4. FlLLSYSTEMSWITHFRESHWATERAN�INSPECTALLCONNECTIONS
FOR LEAKAGE. REMOVE ALL PACKING ANo PROTECTIVE SHIPPMG
MATERIALS. 0.EAN ALL RXTURES AN� START-UP ALL WATER
HEATERS, PUMPS, AND EQUIPMENT. VERIFV PROPER OPERATION.
OPERATE ALL FAUCETS AND INSPECT STOPS, RISERS, TRAPS AND
DRAINS. CORRECTALL LEAKS. WATER HAMMER AND VIBRATIONS AS
RE�UIRED.
�
�
a
I
I
I
) �
I
. N �U
) d C�
� � T N
) � N N
) W � C
f C� � N N CO �
tp � N
' � � (p W ln C
� rn � 7 CO N /��,
1 U � Z O r v
� d U c � � m
� W y O M M'O
�� �¢'aiiui
W
N
� n
Q -
� r
� � _
rn �
V/
� :
W
V
� �^`
Wrn
� v
�
No. ;_
10200395 �- ,-
s,<.EOF �i= �
Ei/
2� I
�
e
i/ �/
m C9 c
�
o Ha
�� -/
*S�ONA�.E?O., Y��/C
•nmuminnnnm�o
11/27/2019
n
O
O�
U
W
�
�
d
P
�
n
� Q �
� Z �
w Z
� O W
ti
w
� � �
M
M
O
� �
Q �
� Q
� Z
} Q
Q �
J K Z
Z Z WC
} � C
Q (7 �
J � Q
U �U
_�
� Z
Z Q
� F
Q U
W LL
� U
m W
ma
Q �
� �
Z (n
m J
�m
�
J r
a�
P001
S.S. CLAMPING RING
NON-INSULATEDPIPE �_
FY.`INGICIJI�[H:�I�[H
STAINLESS STEEL
WIRE MESH
il4"xi/4•'
-NON-WSULATED PIPE
LAP SEALANT
PIPE INSULATION
MEMBRANE RASHING
LAP SEALANT
il2" (MINJ FOAM-IN�LACE
URETHANE OR DOW CORNING
#3-6548 SILICONE RTV
RESILIENT FOAM PENETR.
SEALANT IN PIPE SLEEVE
6 VENT THRU ROOF DETAIL
SCALE:NONE
REDUCER
QF NECCESARV)
AGA RATED GAS STOP l
ELBOW � �
ItlIyUD/y:ilyl�y�[HCI
ELBOW
PETES
PWGS
6" DIRT LEG
WITH CAP
ROOF LINE
MIRO PIPE STAND
APPLIANCE
� GAS CONNECTION DETAIL
SCALE:NONE
UP TO ABOVE CEILING,
SEE PLAN FOR CONTIN. SEE PLAN FOR CONTW.
4l ry
I FLOW
CW
� HW
F��W
0
2"SS
VERIFV W ITH
EQUIPMENT
�
SIOUX CHIEF "LAUNDRV MINI" WATER HAMMER
ARRESTOR (TYP. 6 PLCS.)
� ACCESS PANEL TYPICAL
� _ �
2 ss
SLEEVE THRU SLAB TVP.
SEE PLAN FOR CONTIN.
8 WASHER SUPPLY/DRAIN DIAGRAM
SCALE:NONE
RELEA5E0 FOR CONSTRIlCTION
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
�
�un��\i�lo.va�M��_
onrE: 03/19/20
BALLVALVE
CHECKVALVE
FROM HOT WATER
SUPPLV BRANCH
TO HOT WATER
RETURN MAIN
FLOW SCHEDULE
MARK FLOW �TV TOTAL SRE
GPM GPM
F1 2 1 2 �12,•
3 HOT WATER RETURN DETAIL
SCALE:NONE
FWSH COVER
FIN. FLOOR
CLEANOUTPLUG ADJUSTING COLLAR
AND BODV, SEE SPECS. � PVC RISER
PVC WYE
( WYE W ITH REDUC W G
IF MAIN IS OVER 4'�
PVC BEND
FULL SIZE, 4" MAX.
P W G IF END OF LME
FLOW
— �
4 CLEANOUT DETAIL
SCALE:NONE
METALPROTECTION
SHIELDS
SUPPORT CHAIR
BOLTED TO CHANNEL
HANGING RODS
Yz"MIN.
