Loading...
HomeMy WebLinkAbout(16) M4-001Z � � m � � J a _ U W � v C � � m v 0 rn v � m K E � c U � N 0 a a` N � � z 3 � � 7 � � HVAC ABBREVIATION LEGEND PIPE SYMBOL LEGEND �CHWS� CHILLEDWATERSUPPLVPIPE �C� PIPEDOWN �CHWR� CHILLED WATER RETURN PIPE ��� PIPE UP �CWS� CONOENSERWATERSUPPLVPIPE �� TEE�OWN �CWR� CONDENSERWATERRETURNPIPE � TEEUP �DCW� �OMESTIC COLD WATER PIPE PIPE BREAK (FOR CLARITV) �HWS� HEATINGHOTWATERSUPPLVPIPE i CAPPEDPIPE �HWR� HEATING HOT WATER RETURN PIPE ,���-� GAS SHUT-OFF VALVE �GLVS� ICE WATER SUPPLV PIPE �� BALL VALVE �GLVR� ICE WATER RETURN PIPE t-����+ BUTTERFLV VALVE �DTS� DUALTEMPERATURESUPPLVPIPE 1 '�+ UNION �DTR� �UALTEMPERATURE RETURN PIPE �� CALIBRATED BALANCE VALVE �DHW� OOMESTIC HOT WATER PIPE ���� PRESSURE REGULATING VAVLE �V� VENTPIPE ^�v�r-1 GLOBEVALVE �G� NATURAL GAS PIPE i--H� GATE VAVLE �LPG� LIQUID PROPANE GAS PIPE �� STRAINER WITH BLOW DOWN VALVE �RL� REFRIGERANTLI�UIDPIPE �� STRAMER �RS� REFRIGERANTSUCTION PIPE �� BLIND FLANGE �RHG� REFRIGERANT HOT GAS PIPE . 4 + MOTORIZED 2-WAV VALVE �LPS� LOWPRESSURESTEAMPIPE � MOTORIZED 3-WAV VAWE �MPS� MEDIUM PRESSURE STEAM PIPE �HPS� HIGH PRESSURE STEAM PIPE �.� PRESSURE RELIEF VALVE �CR� CONDENSATE RETURN PIPE �FW-� FEED WATER PIPE (����� PRESSURE m THERMOMETER Y GAGE �4j��� P 'Y DUCTWORK SYMBOL LEGEND �I � �I � � RETURN AIR DUCT OFFSET MANUALBALANQNG DAMPER MOTORIZED DAMPER FIREDAMPER DESIGN CRITERIA �ENERAL DESIGN INFORMATION INDOOR DESIGN CONDITIONS BUILOING STAIRW ELL W INTER DRV BULB: 60.0°F LOCATION: CARMEL, INDIANA LATITUDE: 39.9] CORRIDORS AND TENANT ROOMS LONGITU�E: 86.13 ELEVATION: 853 WINTER DRV BULB'. ]O.O�F JUTDOOR DESIGN CONDITIONS wiNieR aHi: nMeieNi SUMMERDRVBULB: �5.0°F SUMMERDRV 913°F (04% ASHRAEDESIGN SUMMERRH o: 60% MAX BULB: CON�ITION) SUMMERWET ]5.0°F(04%ASHRAEDESIGN BUL6: CONDITION) W IMER DRY 2.6°F (996% ASHftAE DESIGN BULB: CONDITION) RELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel , �{�n„� i,.�a�' \ onrE: 03/19/20 � RECTANGULARTOROUNDTRANSI' �� RECTANGULARTF2ANSITION �}-� STANDARD RECTANGULAR ELBOW I I � (H) n � voi �� SUPPLV AIR DIFFUSER 1 � 1 (HARD CONNECTION) �� RETURN OR EXH. GRILLE ��� (HARD GONNECTION) SUPPLV OR OUTSIDE AIR DUCT UP I � 4� RADIUS RECTANGULAR ELBOW RETURNOREXHAUSTAIRDUCTUP i T/� SIIPPLVOROUT5IDEAIRROUND 0 _LW DUCTUP SUPPLVOROUTSIDEAIRDUCTDOWN ��(` RETURNOREXHAUSTAIRROUND ��� DUCTUP RETURNORE%HAUSTAIRDUCTDOWN � ROUNDDUCTDOWN