Loading...
HomeMy WebLinkAboutP1-100-PLUMBING-FLOOR-PLAN---FOUNDATION-AND-GROUND-FLOOR-Rev.0Z � K m � � a _ U W � m a m 0 rn � K � � � g o a a o � i z 3 4 � � I 1 I � FDG-� � WHVD-i,i \/ � �� I U p ORD I � LL �- 6"SPUP m� GPi I I f. I 15 � FDV � � CW OPEN TO ABOVE II S v I SP-1 -" S WCO � t vz• SPo � r 4" DS , � CO � � �4 � � FD-2 coo 11/2"NG ,� eo�, oRo cPi FLOOR ELEVATION 834 8 '—"". .__'��I�� oSGi WHVD-1 � 3 0 � � SS VS � � vs ss —. � Wco I Wco —� �� vs ss �� SS VS _ „� _ �� _ � wco wco � � �s �s � n GROUND FLOOR PLAN I uNORTH 3/32" = 1'-0" A P, , � ' �� O i __ i �" 13 GCO 12 � r-0 8" 6AN 8" 6/ NVERT 83�.95' 4,• v 11 � �J. �'�. II �� � RELEA5E0 FOR CONSTRUCTION Suhjec��o compliance with allregula�ions 04 S�a�e antl Local Codes City of Carmel , �{�n„� i,.�a�' \ onrE: 03/19/20 INVERT 832 9]' U2" SPD SS -0 a os FCO INVERT 835.50' I� FD2 4" DS 55 aP SAN � 6" � C ST INVERT 835.50' / d SAN�6" SAN— FCO a• os � INVERT 031.00' GCO � S$ n FOUNDATION PLAN %�NORTH Usisz,.=,,_o,. � SS SS � aP ap a � 6" SAN � 6" SAN ' SAN�" S/ \� FCO ^�-6" ST 6" ST� SANINVERT835.50'� A�� Fco sr 4" DS � [ 55 7 � B,1 Ai. DSC-1 I" I SS � INVERT835.50' -� 55 ss 4., ps J ss �"� O DRAWING NOTES 1 PIPING RUN IN TRUSS SPACE ABOVE. HOLD AS HIGH AS POSSIBLE. 2 DSC-1 LOCATED ABOVE GARAGE PODIUM DECK. 3 PROVIDE ORDINARY HAZARD GP-1 SPRINKLER SYSTEM IN GROUND FLOOR STORAGE. 4 PIPING BELOW FLOOR. 5 PROVIDE BALL VALVE ON COLD WATER RISER. 6 PROVIDE CONNECTION TO PIPING PROVIDED UNDER GAR4GE PACKAGE. 7 PIPING PROVIDED UNDER GARAGE PACKAGE. 8 HOT AND COLD WATER SUPPLIES FROM FIRST FLOOR. 9 PIPINGABOVECEILINGANDABOVE CEILWG INSULATION. 10 STUB AND CAP COLD WATER FOR FUTURE USE. 11 PROVIDE CAPPED PIPING FOR FUTURE. 12 PROVIDE CONNECTION TO PIPWG PROVIDED BY CIVIL CONTRACTOR. 13 PIPING BELOW FLOOR. 14 WATER SUPPLY FROM FIRST FLOOR. 15 COORDINATE FOR EXPANSION OF 3" AT EXPANSION JOINT. 16 UP TO UNIT ABOVE. 17 INDICATES AREAS OF GAS METERS PROVIDED BY VECTREN. 18 PROVIDE CONNECTION TO OUTLET OF EACH METERAND EXTEND INDIVIDUAL SUPPLY TO EACH UNIT. 19 PIPING RUN ABOVE FINISHED CEILING, COORDINATE LOCATION WITH OTHER sPRwK�ER TRADES. suPP�v ro ZO RISE TO MECHANICAL CLOSET ABOVE cRouNo AND DROP TO UNITS ON GROUND FLOOR FLOOR. ` � 6F�P 21 RISER TO MECHANICAL CLOSETS ABOVE. 22 RISERS TO SERVE MECHANICAL UNITS �� rs ON FIRST THRU THIRD FLOOR. �23 PIPING RUN AT UNDERSIDE OF Fs STRUCTURE ABOVE. 24 PROVIDE 1-1/2" NG FROM METER TO SHELLED SPACE. TERMINATE AT SHELLED SPACE WITH VALVED STUB. 25 2" GAS TO SERVE TANKLESS WATER HEATERSLOCATED ON GROUNDTHRU THIRD FLOORS. 26 SUPPLY DOMESTIC HOT WATER TO MB-1 (MOPBASIN). WSTALLTHERMOSTATIC CONTROL VALVE ON SUPPLY PER DETAIL 1-P1-001. 27 3/4" COLD WATER SUPPLIED FROM FIRST FLOOR MECHANICAL CLOSET. 28 WH1 (WATER HEATER) MOUNTED IN LOCATION AS DIRECTED BY OWNER. PROVIDE COLD WATER SUPPLY TO ET1 AND HEATER AND HOT WATER SUPPLY � TO DWIFAUCET.EXTENDT&P DISCHARGE TO WHDP7 FOR INDIRECT DISCHARGE. PROVIDE ISOLATION VALVES ON COLD AND HOT WATER SUPPLIES. INVERT 835.50' SS 6" SP � I CSS � F� INVERT 829AP s � 4 % � \� 3 �U 1 2 NORTH KEY PLAN � G ��_ WOOLPERT axwirec.une�eNmxeexix��ceosrnru� 76351nterective Way Suite 100 Indianapolis, IN 46278 317.299.7500 FAX: 377.291.5805 novo�:: �;< . �r"o ,•G„�. IVo. Pc11tlOG2[% ;� - P uli�Tc(i' . n. F �� D C 4� � �� � W � � O W � W � � J •� W � a--� � V � � v . � � O a O � N � � ❑ � w` � �� � W � `o m �a � � � O C L � d U � � �� � m - U 0 Issuances: Proi. No.: 074904 Date: 10/24/18 A Sheet Name: PLUMBING FLOOR PLAN-FOUNDATION AND GROUND FLOOR P1-100