NUTS & LOCK
WASHERS —
STEELCHANNEL
ADEpUATE TO
CARRV LOAD �
RIGID MOLDED RBERGLASS
INSULATION
INSULATED PWMBING PIPES.
5 TRAPEZE HANGER DETAIL
SCALE:NONE
GENERALNOTES:
1) PROTECTION SADDLES SHALL BE COPPER CLAD IF COPPER TIIBE IS USED.
2) PROVIDE INTERMEDIATE HANGING ROD SUPPORT WHERE NUMBER OF
PIPES EXCEED FlVE(5).
NE%US UMS AUTOMATIC
FLOW CONTROL VALVE SEE
SCHEDULEFORGPMS.
PLUMBING FIXTURE SCHEDULE (BID PURPOSE ONLY, PRIOR TO ORDER APPROVED SUBMITTAL IS REQUIRED)
ITEM DESCRIPTION CW HW W
(inch) Qnch) Qnoh)
CO CLEANOUT�. SIOX CHIEF 852-'-PNR WITH ADJUSTABLE ROUND NICKLE BRONZE TOP _ _ SEE
PLANS
FD FLOOR DRAIN: SIOUX CMEF 832-'-PNQ W RH ADJUSTABLE SaUARE NICKLE BRONZE STRAINER. _ _ SEE
PLANS
W� WATER GLOSET' AMERICAN STANDARO COLONV RIGHT HEIGHP51AA.001, WHITE, i fi GPF, WITH RIGHTHEIGHT � ��p. - 3�
ELONGATED BOWL 3251A 001R. CHl1RCH 255 WHT ELONGATED O/F. UCOVER, PLASTIC SEAT.
LAVATORP. AMERICAN STANDARD �ECORUM 9024 008EC WALLHUNG LAVATORV WITH EVERCLEAN. WHITE FAUCET:
LAV-0 AMERICAN ST�NO�RO ESTATE TWO�HANDLE WIDESPREA� LAVATORV ]]22801. PROVIOE ORAIN, MCGUIRE 8902 P�TRAP � V2" PT' 1-012'
W ITH CLEANOUT, AND LAV-GUARO PIPE COVERS.
LAV2 �AVATORV:AMERICANSTPNDARDAQUALVNWHITEDROPWSINKW/AMERICNNSTANDARDCOLONVCENTERSET ��p. ��p. �_��p..
FAUCET ANO MCGUIRE 8902 P-TRAP, 155A GRIO DRAIN, AND PROVIDE WITH LAV-GUARD PIPE COVERS.
LAVd LMVATORV' AMERICANSTAN�AROUTILITVSINK,MODELFlAT20"FREESTANDINGPOLVETHVLENEOTILITYSWKWITH ��p^ �/p• �.�/p^
FFAUCET, P-TRAP AND SUPPLV LWES.
WH WATER HEATER' BRAOFORD WHITE RTGK-060-Ni, TANKLE55 GAS WFTER HEATER, NATURAL GA5160,000 BTU, TEMPERATURE RISE 45`F, 0 96 VEF, SETTEMPERATURE 3l4" 3/4"
TO 110°F, 120V/10 ELECTRICAL, 2" TW IN PIPE VENTING SVSTEM.
g.� WASHER BOX (GUV GRAV-T2�O WASHING MACHME CONNECTION. RECESSEDWLD-ROLLED STEEL WITH WHITE ��p• ��p• p•
POWER COAT FINISH, INTEGRQL SUPPLV VALVES ANO STANDPIPE DRAIN.)
RP HOT WATER REQRCULATION PUMP, GRUN�FOS UP 1548 BS BRONZE HOT WATER REQRCULATION PUMP, V20 HP, 115 V, 3 GPM, 11'. V2"
WS-0 DUPLEX WATER SOFTENER: BV OTHERS, AQUASVSTEMS 3l4" 3l4"
PROVIDE STRAMERS, DRAINS, TAIL PIPES, TRAPS, CHROME WATER STOPS, AND STAMLESS STEEL FLEXIBLE
RISER FOR ALL FlXTURES. PROVIDE SHUT OFF VALVES ANO UNIONS FOR ALL EQUIPMENT.
