HomeMy WebLinkAboutA015.1-SpecificationsTABLE OF CONTENTS
DIVISION 00: PROGUREMENT AND CONTRACTING REQUIREMENTS
00 70 00 CANDITIONS OF TNE CANTRACT (AIA A201-2007)
00 73 00 SUPPLEMENTARY CANDITIONS
DIVISION 01: GENERAL REQUIREMEN75
01 II 00 SUMMARY OF WORK
01 30 00 ADMINI57RA71VE REQUIREMENTS
01 40 00 QUALITY REQUIREMENTS
01 50 00 7EMPORARY FACILI71E5 AND CONTROLS
01 60 00 PRODUCT REQUIREMENTS
01 62 00 SUBSTITUTIONS AND PRODUC7 OPTIONS
01 70 00 D(ECUTION AND CLOSEOUT REQUIREMEN75
DIVISION 02: D(ISTING CANDITIONS
02 4113 SELECTIVE DEMOLITION
DIVISION 03: CANCRETE
03 05 00 CANCRETE FLOOR SEALER
03 30 00 CAST IN PLACE CANCRETE
03 54 00 CEMENTITIOUS UNDERLAYMENT
DIVISION 04: MASONRY - NOT USED
DIVISION 05: METALS
05 50 00 METAL FABRICATIONS
DIVISION O6: WOOD, PLASTICS, AND COMPOSITES
O6 10 00 MISCELLANEOUS ROUGFI CARPENTRY
O6 20 00 FINISFI GARPENTRY
O6 41 00 ARCFII7EC7URAL WOOD CASEWORK
DIVISION 07: TNERMAL AND M015?URE PROTECTION
07 90 05 JOINT SEALERS
/��'I�_�_��_n�,DAAI�'le� /'/1AIT�/1
DIVISION 08: OPENINGS
08 1112 NOLLAW METAL DOORS AND FRAMES
08 31 00 ACCE55 DOORS AND PANELS
�° ��'�� i n n �n ��NG rvvio� e�
��"� ;� A�NMINNM FF3�hl€B �T6�R€FF.6�NT
08 71 00 NARDWARE
08 83 00 MIRRORS
DIVISION 09: FINISNES
09 21 I6 GYPSUM BOARD ASSEMBLIES
Oq 30 00 71LE
Oq 51 00 ACOUSTICAL CEILIN65
09 68 00 CARPET
09 77 00 PREFINISFIED FIBERGLA55 WALL PANELS (F.R.P.)
09 90 00 PAINTS AND CAATINGS
09 97 23 CANCRETE FLOOR CAATINGS
DIVISION 10: SPECIALTIES
10 I4 00 SIGNAGE
DIVISION II: EQUIPMENT (NOT USED
DIVISION 12: FURNISNINGS (NOT USEDZ
DIVISION 13: SPECIAL CONSTRUCTION (NOT USEDZ
DIVISION 14: CANVEYING SYSTEMS (NOT USEDZ
DIVISION 15: MECNANICAL (REFER TO MECNANICAL DRAWINGSZ
DIVISION I6: ELECTRICAL (REFER TO ELECTRICAL DR4WINGSZ
RELEA5E0 FOR CONSTRIICTI�N
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��_
DATE: 03�20�20
DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS
SEGTION 00 70 00 - CONDITIONS OF THE CONTRAGT
A. GENERAL CONDITIONS= TNE GENERAL CONDITIONS OF TNE CONTRACT POR
CONSTRUCTION, AIA DOCUf'IENT A201� 2007 EDITION, IS A PART OF THIS
CONTRACT, AND SFJALL GOVERN WORK.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
A CONDITIONS AND RE�UIREMENTS�. GENERAL CONDITIONS, SUPPLEMENTARY
CONDITIONS AND DNISION 01 - GENERAL REQUIREI'1ENT5 CONTAIN WFORI"IATION
NECESSARY FOR COMPLETION OF EVERY PART OF FROJECT.
B. DIVISION 01: WNERE FROVISIONS OF GENERAL CONDITIONS RELATE TO PROJECT
ADI'11NISTR4TION OR WORK-RELATED REQUIREI'1ENT5 OP T41E CONTR4CT, T410SE
PARAGRAPNS EXPANDED IN DIVISION 01.
