HomeMy WebLinkAboutP103.1-PlumbingSpecifications15010 C,rENERAL PROVISIONS
A_ PROVIDE ALL MA?ERIALS AND EQUIPMEN? AND PERFORM ALL LABOR
REQUIRED TO INSTALL A COMPLETE PLUMBING SYS?EM, AS INDICATED ON
TFIE DRAWMGS, AS REQUIRED BY CODE AND AS SPEQPIED NEREIN.
B. ALL CONTRACTORS SUBMITTING PROPOSALS FOR TNIS WORK SNALL FIRST
EXAMWE THE SITE AND ALL CONDITIGNS TNEREIN. ALL PROPGSALS SHALL
TAKE INTO CONSIDERATION ALL SUGN CONDITIONS AS I"IAY APFECT THE
WORK UNDER THIS CONTRACT. TNE SUBMITTING OF A BID AUTOMATICALLY
II"IPLIES TNAT THIS EXAMINATION OF SITE NAS BEEN DONE FAILURE TO
VISIT SITE WILL NOT BE GROUNDS FOR ANY EXTRA WGRK.
4 TNE WORK TO BE PERFORMED UNDER TNIS DIVISION SNALL INCLUDE, BUT
IS NOT LIMITED T0, TNE FOLLOWING�
I. PWMBING WORK AS DESCRIBED W SECTIONS 15010 TNROUGN 15375.
Z FIRE PROTECTION WORK AS DESCRIBED IN SECTIONS I5010 AND 15410
TNROUGN
15430
G. TNE ELECTRICAL CONTRACTOR, UNLESS OTHERWISE NOTED, IS TO PROVIDE
POWER WIRING FOR EACN ITEM OF ELECTRICAL EQUIPMENT AND MAKE FINAL
CONNECTIONS TO MOTORS.
E. ALL FINISN PAINTING IS TO BE PERFORMED BY TNE GENERAL CONTRACTOR,
EXCEPT AS NOTED ELSEWNERE. TNIS CONTRACTOR SNALL RESTORE TO
ORIGINAL CONDITION ANY PAINTING DEFAGED BY NIM AFTER ORIGINAL
PAMTMG.
E ALL WORK SNALL CONFORM ?0 CODES, RULES, AND REGULATIONS:
L STATE PLUMBING CODE.
2 LOCAL BUILDING CODE
3. NATIONAL PIRE PROTECTION ASSOCIA?ION.
G.
N
J.
K
L
M.
N.
C
4. REFERENCED CODES AND STANDARDS AS SET UP BY VARIOUS
TECNNICAL SOQETIES
SUGH AS ASI"IE, ASHRAE, ASTP9, SMACNA, ARI, AABC, OR IEEE.
5. FEDERAL OCCUPATIONAL SAPETY AND NEALTFI STANDARDS.
6. LOCAL INSPECTOR'S REQUIREMENTS.
7. STATE INDUSTRIAL COMMISSION REQUIREMENTS_
8. BUILDING MSURING AGENCY REQUIREMENTS.
ALL PERMITS REQUIRED BY LAWS, ORDINANCES AND BUILDWG CODES
NAVING JURISDICTION SNALL BE OBTAINED AT TNE PROPER TIME BY AND
AT TNE EXPENSE OF TNIS CONTRACTOR.
TF115 CONTRACTOR SNALL OBTAIN ALL WSPEC?IONS REQUIRED BY ALL
LAWS, ORDINANCES AND PUBLIC AUTNORITY NAVING JURISDICTION AND
SFIALL OBTAM CERTIFICATES OF SUCN INSPECTIONS AND SUBMIT SAME TO
TNE DSW AND SFIALL PAY ALL FEES, CNARGES, ASSESSMENTS AND OTNER
EXPENSES W CONNECTION TNEREWITN.
PIPING AND EQUIPI'�ENT LAYOUT IS SCHEMATIC. EXACT LOCATIONS ARE
DETERMINED BY STRUCTURAL AND OTNER CONDITIONS. DESIGN OF SYSTEM
P'IAY NOT BE CNANGED WITNOUT WRITTEN APPROVAL OF ARCNITECT/OWNER.
CNLY EXACT LOCATION OF PIPING MAY BE REVISED TO SUIT CONSTRUCTION
CONDITIONS AND AID W COORDINATION WITN WORK OF OTNER
CONTRACTORS.
TNE MATERIALS AND EQUIPMENT INSTALLED SNALL MEET TNE
REQUIREMENTS OF T41E CONTRACT DOCUMENTS.
CATALOG DATA FOR EQUIPMENT REVIEWED BY TLIE ARCLIITECT SNALL NOT
SUPERSEDE T41E ENGINEER'S CONTRACT DOCUMENTS. TNE REVIEW OF TNE
ENGINEER SNALL NOT RELIEVE TNE CONTRACTOR FROM RESPONSIBILITY
FOR DEVIATIONS FROM DRAWMGS OR SPEQFICATIONS, PROVIDING PROPER
CLEARANCE FABRICATION PROCESS AND COORDINATION WITN OTNER
TRAGES.