�..
��
I �
I � �'vi
\ 4'�
� �\
I ��
�
�
LAV2 � �
I
� �L
�� g„ ti.7 � � I �
3"VTF� � � CO LAV3 � � �
T ��
�
LAV3 � I�
�� I �
� FD-2 ,.� WCi `°w�� �9 3� >I I��T
� �y �an --� � >I �
� �
,���� a/`r° WCi�� ,,, I �I ��I �I I ��
� w j'� i � > � �
y,� SPACHAIR �I �I ' I I �
I � P�anc AiR� � I `� �I i�
I .s�srs P-TRAP � I �� vl )I �
��� �sW� ��2.,
�;�_^� �,��� � co
i LAV1
W81 _I^Q
� � U ti�s�"
� LAV1
��
�.�
SPACHAIR I - I
>
P�PACHAIR� � �I I ���
P-TRAP p � I I
SPACHAIR U � '�
P-TRAP I
SPACHAIR � I
P-TRAP
SPA CHAIR � �" � CO
P-TRAP
SPA CHAIR
P-TRAP
HOT WATER RETURN FROM FIXiURES
1" H&CW, SEE PLANS FOR
CONTINUATION
1" BALL VALVE IN ACCESSIBLE
LOCATION
THERMOMETER
2GALLONTHERMALEXPANSION
TANK WITH NSF LINER.
ASME RATED TEMPERATURE &
PRESSURE RELIEF VALVE.
EXTEND FULL-SIZED DISCHARGE
TO SPILL INTO MOP SINK
3/4" DRAIN VALVE
�
I
1
� ���2.,
r' I
�
2 GAS TANKLESS WATER HEATER
SCALE:NONE
,� BUILDING ISOMETRIC
SCALE:NONE
1-1/2" LOW PRESSURE NATURAL GAS
SUPPLY, SEE PLANS FOR CONTINUATION
CONCENTRIC VENT-SEE HVAC DWGS
SECURE TO WALL PER MANUFACTURER'S
RECOMMENDATIONS
1-1/2" AGA RATED GAS VALVE IN
ACCESSIBLE LOCATION
INSTANTANEOUS GAS WATER HEATER-
RINNAI MODEL R94LSi
REDUCER, LOCATE WITHIN 3" OF WATER
HEATER CONNECTION ( TYP X 3)
UNION (TYPX3)
8" LONG CAPPED DIRT LEG
c�
Z
a' Q
W
W
Z
C�
Z
W
� �
W
Q L O
U d �
� � T 4J
V% � >N N
Q W > �
°i% � � N � (p �
�'._--� � I�
� � C(O W N C
tn d V (O N �
W O N Z� r�
p U
� � � �
� a �% C N
� W � O M M a
U' � �QdLL W
Q�
N
�
O
�
�
�
N
�
� �
��
V/
�
No. ��
f�
��2�0395 �@
s =�` / \
.A.sor
s imoinxP �G�:` � % / . %
�,S/ONALE.oe000 , _ � ,t / `
11/27/2019
�
O
P
U
w
�
�
�
P
�
n
� Q �
� Z �
W Z
Z � .
C� N �yJ
N �
W W Q
0 � 0
�
J
Q
Z
r
Q
U
c")
M
O
��
Q �
Q
0 Q
'�^�z
V
Z w
v�
��
N Q
^U
P002
�
z
Q
w
J
�
O �
W J
2 Q
U �
�w
c7 �
Z
m
�
�
J
a
e
V
�
� — _
�
�E%. CW TO REMAIN
,� PLUMBING DEMO PLAN ���
SCALE: 1 /4" = 1'-0" i
IO�
`UTILITY �z
r2--_ aL
�. r__�
� � � Z..
W84 _p� J I
��'"" — �' I 04
Z
�'-o'a � HALL
LAV- I UL V Z LICO 2
HAND WASH
\
1 �
\ d
� A
( �101
10) NAIL
I TIONS
t
1 �
( )
1 �
1 �
r �2"FD
� �_� i
s� - ---, i
oz 5
I 5 J _I
LAV-1
I06 `"�' �
i .— � 4
TO ET � �i
IU7 I ���b
LINEN i I i
� " g.