C. SUBCONTRACTORS- CONTRACTOR AGREES TO BIND SUBGONTRACTORS AND
MATERIAL SUPPLIERS TC TERMS OF GENERAL AND SUPPLEMENTARY CONDITIONS,
INCLUDING ARBITRATION.
D. INSURANCE- AS REQUIRED BY AND APPROVED BY OWNER.
E. MISCELLANEOUS DEFINITIONS-
1. APPROVED= REQUIRES WRITTEN AGTION BY ARGFJITEGT AS DO TERMS SUCFJ
AS "DIRECTED," "SELECTED," "REQUIRED," "ORDERED," "DESIGNATED,"
"AGGEPTED," "ACGEPTABLE," AND "SATISPAGTORY."
2 FURNISN: SUPPLY AND DELNER TO PROJECT, UNLE55 OTNERWISE
SPEQFlED.
3. MSTALL MAKE OPERATIONAL AT PROJECT FOR WTENDED USE, INCLUDING
UNLOADWG, MSPECTING AND COMPLETWG IN PLACE.
4. PROVIDE: FURNISN AND MSTALL COMPLETE AND READY FOR INTENDED
USE, UNLE55 OT4IERWISE SPEQFIED_
DIVISION OI: GENERAL REOUIREMENTS
SEGTION 01 11 00 - SUMMARY OF WORK
A SCOPE: PROJECT CONSISTS OF CONSTRUCTION OF TNE DSW STCRE AS
INDICATED IN CONTRAST DOCUI'1ENT5.
B. FIAZARDOUS MATERIALS: NAZARDOUS MATERIAL CONTAINMENT, REMOVAL AND
DISPOSAL ARE NOT MCLUDED M CONTRACT� OWNER WILL PROVIDE FOR
HANDLING OF NAZARDOUS I'�ATERIALS UNDER SEPARATE CONTRACT PRIOR TO
TF115 PROJEGT. NOTIFY OWNER IMMEDIATELY IF FIAZARDOUS MATERIALS ARE
SUSPECTED.
C. CONTRACTOR USE OF FREMISES: LIMITED TO AREAS INDICATED AND AS
SPEQFIED; LIMIT ACCE55 TO TNE PROJECL
D. LINES ANG LEVELS ENGINEERING�� ESTABLISN LINES AND LEVELS BY USE OF
RECOGNIZED ENGINEERING PRACTICES. LOCATE AND PROTECT CONTROL AND
REFERENCE POINTS.
E. REGULATORY REQUIREMENTS�. COMPLY WITN ALL APPLICABLE CCDE
REQUIREMENTS. INPORM ARCWTECT IM�1EDIATELY OP ANY
NON-CODE-COMPLYING CONDITIONS CBSERVED OR NOTED.
E STANGARDS: COMPLY WITN REFERENCEC STANDARDS EXCEPT WNERE MORE
RIGID REQUIREI'1ENT5 ARE REQUIRED BY CODE UNLE55 A SPEQFlC DATE IS
REFERENCED, TFJE ISSUE DATE CF TFJE STANDARD IS TL1AT DATE M EFFECT
WNEN TFIE DOCUMENTS ARE ISSUED.
G. OWNER-FURNISNED, CONTRACTOR-INSTALLED ITEMS (OFCI): OWNER WILL
ARRANGE AND PAY FOR DELNERY OF TNE IDENTIFlED PRODUCTS TO TNE
PROJECT SITE FOR INSTALLATION BY TFJE CONTRACTOR.
L CONTRACTOR SNALL INSPECT, RECEIVE, UNLOAD, STORE, INSTALL AND
PINISN AS INDICATED OR REQUIRED_
SECTION OI 30 00 - ADMINISTRATIVE REQUIREMENTS
A_ PROCEDURES: CONTRACTOR SNALL REVIEW AND APPROVE SUBMITTALS PRIOR
TO SUBI"IITTING TO OWNER'S PROJECT FIANAGER. CONTRACTOR SNALL INFORI'9
OWNER'S PROJECT I"IANAGER IN WRITING, AT TII'1E OF SUBI'11SSION, OF ANY
PROPOSED DEVIATION FROM CONTRACT DOCUMENTS.