SUPPLV/OUTSIOEAIRDUCTOFFSET � ROUNDOFFSET � ixanoioy�xa.r� � ROUNDWVE �� RECTANGULARBRANCHTAKEOFF 1 CJ RECTANGULARDUCTTERMINATION � ROUNDDUCTTERMINATION ANNOTATION SYMBOL LEGEND THERMOSTATORTEMP.SENSOR HUMIDISTAT 4 SECTION SVMBOL H-100 SW ITCH � KEVNOTE DESIGNATION RTU EQUIPMENT PLAN MARK 12 POINT OF NEW CONNECTION VAVTERMINALl1NITMARK 4 DETAILSVMBOL EQUIPMENTMARK H-`00 8"a ROUNDDUCTSIZE 24x12 RECTANGULAR DUCT SIZE AIR DEVICE AND DUCT ACCESS. LEGEND RETl1RN AIR GRILLE �� SUPPLV AIR OIFFUSER LII- i (HARDCONNECTION) SUPPLV AIR DIFFUSER W ITH FLEXIBLE � RETURN OR EXHAUST GRILLE RUNOUTANDDAMPER L��LJ (HARDCONNECTION) �� SIDEWALLDIFFUSER � 14X74TRANSFEROPENINGINWALL � TRANSFER OPENING IN WALL SCHEMATIC SYMBOL LEGEND �M��A� AIR VENT, MV-MANUAL VENT; AV- � AUTOMATIC VENT �AUTOMATIC 2WAV CONTROL VALVE �AUTOMATIC 3-WAV CONTROL VALVE � AUTOMATIC FLOW CONTROLLER �� CHECKVALVE �- REXIBLECONNECTION � GAUGE. T-TEMPERATURE; P-PRESSURE � MANUAL BALANCE VALVE � PIPE REDUCER/INCREASER � PRESSURE REDUCING VALVE �� SHUTOFFVALVE �� COMBINATION BALANCE-SHUTOFF VALVE TDV TRIPLEDUTVVALVE; �� SHUTOFF-BALANCECHECK � SAFETV RELIEF VALVE f DIRECTION OF FLOW PROJECT NOTES CONTROLNOTES: 1. PROVIDE PROJECT SPEqFIC CONTROL SVSTEM MANUAL FOR THE BUILDING. THE MANUAL SHALL CONTAIN A DIAGRAM OF THE CONTROL SVSTEM ARCHITECTURE, W IRWG DIAGRAMS AND A SEQUENCE OF OPERATION. THE MANUAL SHALLALSO INCLU�E AN 11 X 11 FLOOR PLAN INDICATING THE MAJOR EpUIPMENT AND PANEL LOCATIONS. THE MANUAL SHALL BE BOUND IN A HARD BACK 3 RING BINDER WITH DIVIDERS. BINDER SHALL BE LABELED "H V AL TEMPERATURE CONTROL MANUAC' AND INCLUDE THE PROJECT NAME AS W ELL AS THE BUILDING NAME, NUMBER ANO ADDRE55. 2. LABEL ALL CONTROL PANELS, ACTUATORS, SENSORS, ETC WITH 1I8" THICK PLASTIC LAMINATE SIGNS. SEE DRAW INGS FOR LABEL AND LETTERING REQUIREMENTS. LABEL DESIGNATIONS SHALL BE CONSISTENT WITH THE DRAWINGS, TEMPERATURE CONTROL SVSTEM MANUAL AND DIAGRAMS. 3. MOUNT WALL MOUNTED THERMOSTATS, TEMPERATURE SENSORS AND CARBON MONOXIOE SENSORS 4'-0" ABOVE FINISH FLOOR. DO NOT MOUNT THERMOSTATS OR TEMPERATURE SENSORS IN DIRECT SUNLIGHT OR NEAR HEAT PRODUqNG E�UIPMENT. 4. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL MOTOR STARTERS AND �ISCONNECT SW ITCHES FOR H.V.A.G EQUIPMENT UNLESS THEV ARE INCLUDED W ITH THE EQUIPMENT AS INDICATED ON THE DRAW INGS AND IN THE SPEQFICATIONS. COOR�INATE STARTER REQl11REMENTS WITH THE ELECTRICAL CONTRACTOR AND THE CONTRACTOR PRIOR TO ORDERING. S WHERE AUXILIARV CONTACTS ARE REQUIRED IN STARTERS PROVIDED BV THE ELECTRICAL CONTRACTOR, THE MECHANICAL CONTRACTOR SHALL COORDINATE THE QUANTITV AND TVPE OF CONTACTS W ITH THE EQ PRIOR TO PURCHASE. 