Loading...
HomeMy WebLinkAboutWoodhallSewerPermitPermit Type Project WO Project Name Project Developer Lift Station Treatment Plant Parcel Acreage EDU in Gallons Final Subdivision ENG5422008 Section Number Woodhall Lane Lot Number Woodhall Lane, LLC Address Number 08 Laurelwood Station Address 2 MIX Street City 310 Zip Code County Woodhall Lane F.3 . _ _ 10465 Woodhall Lane Carmel _____ 46032 Hamilton Local Sewer Charge - District Contribution 0.00 gUilde� � ���� Elevetl0� HoiilBS PlanReviewandlnspection 0.00 � ��� ��"��""����� � 15D.00 Phone Number Application Fee ....-.-..--... . EDII Fee 1908.00 Owner . Interceptor Fee 0.00 phone Number Other Fees 0.00 � � � � ��� Fees Due 2058.00 Occupant Invoice Number Phone Number PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench" phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's offce at 844-9200 24 hours in advance. All new construction will be placed on billing hvo months after connection has been made or when water is connected, whichever comes first. The building has: Main I�: WDH15-WDH14 Grease Trep Slab Foundation Grease Interceptor Crawl Space ��� Manhole IDs USMH WOH-is WDH-14 DSMH '� Grit Interceptor Basement YES Lid Elevation 868.91 ✓/ 8fi9.4 ✓ Grinder Station First Floor Elevation 872.00 J 872.00� Water Service City of Carmel Basement Elevation � 862.00 � � 862.00 `� Calculation is basetl on both Manhole Lid Elevations and fhe elevafion of the First Floor '�. � 3.09 ��� 2 60. Ft.', Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Ejector Pump � TriCo currently requires that an 1&I inspection is performed and a Certificate of Compliance is issued prior to occupancy / � i,�" sale of a properrty. Please review attached I!I Permit. �2 ✓ Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner. (/t� The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure. The terms of the conditional permit, if any, are listed below. Plans have been su6mitted. All fees have been paid. No certifcate of insurance required. No additional permits required. No manhole core permit required. The facilitV is not classifed as a FOG facility. (Notes) By signing below, I attest that 1 am Builder / Owner Signature, Printed Name Approved By ; Ryan Permit is valid fo� and agree to accept responsibility for all work done un"d�er this permit. �� PhoneNumber ��-Xy(�—G�7� YEAR from the date issued. Permit valid only with TriCo se 10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844920U t2X J1 /-2144-`JZUJ www.mco.eco Residential SANITARY SEWER PERMIT 999913586