HomeMy WebLinkAboutWoodhallSewerPermitPermit Type
Project WO
Project Name
Project Developer
Lift Station
Treatment Plant
Parcel Acreage
EDU in Gallons
Final Subdivision
ENG5422008 Section Number
Woodhall Lane Lot Number
Woodhall Lane, LLC Address Number
08 Laurelwood Station Address 2
MIX Street
City
310 Zip Code
County
Woodhall Lane
F.3
. _ _ 10465
Woodhall Lane
Carmel
_____ 46032
Hamilton
Local Sewer Charge - District Contribution 0.00 gUilde� � ���� Elevetl0� HoiilBS
PlanReviewandlnspection 0.00 � ��� ��"��""����� �
15D.00 Phone Number
Application Fee ....-.-..--... .
EDII Fee 1908.00 Owner .
Interceptor Fee 0.00 phone Number
Other Fees 0.00 � � � � ���
Fees Due 2058.00 Occupant
Invoice Number Phone Number
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's offce at 844-9200 24 hours in
advance. All new construction will be placed on billing hvo months after connection has been made or when water is
connected, whichever comes first.
The building has: Main I�: WDH15-WDH14
Grease Trep Slab Foundation
Grease Interceptor Crawl Space ��� Manhole IDs USMH WOH-is WDH-14 DSMH
'� Grit Interceptor Basement YES Lid Elevation 868.91 ✓/ 8fi9.4 ✓
Grinder Station First Floor Elevation 872.00 J 872.00�
Water Service City of Carmel Basement Elevation � 862.00 � � 862.00 `�
Calculation is basetl on both Manhole Lid Elevations and fhe elevafion of the First Floor '�. � 3.09 ��� 2 60. Ft.',
Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Ejector Pump �
TriCo currently requires that an 1&I inspection is performed and a Certificate of Compliance is issued prior to occupancy /
� i,�" sale of a properrty. Please review attached I!I Permit.
�2 ✓ Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner.
(/t� The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure.
The terms of the conditional permit, if any, are listed below.
Plans have been su6mitted.
All fees have been paid.
No certifcate of insurance required.
No additional permits required.
No manhole core permit required.
The facilitV is not classifed as a FOG facility.
(Notes)
By signing below, I attest that 1 am
Builder / Owner Signature,
Printed Name
Approved By ;
Ryan
Permit is valid fo�
and agree to accept responsibility for all work done un"d�er this permit.
�� PhoneNumber ��-Xy(�—G�7�
YEAR from the date issued. Permit valid only with TriCo se
10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844920U t2X J1 /-2144-`JZUJ www.mco.eco
Residential SANITARY SEWER PERMIT 999913586