6. THE ELECTRICAL CONTRACTOR SHALL PROVIDE CIRCUIT BREAKERS IN THE ELECTRICAL PANELS THAT ARE SPECIFlCALLV DEDICATED FOR THE TEMPERATURE CONTROL SVSTEM. COORDINATE THE QUANTITV AND SRES WITH THE CONTRACTOR. SEE ELECTRICAL DRAW INGS FOR LOCATION. �. THEMECHANICALCONTRACTORSHALLPROVIDEALLTEMPERATURECONTROLSVSTEMWIRIN6AND CONDUIT REGAROLE55 OF VOLTAGE AS REQUIREO TO PROVIDE THE SPECIFIED SEQUENCE OF OPERATION OR SATISFV ANV MANUFACTURER REQUIREMENTS. POW ER AND CONTROL W IRING AN� WNDUIT FOR VALVE ACTUATORS, DAMPER ACTUATORS, CARBON MONOXIDE SENSORS. TEMPERATURE CONTROL PANELS, RELAVS, INDICATOR LIGHTS, REMOTE CONTROL PANELS, SOLENOIO VALVES AND OTHER SIMILAR DEVICES THAT ARE PART OF THE H.V.A.0 SVSTEM SHALL BE PROVIDED BV THE MECHANICAL CONTRACTOR. SEE ELECTRICAL DRAWINGS FOR THE LOCATION OF CIRCUIT BREAKERS SPEQFICALLV DEDICATED FOR TEMPERATURE CONTROL SVSTEM COMPONENTS. ALL 120 V CONTROL WIRING SHALL BE INSTALLED IN CONDUIT. CONCEALED ABOVE CEILING PLENUM RATED LOW VOLTAGE (24 VOLTS OR LESS) CONTROL W IRING DOES NOT REQUIRE TO BE INSTALLED IN CONDUIT. 8. THEMECHANICALCONTRACTORSHALLPROVIDEALLCONTROLS,RELAVS,SENSORS,CONTROLLERS, CONTROLTRANSFORMERS,CONTROLIMERFACECOMPONENTS,SOFTWARE,HARDWARE, ACTUATORS, SW ITCHES AN� ANV OTHER CONTROL COMPONENTS REQl11RED TO PROVI�E THE SPECIFIED SEQUENCE OF OPERATIONS ON PLANS, TO WTEGRATE PROJECT CONTROLS AND SVSTEM, AND TO MEET EQUIPMENT MANUFACTURER'S INSTALLATION AND OPERATION REQUIREMENTS, UNLE55 NOTED OTHERWISE ON PLANS. 9. IT SHALL BE THE MECHANICAL CONTRACTORS RESPONSIBILITV TO COORDINATE ALL TEMPERATURE CONTROL SVSTEM REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR PRIOR TO THE PURCHASE OR INSTALLATION OF ANV OF THE ELECTRICAL POWER OR TEMPERATURE CONTROL SVSTEM COMPONENT. 10. ALL DAMPERS ON THE MLET OR OUTLET OF THE FAN SHALL BE OPEN PRIOR TO STARTING THE FAN. PROVIDE ANV TIME DELAVS OR END SWITCHES AS REQUIRED. 