_ 4
I�II
�
_ II yII
9 /_ ___::�' I �
I ��
I I
I � �
-�i�'
� �i a
I 08 ii �,
(8) PEDICURE i I i
STATIONS �ii
� �_ � �i ��i
�� I >%3..
�I�I
_-, ��� �',b
i �i
, — ����i
I6 I a
I�I I
- � ��
__��!II
�IOO BULKHEAD510'-0"
CHECK-INI I 09
WAITING COFFEE
2 PLUMBING SANITARY PLAN ���
SCALE: 1/4" = 1'-0" i
J
3 PLUMBING PIPING PLAN ���
SCALE: 1/4" = 1'-0" i
�j ROUTE CONDENSATE PIPE TO ROOR DRAIN.
BO ROUTE 1"COLD, 1" HOT WATER AND 1/2" HOT
WATER RETURN LINES ABOVE CEILING TO
PEDICURE CHAIR AREA.
9O ROl1TE 1/2"CW S VP'HW BR4NCH LINES DOWN
EACH HVAC CHASE TO SERVE PEDICURE CHAIRS.
C9
z
� a
W
W
Z
�
Z
W
� �
W
Q L O
U d �
� � a d
�n o� >m �
Q W > �
°�y m � M �n cO �
�p N r
� j C(O W N C
� tn d V (O N �
W O N Z� r�
p U
O d V c � � m
� W � O M M a
c�� �¢'aiiui
N
�
O
�
.�
�
W
�
� �
��
�
�
No. ��
+�
��2�0395 �@
�; � �
s.A.EOF
_
s iNoiAxP �G�:` � % / . %
�,S/ONALE.oe000 , _ � ,t / `
11/27/2019
�
0
P
U
w
�
�
�
d
a
�
C� ^
� a �
� Z �
wz
� O �
�
w w Q
0 � 0
�
J
Q
z
r
Q
U
(�
M
O
��
Q �
0 Q
K Q
� —
Q �
'�^z
V
Z WC
� L
r> �
�n Q
N �
RELEA5E0 FOR CONSTRIICTI�N
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��V�lo•rvalM��_
onrE: 03/19/20
GENERALNOTES:
1. REFERENCE SHEETP001FOR LEGENDS,
ABBREVIATIONS, SPECIFICATIONS AND NOTES.
2. REFERENCESHEETP002FORSCHEDULESAND
DETAILS.
3. PRIOR TO ROUGH IN PW MBING CONTRACTOR
SHALLATTEND MEETING WITH OWNERAND
G.C. AND COORDINATE ALL FINAL LOCATIONS
AND CONNECTIONS FOR PWMBING SVSTEMS.
KEY NOTES:
1" WS-0 LAV-3
1-112�c�. �fQT c�3W4• � O
cw � WH-0
� o a� �
I w � � �RP-
HAND
WC-1
LAV-0
1O LOCATE EXISTING SANITARV LINE. ROUTE NEW 4"
SANITARV LINE TO EXISTING.
2O COORDINATE TRENCH CUT TO ACCOMMODATE
SANITARV BELOW GRADE.
O REMOVE EXISTING FIXTURES IN THISAREA.
REMOVE SANITARV SERVING FIXTURES TO BELOW
GR4DE AND CAP. REMOVE COLD AND HOT WATER
LINES SERV WG FIXTURES BACK TO MAIN AND CAP.
O ROUTE 2" SANITARV PIPE UP TO CHAIR DRAIN
CONNECTION WITH 1-014" VENT. ROUTE VENTS UP
HVAC CHASES, COORDINATE WITH M.G. SEE SHEET
P002 BWLDING ISOMETRIC. TVPICAL.
OS ROUTE T' VENT PIPE UP WALL.
LAV-1 ' 6O ROUTE NEW 1"GAS LINE FROM GAS MAIN UP TO
ROOF ROUTE PIPE DOWN FROM ROOF TO WATER
, HEATER.
LINEN
( �101
10) NAIL
p TIONS
0
(8 PE
TA
1 �
( )
1 �
1 �
R�� j �
S i i ,.
�IOO BULKHEADS 10'-0"
CHECK-INI 109
WAITING COFF�
104 p � LIC
HALL OILET
IOE
�W P LIC
-. �„ �,. ,
P100
�
z
a
J
a
}
�
Q
F
Z
Q
�
C7
z
m
�
7
J
a