I. CONTRACTOR'S SUBMITTAL REPRESENTS TNAT RELD MEASUREMENTS,
PIELD CONSTRUCTION CRITERIA, MATERIALS, CATALOG NUMBERS AND
SIF�ILAR DATA NAVE BEEN DETERI'1MED AND VERIFIED BY CONTRACTOR_
B. 54lOP DRAWINGS. SUBI'11T TWO PRMTS. SUBI"IIT SFIOP DRAWINGS FOR CU5T01'1
PRODUCTS AND PRODUCTS NCT FULLY IDENTIFIED 8Y PRODUCT DATA.
C. PRODUCT DATA: SUBMIT NUMBER REQUIRED BY CONTRACTCR PWS TWO FOR
OWNER'S PROJECT MANAGER.INDICATE ITEM TO BE USED WNERE DATA FOR
I'10RE TFIAN ONE PRODUCT OR OPTION IS MCLUDED. SUBI"IIT PRODUCT DATA
FOR EACN STOCK MANUFACTURED ITEM.
D. MANUFACTURER'S CERTIFICATES- SUBMIT TWO COPIES.
E. COORDINATION�COORDINATE USE OF PREMISES AND ACCE55 TO SITE UNDER
DIRECTION OF OWNER. COORDINATE WORK TO ASSURE EFFIQENT AND
ORDERLY SEQUENCE OF INSTALLATION OF CONSTRUCTION ELEMENTS.
I. MAKE PROVISIONS FOR OWNER-MSTALLED ITEMS AND FOR WORK UNDER
SEPARATE CONTRACTS.
2. VERIFY CNARACTERISTICS OF MTERRELATED GPERATING EQUIPI`IENT ARE
COMPATIBLE COORDINATE WORK 4JAVING INTERDEFENDENT
RESPONSIBILITIES FCR INSTALLING, CONNECTION TO, AND PLAQNG SUCN
EOUIPMENT W SERVICE.
3. COORDINATE SPACE REQUIREMENTS AND INSTALLATION OF �1ECNANICAL AND
ELECTRICAL WORK CONCEAL PIPES, DUCTS, AND WIRWG INSTALLED IN
FINISFIED AREAS. COORDINATE LOCATIONS OF FIXTURES AND OUTLETS WITN
FINISFIES.
SECTION 0� 40 00 - QUALITY REQUIREMENTS
A. GENERAL OUALITY CONTROL: MAINTAIN QUALITY CONTROL OVER SUPPLIERS,
MANUFACTURERS, PRODUCTS, SERVICES, SITE CONDITIONS, AND WORKMANSNIP,
TO PRODUCE WORK OF SPEQFIED QUALITY.
B- TESTING LABORATORY SERVICES: TESTING SNALL BE BY AN APPROVED
TESTING LABORATORY, AS REQUIRED BY SPEGFICATIONS AND APPLICABLE
CODES
I_ REQUIRED TESTING AND RETESTING WILL BE PAID FOR BY CONTRACTOR-
2 PURNISN I"IATERIALS AND SAI'9PLES FOR TESTS AND ASSIST TESTING
LABORATORY AS REQUIRED_
SEGTION OI 50 00 - TEMPORARY FACILITIES AND CANTROLS
A. GENERAL. PROVIDE TEI'1PORARY COVSTRUCTION FAQLITIES AND TEI'1PORAR"
CONTROLS AS REQUIRED TO COMPLETE PROJECT IN ACCORDANCE WITFJ
CONTRACT DOCUMENTS. CONFORM TO REQUIREMENTS OF APPLICABLE
AUTNORITIES.
1. CONTACT GOVERNING AUT410RITIES TO ESTABLISLI EXTENT OF REQUIRED
TEMPORARY PAQLI?IES AND CONTROLS_
B. TEMPORARY POWER�� PRGVIDE POWER SERVICE AND LIGNTING REQUIRED FOR
OPERATIONS. LOCATE BRANCN WIRING AND DISTRIBUTION BOXES TO ALLOW
SERVICE AND LIGNTING BY MEANS OF CONSTRUCTION-TYPE POWER CORDS.
C. TEMPORARY WATER AND SANITARY SERVICES�. PROVIDE AND MAINTAIN REQUIRED
DRMKING WATER AND SANITARY PAQLITIES WIT41 ENCLOSURES.