11. IN PUBLIC AREAS PROVIDE CLEAR PLASTIC VENTED IMPACT RESISTANT LOCKABLE GUARDS ON ALL WALL MOUNTED THERMOSTATS OR SENSORS WITH ADJUSTABLE SET-POINTS. IDENTIFICATION: 1. PROVIDE PLASTIC LAMINATE IDENTIFICATION LABELS ON ALL EQUIPMENT SCHEDULED ON THE DRAW INGS. THE IDENTIFICATION SHALL BE CONSISTENT WITH THE PLANMARKS SHOWN ON THE DRAW INGS AND THE BAS SVSTEM USER INTERFACE. SEE DETAILS ON DR4W INGS REGAROING COLOR, SIZE, TEXT HEIGHT, ETC. 2 PROVIOE PLASTIC LAMINATE I�ENTIFICATION LABELS ON ALL TEMPERATl1RE CONTROL COMPONENTS SUCH AS CONTROL PANELS, TEMPERATURE SENSORS, HUMIDITV SENSORS, ETC. THE IDENTIFICATION SHALL BE CONSISTENT W ITH THE PLANMARKS SHOW N ON THE �RAW INGS W HERE AVAILABLE AND THE BAS SVSTEM USER INTERFACE. SEE OETAILS ON DRAW INGS REGARDING COLOR, SIZE, TEXT HEIGHT, ETC. 3. PLASTIC LAMINATE SIGNS AND LABELS ON OUTDOOR EQl11PMENT SHALL BE FIXEO TO EQUIPMENT WITH STAMLESS STEEL OR AWMINUM RIVETS OR STAMLE55 STEEL OR PLATED SCREWS. 4. CLEANEOUIPMENTANDPIPINGPRIORTOAFFIXINGADHESIVETVPELABELSANDSIGNS. PROJECT NOTES GENERAL: 1. INSTALL THE H V A.G SVSTEM AS INDICATED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES. 2. COORDINATEALLWORKWITHOTHERTRADES.REWORKOFPIPING,DUCTWORKEQUIPMENT LOCATION, CONDUIT, ETG AS A RESULT OF POOR PLANNING. COOR�INATION OR SCHE�ULING SHALL BE THE RESPONSIBILITV OF THE INVOLVEO CONTRACTORS. NOTIFV THE ARCHITECTIENGINEER OF ANV CONFLICTS PRIOR TO START OF W ORK. 3. THE MECHANICAL CONTRACTOR SHALL BE RESPONSBLE FOR THE COORDINATION OF ANY FRAMING REVISIONS, E�UIPMENT LOCATIONS, ADDITION OF CONTROLS ELECTRICAL CIRCUITING REVISIONS, ETQ THAT RESULT FROM US WG EQUIPMENT OTHER THAN THOSE INDICATED ON THE DRAW INGS. APPROVAL OF THE SHOP DRAW INGS BV THE ARCHITECT/ENGINEER W ILL NOT WANE THE CONTRACTOR OF THIS RESPONSIBILITV. 4. THE MECHANICAL CONTRACTOR SHALL HAVE THE FINAL RESPONSIBILITV FOR SVSTEM START UP, TRAINING, WARRANTV AND TURN OVER TO THE OWNER. THE WNTRACTOR SHALL BE RESPONSIBLE FOR INSTRUCTING THE OWNER ON ANV ROUTME MAINTENANCE REQUIRED DURING THE WARRANTV PERIOD. 5. ALL ITEMS INCLUDED ON THESE DRAWINGS AND THE SPEGFlCATIONS SHALL BE INCLUDED IN THE CONTRACTORS BIO. ANV ITEMS THAT ARE UNCLEAR OR FOUND TO BE MCORRECT BV THE CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECTIENG WEER PRIOR TO THE BID DUE DATE EXCWSIONS OF WORK FROM THE BID ARE NOT ACCEPTABLE. 6. ALL WORK INDICATED ON THE MECHANICAL DRAW INGS SHALL BE PROVIDED BV THE MECHANICAL CONTRACTOR UNLESS SPECIFlCALLY NOTED OTHERW ISE. 7. THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL FIRESTOPPING FOR DUCT AND PIPE PENETRATIONS THAT PENETRATE FlRE RATED ASSEMBLIES. SEE ARCHITECTURAL DRAW INGS OR REFER TO THE O W NERS RECORD DR4W INGS FOR LOCATIONS OF FIRE RATED ASSEMBLIES. ALL FLOOR PENETRATIONS SHALL BE FlRESTOPPED AND SEALED WATER TIGHT WITH A FLEXIBLE SEALANT. INSTALL PER MFG. RECOMMENDATIONS. 