HomeMy WebLinkAboutC-10 Schlenck- Roof SpecificationsSHEET:SCALE:DRAWINGS PROVIDED BY:DATE:11/05/2019Property address:Property Owner(s):Pride Construction LLC333 N. Alabama - Suite 350Indianapolis, IN 46204John SchlenkJamie Schlenk4882 Essex DriveCarmel, IN 46033ROOF FRAMING / TRUSS NOTES:ALL CONNECTIONS OF RAFTERS, JACK OR HIP TRUSSES TO MAIN GIRDER TO BEREINFORCED WITH SIMPSON STRONG-TOE HIP AND RICH METAL FASTENERS AND TOMEET CODE.ALL ROOF FRAMING 24" O.C.ALL OVERHANGS 18".ALL HIP AND RIDGE PRIMARY BEAMS TO BE DOUBLE 11.125 MEMBERSALL HIPS RAFTERS TO BE CONSTRUCTED OF 11.25" X 1.5" SPF #1 Grade lumber.ATTIC VENTILATION: REQUIRED ABOVE HOUSE.MIN. SNOW LOAD 50 LBs PER SQUARE FOOT.WALL HEADERS: (2) 2 X 10 DF 2 TYP. UNOROOF & FLOOR TRUSS MANUFACTURER: Site Build
SHEET:SCALE:DRAWINGS PROVIDED BY:DATE:11/05/2019Property address:Property Owner(s):Pride Construction LLC333 N. Alabama - Suite 350Indianapolis, IN 46204John SchlenkJamie Schlenk4882 Essex DriveCarmel, IN 46033Roof Layout For Hip roof system.Orange Colors indicate 3.5" double LVLBeams and Hip Carrier rafters.All Joints to be reinforced with appropriateSimpson Hip and Valley Metal Fasteners.
SHEET:SCALE:DRAWINGS PROVIDED BY:DATE:11/05/2019Property address:Property Owner(s):Pride Construction LLC333 N. Alabama - Suite 350Indianapolis, IN 46204John SchlenkJamie Schlenk4882 Essex DriveCarmel, IN 46033