D. NOISE, DUST, AND POLLUTION CONTROL� PROVIDE I'1ATERIALS AND EQUIPI'1ENT
NECESSARY TO COMPLY WITN LOCAL REQUIREMENTS FOR NOISE, DUST, AND
P�LLUTIDN C�NTR�L.
E. BARRIERS: PROVICE AS REQUIRED TO PROTECT ADJACENT PROPERTIES FROf'I
DAMAGE FROM OPERATIONS AND AS REQUIRED BY GOVERNING AUTFJORITIES.
1. PROVIDE BARRICADES AS REQUIRED BY QTY OR LANDLORD IN
ACCORDANCE WITN ALL CODES, CRITERIA� AND DETAILS_
2. SECURITY�. SECURE T41E SITE AND I"IATERIALS DURING CONSTRUCTION_
F. CLEANING� CONTROL ACCUMULATION OF WASTE FIATERIALS AND RUBBISN. AS
CONTAMERS BECOME FULL, DISPOSE AT OFF-SITE LOCATIONS ACCEFTABLE TO
APPLICABLE AUTNORITIES_
G. SIGNS: SUBJECT TO APPROVAL OF OWNER'S PROJECT MANAGER.
N. STORAGE� LIMIT ON-SITE STORAGE TO AREAS WNERE DIRECTED AND APPROVED
IN WRITING BY OWNER. PROVIDE ADDITIONAL WEAT4lER-TIG41T, SECURED,
OFP-SITE STORAGEIF REQUIRED.
I. REI'10VAL AND CLEANING� REI"IOVE CONSTRUCTION FAQLITIES, CLEAN AND
REPAIR DAMAGE CAUSED BY OPERATIONS OR USE OF TEMPORARY FAQLITIES.
SECTION OI 60 00 - PRODUGT REQUIREMENTS
A. CONTRACT AMOUNT: BASED ON MATERIALS AND PRODUCTS LISTED IN CONTRACT
COCUMENTS. MATERIALS AND PRODUCTS BY OTNER MANUFACTURERS NOT
LISTED SHALL NOT BE USED_
B. PRODUCTS: COMPONENTS SUPPLIED IN QUANTITY S4lALL BE MTERCFlANGEABLE.
PROVIDE NEW MATERIALS UNLE55 OTNERWISE INDICATED OR SPEQFIED.
C. INSTALLATION:INSTALL ITEMS PLUMB, LEVEL, AND W CORRECT RELATION TO
ADJACENT PRODUCTS_ SECURE IN PLACE WIT41 POSITIVE ANCNOR4GE DEVICES
DESIGNED AND SIZED TO WITFJSTAND STRESSES, VIBRATION, AND RACKING.
I_ C01"IPLY WITN I'1ANUFACTURER'S REC01'11"IENDATIONS AND INSTALLATION
MSTRUCTIONS UNLE55 MORE STRINGENT REQUIREMENTS ARE SPEQFIED CR
REQUIRED BY GOVERNING AUTNORITIES_
2. WFlERE REFERENCE STANDARDS ARE NOTED IN SPEQFICATION SECTIONS,
USE TFJE MOST CURRENT EDITION OF T4JE REFERENCE STANDARD.
D. TRANSPORTATION: TRANSPORT PRODUCTS TO AVOID PRODUCT DAMAGE. DELNER
IN UNDAMAGED CONDITION IN MANUFACTURER'S UNOPENED CONTAWERS OR
PACKAGING-
E. 4lANDLING: NANDLE PRODUCTS BY I"IET410DS TO PREVENT SOILMG AND DAI"IAGE.
PROMPTLY INSPECT TO ASSURE PRODUCTS ARE CORRECT, COMPLETE, AND
UNDAI"IAGED� AND TNAT C�IUANTITIES ARE CORRECT.
F. STORAG6 STORE MATERIALS IN ACCORDANCE WITN MANUFACTURER'S
INSTRUCTIONS, WIT41 SEALS AND LABELS MTACT AND LEGIBLE
G. PROTECTION- PROVIDE COVERINGS TO PROTECT PRODUCTS FR01'1 DAMAGE FR01"I
TRAFFIC AND CONSTRUCTION OPERATIONS. REMOVE WNEN NO LONGER NEEDED.