8. THE MECHANICAL CONTRACTOR SHALL COORDINATE ANV ROOF PATCH WG FOR ANV MECHANICAL ROOF PENETRATIONS NOT SPEqRCALLV I�ENTIRED ON THE ARCHITECTURAL DRAW INGS. ALL PATCHING SHALL BE PROVIDED BV GENERAL CONTRACTOR AND BE PERFORMED IN A MANNER CONSISTENT W ITH THE ROOF SVSTEMS CURRENT WARRANTV REQUIREMENTS AND MANUFACTURERS RECOMMEN�ATIONS. 9. THE MECHANICAL CONTRACTOR SHALL NOT PERFORM ANV WELDING OR TORCH CUTTING OPERATIONS W ITHIN THE OCCUPIED BUILDING W ITHOUT OBTAINING PERMISSION OR A BURN PERMIT FROM THE OW NER. DUCTWORK-GENERAL: 1. ALL DUCTWORK SHALL BE CONSTRUCTED, INSTALLED AND SUPPORTED PER THE LATEST VERSION OF THE S.M.A.C.N.A. H V A.C. DUCT CONSTRUCTION STANDARDS. UNLESS SPECIFIEO MORE STRINGENTLV IN THESE CONSTRUCTION DOCUMENTS. 2 COORDINATION OF Dl1CT SVSTEM INSTALLATION WITH OTHER TRA�ES SHALL BE PERFORME� PRIOR TO THE FABRICATION OF ANV DUCTWORK. VERIFV DUCT CLEARANCES PRIOR TO FABRICATION. NOTIFV THE ARCHITECT/ENGWEER OF ANY CONFLICTS THAT RWUIRE DIMENSIONAL CHANGES OR REQUIRE MAJOR RELOCATION OF �UCTW ORK. 3. ALL DUCTWORK SHALL BE SUPPORTED FROM ROOF OR ROOR STRUCTUftE ABOVE DUCTWORK SHALL NOT LAV ON TOP OF CEILING OR LIGHT FIXTURES. 4. ALLDUCTWORKS¢ESSHOWNAREEMERNALDIMENSIONS.ALLOWANCEHASBEENMADEFOR 1" DUCTLW ER W HERE AND IF REQUIRED. S RECTANGULAR DUCTWORK SHALL BE SUPPORTED PER THE S.M A.QN.A. STAN�ARDS AND AT EACH CHANGE IN DIRECTION. EQUIPMENT-GENERAL 1. THE H V A.G E�UIPMENT AND SYSTEM SHALL NOT BE USED TO DURING CONSTRUCTION. THE WARRANTV PERIOD SHALL NOT BEGIN UNTIL SUBSTANTIAL COMPLETION. THE CONTRACTOR SHALL EXTENO THE EpUIPMENT WARRANTV PERIOD AS NECESSARV WHEN EQUIPMENT IS USED AFTER INITIAL START UP AND PRIOR TO SUBSTANTIAL COMPLETION. ��� � WOOLPERT 10.W IiERURElEN6dEERIXGI4E03P111LL 76351nterective Way Suite 100 G Indianapolis, IN 462%8 317.299.7500 FAX: 317.291.5805 .,�;_ . ., ,��-,. ,,r�1GrF C,[L�c �ci,•'r ,,'. ,. � No.P'c1!Off2C/ ; •� ��___.. _ ;e a��, Sf�T�CF /o. ; u�.�•!NUTAt1P.•'.�(i. ` "%9 �7 E l�; �i .:� �^ i^ � � � � � � � � � U � J • J � �--� � K � V � � � � � � m 0 O � c � L m � ❑ � �TT U �p Qi � � O N c o C � � o � L _ U _ N N U � � �� � m - U 0 Issuances: Proi. No.: 074904 Date: 11/12/18 A Sheet Name: HVACLEGEND M4-001