Loading...
HomeMy WebLinkAboutM102.2-HVACSpecifications15q3q EXHAUST FANS A. PRODUCTS- FANS SHALL BE MANUFACTURER AND MGCEL AS SPEQFIEG IN SCNEDULE. B_ W4lERE SNOWN ON DRAWWGS, PROVIDE A TOILET EXNAUST PAN UNIT COMPLETE WITFI GRAVITY BACK DRAFT DAMPERS. ALL DUCTWORK, ROOF OPENINGS AND �APS NECESSARY TO PROVIDE A COMPLETE EXNAUST SYSTEM SNALL BE PROVIDED BY T4lE CONTRA�TOR. REFER TO PLANS FOR APPLICABILITY. C. ROOF OPENING TO BE FRAMED BY GENERAL CONTRACTOR. NVAC CONTRACTOR TO SET CURB IN PLACE AND SECURE TO ROOF DECK. GENERAL CONTRACTOR TO PURNISN AND INSTALL PLASNING. D. NVAC CONTRACTOR ?0 NANG FAN, SET CURB AND SECURE, INSTALL BACKDRAFT DAMPER AND CONNECT DUCTWORK. E ELECTRICAL CONTRACTOR TO PROVIDE ALL WIRING. 15975 INSULATION A. PRODUCTS:INSULATION SNALL BE OWENS-�ORNING. EQUAL PRODUCT BY ARMSTRONG, CERTAWTEED, SCNULLER OR KNAUF MAY BE FURNISNED AT TNE CONTRACTGR'S OPTION. B_ DUCT WSULATION AND APPURTENANCES 54lALL NAVE A RAME SPREAD RATING NOT EXGEEDING TWENTY-FNE (25) AND A SI'90KE DEVELOPED RA?ING NOT EXCEEDING PIFTY (50)_ �. CONCEALED ROUND DUCTWORK - FLEXIBLE FBERGLASS DUCT WRAP LAMINATED W4JITE REINFORCED KRAPT VAPOR BARRIER FAGING WITN 2" STAPLING FLANGE, I.0 PCF DENSITY, K-027. OWENS-CORNING COMI"IERGAL GRADE FIBERGLA55 DUCT WRAP TYPE I00_ D. INSULATION THICKNESS MIN. MIN. DUCT TYPE TNICKNESS R VALUE IN UNGONDITIONED AREA 2° 5.0 IN CONDITIONED AREA I" 33 PIPE TYPE TWCKNE55 R VALUE CONDENSATION I" 6.5 E. INSULATION SNALL NOT BE APPLIED UNTIL TNE GENERAL CONSTRUCTION NAS FROGRESSED SUFFIQENTLY TO MSURE AGAINST PLIYSICAL OR M015?URE DAMAGE TO ?NE INSULATION. ALL MSULATION DAMAGED THROUGN FAILURE TO OBSERVE TNIS DIRECTNE SLIALL BE REFLACED AT NVAC CONTRACTOR'S EXPENSE. E LME ALL SUPPLY AND RETURN RECTANGULAR AIR DUC?5 WITN A MINIMUM OF I" RIGID DUCT LWER. G. DUGT LWER SNALL BE I-I/2 LB. AGOUSTIGAL DUGT LWER TNE SURFACE FAGMG THE AIRSTREAM SNALL BE TREATED WITN A NON-COMBUSTIBLE COATING TO PREVENT AIR EROSION AND NOT SUPPORT I'91CROBIAL GROWTN. � 4lANGER RODS MUST BE PERPENDICULAR TO DUCTWORK BEFORE WSULATION IS WSTALLED. WSTALL ALL WSULATION ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. J. INSULATION SNALL BE APPLIED OVER FLANGES, JOINTS AND SEAMS IN PIPING AND DUCTWORK. K. ALL JOMTS AND SEAMS IN MSULATION SNALL BE PROPERLY SEALED TG MAINTAIN VAPOR BARRIER MTEGRIT7. 15980 BALANCING AND GOMMISSIONING A_ ALL AIR DISTRIBUTION SYSTEMS ARE TO BE BALANCED IN ACCORDANCE WITN GENERALLY ACCEPTED ENGINEERING STANDARDS, SUCN AS TNE ASSOCIATED AIR BALANCE COUNCIL (AABG) OR NEBB. DUCTED AIR RATES ARE TO BE MEASURED AND ADJUSTED TO DELIVER FINAL FLOW RATES WITNIN 10% GF DESIGN RATES. B. TNE MECNANICAL SYSTEMS SNALL BE TESTED TO VERIFY TNAT T41EY ARE ALL WORKING PROPERLY TO MEET TNE STATE ENERGY CODE REQUIREMENTS. PROVIDE A REPORT SNOWING TNAT EACN PIECE OF EQUIPMENT WAS BEEN TESTED IN ITS VARIOUS FUNCTIONS AND IT PERFORMANCE FOR EACN OF TNESE FUNCTIONS. VERIFY TNAT TNE PROPERLY SIZED EQUIPMENT NAS BEEN INSTALLED AND RECORD ALL OF TNE PERFORMANCE AND GENERAL PNYSICAL DATA FROM T41E EQUIPMENT. C_ GENERAL CONTRACTOR TO PROVIDE A CERTIFIED AIR BALANCE REPORT AS PART OF GLOSE OUT GOCUMENTS. D_ TNIS CONTRACTOR IS REQUIRED 70 INSTALL T4JE OWNER'S ENERGY MANAGEMENT EQUIPMENT, TEST, ASSIST M COMMISSIONING OF SYSTEM AS PART OF BASE BID. RELEA5E0 FOR CONSTRIICTI�N Su6jec��o compliance with allregula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM��_ DATE: 03�20�20 Z W w N � � o � F N N � � W � W W � N � a o 0 w N � O � w p m � � W W M a �aaa 3 �� N��z �O WHHJ W V) OJJK � W (nUUU r Z � C� � h w � � � U � U � � � � ,,..G�A Mo-+, y`Z'� �V�STFi�E��i 0 � U } m 0 U 2 U Y a � m ¢ � 0 ENG JOB # 19-41-215 DRAWING NUMBER: H6.2 � s �