N. SPEQFIED PRODUCTS:IF TNESE SPEQFICATIONS MCLUGE MULTIPLE PRODUCTS
GR I"IANUFACTURERS FOR AN ITEf'I, SELECT TFIE PRODUCT OF ANY NAI'1ED
MANUFAGTURER TNAT MEETS T4JE SPEGIFICATION REQUIREMENTS.
SEGTION OI 62 00 - SUBSTITUTIONS AND PRODUCT OPTION
A. SUBSTITUTIONS AND PRODUGT OPTIONS= PROVIDE PRODUGTS INDICATED,
SPEQFIED OR APPROVED- REQUESTS FOR SUBSTITUTIONS OF OTNER PRODUCTS
WILL BE CONSIDERED IF SUBMITTED IN WRITING.
I. CONTRACTOR OPTIONS- PROVIDE SPEG RED PRODUCTS AND MANUFACTURERS.
SUBMIT REQUEST FOR SUBSTITUTION FOR PRODUCTS AND MANUFACTURERS
NOT SPEQFlCALLY NAI'1ED.
2_ CONTRACTOR'S REPRESENTATION�. SUBSTITUTIGN REQUESTS ARE A
REPRESENTATION TFJAT CONTRACTOR F1A5 INVESTIGATED PROPOSED
PRODUCTS, NAS DE?ERMINED IT MEETS OR EXCEEDS SPEQPIED PRODUCTS,
AND WAIVES CLAIMS POR ADDITIONAL COSTS TFIAT SUBSEQUENTLY BECOME
APPARENT.
3. APPROVALS- OWNER'S PROJECT MANAGER WILL JUDGE T11E ACCEPTABILITY.
T4JE OWNER'S PROJECT MANAGER RESERVES TFJE RIGLJT TO REJECT
PROPCSED SUBSTITUTICN.
SEGTION OI 70 00 — EXEGUTION AND CLOSEOUT REQUIREMENTS
A. INSTALLER QUALIFICATIONS: INSTALLERS SNALL 41AVE MINII"IUF1 RVE YEARS
SUCCESSFUL EXPERIENCE MSTALLING ITEMS SIMILAR TO TNOSE REQUIRED FOR
PROJECT_INDIVIDUALS IN TRAINMG UNDER DIRECT SUPERVISION OP EXPERIENCED
MSTALLERS MAY BE EMPLOYED.
B. EXAMINATION- COMMENGEMENT OF PRODUCT MSTALLATION SIGNIFIES T1JAT TNE
INSTALLER NAS EXAMMED SUBSTRATES, AREAS, AND CONDITIONS FOR
C01'1PLIANCE WIT41 I'1ANUFACTURER REQUIREI'1ENT5 FOR TOLERANCES AND 0T41ER
CONDITIONS APFECTING PERFORMANCE.
C. MANUFACTURER'S INSTRUCTIONS= WNEN WORK IS SPECIFIED TO COMPLY WITN
MANUFACTURERS' RECOMMENDATIONS OR INSTRUCTIONS, DISTRIBUTE COPIES TO
OWNER'S PROJECT MANAGER.
D. MSTALLATION- COMPLY WITLI MANUFACTURER'S WRITTEN RECOMMENDATIONS AND
INSTALLATICN INSTRUCTIONS UNLE55 MORE RESTRICTIVE REQUIREMENTS ARE
SPEQ FI ED.
E. PROTECTION: COVER PRODUCTS SU6JECT TO DETERIORATION WITN IMPERVIOUS
SNEET_ PROVIDE VENTILATION TO AVOID CONDENSATION AND WATER ENTR4P1"IENT-
F. CUTTING AND PATCNING� �UT AND FIT C01"IPONENTS AS REQUIRED_ PATCFI
DISTURBED AREAS TO MATC4J ADJACENT MATERIALS AND FINISFIES.
I. REFINI54JING- REFINI54J ENTIRE SURFACES AS NECESSARY TO PROVIDE EVEN
FINISN TO MATCN ADJACENT FINISNES_ REFINISN CONTINUOUS SURFACES TO
NEAREST INTERSECTION. FOR AN ASSEMBLY, REFINISN TNE ENTIRE UNIT.
G. FINAL CLEANING- CLEAN EXPOSED INTERIOR AND EXTERIOR SURFACES. REMOVE
TEMPORARY LABELS, STAINS, AND FOREIGN SUBSTANCES. POLISN TRANSPARENT
AND GLOSSY SURFACES. VACUUI'1 CARPETED AND SOFT SURFACES. CLEAN
DUCTS. QEAN TF1E SITE.
N. SUBSTANTIAL COMPLETION: PROVIDE DOCUMENTATION STATING WORK IS
SUBSTANTIALLY COMPLETE- WHERE OWNER REQUIRES USE OP SPACE PRIOR TO FINAL
COMPLETION, FROVIDE LIST OF ITEMS TO BE COMPLETED.
I. OWNER'S PROJECT MANAGER WILL REVIEW LIST OF ANY ITEMS TO BE
COMPLETED AND SUPPLEMENT LIST WITN ITEMS CONSIDERED MCOMPLETE OR
UNACCEPTABLE.
L PINAL COf1PLETION: PROVIDE WRITTEN CERTIPICATION INDICATING WORK IS IN
GOMPLIANCE WIT4J GONTRACT DOCUMENTS; TF1AT SYSTEMS WERE TESTED AND ARE
OPERATIONAL; AND TNAT WORK IS READY POR PINAL INSPECTION_
J_ PROJECT RECORD DOCUf1ENTS: MAINTAIN COMPLETE AND UP-TO-DATE RECORD
DOCUMENTS. KEEP SEPARATE FROM FIELD DOCUMENTS. SUBMIT PROJECT RECORD
DOCUMENTS, MATERIAL AND FINI541 DATA, OPERATION AND INSTRUCTION MANUALS,
WARRANTIES AT COf�PLETION.
L SUBMIT BOUND IN 8-I/2" X II" TIJREE RING BINDERS WITIJ DURABLE PLASTIC
COVERS.
K. WARRANTIES- PROVIDE WARRANTIES AS SPEQFlED, SIGNED BY CONTRACTOR AND
MANUFACTURER- WARRANTY FORM SNALL BE APPROVED BY OWNER-
L WARRANTIES SNALL BE IN ADDITION TO AND REGARDLESS OP WARRANTY
WORDING, NOT A LIMITATION OF OTIJER RIGNTS TNE OWNER �1AY NAVE AGAINST
CONTRACTOR UNDER CONTRACT DOCUMENTS AND AS PRESCRIBED BY LAW.
L SUBMIT, UPON COMPLETION OF TNE PROJECT, TNE FOLLOWING PAPERWORK��
I. GENERAL CONTRACTOR'S PINAL UNCONDITIONAL WAIVER OF LIEN.
a. LIEN WANERS AND AFFIDAVIT 54lALL 6E ORIGINAL
DOCUMENTS AND BE NOTARIZED.
2. GENERAL CONTRACTOR'S AFFIDAVIT.
3_ FINAL UNCONDITIONAL WAIVERS OF LIEN FROM EACN SUBCONTRACTOR
4. COf1PLETE LIST OF SUBCONTRACTORS, WCLUDING ADDRESSES AND TELEPFIONE
NUMBERS, CONTACT PERSON AND EMAIL ADDRE55.
5. CERTIFICATE OF CCCUPANCY.
6. ONE-YEAR WARRANTY.
7. APPROVED CERTIFIED AIR-BALANCE REPORT.
8. OPERATION AND MAINTENANCE MANUALS.
q. ANY CERTIFlCATIONS OBTAWED (E.G. ELEVATORS).
�
z
O
>
�
m
�
�
a
� o
W N
� o
� N
�
w �
Q N
o �
w
(/�
�
� >
J
� w O mN o
Q NUU� z
3 N��Z �
�/� w www— �
V J � ~ ~ w �
vI7 �¢�� z
� W �UUU 3
�
Z �
� �
�
w
�
�
�
�
U
�
U
a
C/�
�`OpcLO55A
r°`v�`•'�sr@' �'T`'�..
c:�.'Q6� AFQ:Oj.'<
; : :
= ' w h '�+ caDs9 ; __
� �STA�EOF . �
=o,�t., !dmaxc.::��'_
� � qFCHITE�2acP•�:
,,,,zniizoso
w
�
0
>
m
0
w
Y
U
2
U
�
�
'm
�
�
0
F
.a�ME�rw�.rEs-r..�oEs���.Eai. a
�
ARCH JOB # 2019.050 �
DRAWING NUMBER:
AS.1 �
a