W41EN SUBMITTED FOR DSW REVIEW, 54lOP DRAWMGS 541ALL BEAR TNE
CONTRAGTOR'S CERTIFICATION TNAT TNEY NAVE REVIEWED, CNECKED AND
APPROVED TNE SNOP DRAWINGS, TNAT THEY ARE IN HARMONY WITH TNE
REQUIREI'1ENTS OF TNE PROJEGT AND WITN THE PROVISIONS OF TNE
CONTRACT DOCUMENTS AND THAT TNEY NAVE VERIFIED ALL FIELD
I'1EASUREI'1ENTS AND GONSTRUCTION CRITERIA, P'IATERIALS, CATALOG
NUMBERS AND SIMILAR DATA. CONTRACTOR SNALL ALSO CERTIFY TNAT
TNE WORK REPRESENTED BY TNE SNOP DRAWINGS IS REC01'1MENDED BY
TNE CONTRACTOR AND TNE CONTRACTOR'S GUARANTEE WILL FULLY APPLY_
ALL CONTRACTORS SUBMITTING PROPOSALS FOR TNIS WORK SNALL FIRST
EXAMWE THE SITE AND ALL CONDITICNS TNEREIN. ALL PROPGSALS SNALL
TAKE WTO CONSIDERATION ALL SUCN CONDITIONS AS MAY APFECT T4JE
WORK UNDER THIS CONTRAGT. TNE SUBMITTING OP A BID AUTOI"IATICALLY
IMPLIES TNAT TNIS EXAMINATION OF SITE NAS BEEN DONE.
CONTRACTOR SNALL VERIFY LOCATION OF UTILITIES AND NOTE CONDITIONS
WNICN WOULD AFFECT TNE WORK. ALL DISCREPANCIES SNALL TNEN BE
REPORTED PRIOR TO T41E BID AWARD.
PROVIDE INSTRUCTION TO TENANT'S OPERATING PERSONNEL AS NECESSARY,
RELEA5E0 FOR CONSTRIICTI�N oPER oPERa-rioN oF na�oR rrEMs oF
'1PONENTS AND REFERRING TO TNE OPERATING
Su6jec��ocompliancewithallregula�ions ',IBE� BELOW AS A GUI�E.
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��_
DATE: 03�20�20
P. COMPILE A WRITTEN MANUAL OF OPERATING INSTRUCTIONS INCLUDING
�OPIES OF SNOP DRAWINGS AND A LISTING OF EQUIPMENT SUPPLIERS.
ASSEMBLE IN 8-V2" X II" NARD BACKED INDEXED BINDER. MATERIAL SNALL
BE AS FOLLOWS-
3.
4
5.
TITLE PAGE: TITLE OF JOB, TENANT, ADDRE55, DATE OF
SUBMISSION,
CONTRACTOR AND ENGINEER.
INDEX
LIST OF MAJOR EQUIPMENT USEG IN PROJECT ACCOMPANIED BY
CONTRACTOR
PURCHASE ORDER NUMBERS AND SUPFLIERS NAMES AND ACDRESSES.
ONE COPY OF EA�N SNOP DRAWING GRCUPED BY TYPES OF
EQUIPMENT, LE.,
PLUMBING PIXTURES, VALVES, ETG.
SECTION FOR EACN SYSTEM MCLUDING:
a. BRIEF DESGRIPTION OP SYSTEI'9 OPERATION WITH LOGATION OF
MAJOR COMPONENTS.
Q. SUBMIT A COMPLETED COPY TITLED "PLUMBING OPERATMG INSTRUCTION
MANUAL" ON TNE BINDING EDGE OF BINDER TO DSW FOR APPROVAL. AFTER
DSW REVIEW AND ANY CORRECTIONS REQUIRED ARE COMPLETED, SUBMIT A
CORRECTED FINAL COPY OF TNE MANUAL TO DSW.
R_ WI?FIIN 10 DAYS AFTER TNE DATE OF STORE OPENWG, RECORD DRAWINGS
OF ?FIE ACTUAL INSTALLATION SFIALL BE PROVIDED TO TNE ?ENANT.
RECORD DRAWWGS SNALL INCLUDE AS A MINIMUM ALL DEVIA?IONS FROM
TNE PLANS, TNE LOCATION AND PERFORMANCE DATA ON EACN PIECE OF
EQUIPMEN?, GENERAL CONPIGURATION OP DUCT DIS?RIBUTION 5Y5?EM
INCLUDING SIZES, AND TNE AIR DESIGN FLOW RATES_
S. DSW SNALL BE PROVIDED AN APPROVED SET OF SPRINKLER GRAWINGS.
15100 PLUMBING BASIG MATERIALS AND METNODS
A. PROVIDE AND INSTALL ALL FIPING AS SHOWN ON TNE CRAWINGS ANG/OR
AS REQUIRED.
B. THIS CONTRACTOR IS TO BECOME WFORMED OF TNE EXACT DII"IENSIONS OF
FINISHED WORK W41ERE PIPES ARE TO BE PLAGED AND WILL ARRANGE TNE
WORK ACCORDINGLY, ACCEPTING ALL RESPONSIBILITY FOR PROPER
LOCATION. M TNE ERECTION OF TNE MAINS, SPEQAL CARE SNALL BE USED
PROVIDING SUPPORT AND PROPER ALLOWANCES SHALL BE I"IADE FOR
EXPANSI�N.
�. ALL PIPE LINES MUST BE PROVIDED WITN A SUFFIQENT NUMBER OF
FITTINGS OR UNIONS TO MAKE POSSIBLE DISASSEMBLY WITNOUT BREAKAGE
OF FITTINGS.
D. ALL EXFOSED FIPING SNALL BE NEAT AND CAREFULLY ALIGNED WITLI TNE
STRUCTURAL ELEMENTS OF TFIE BUILDING. NO OFFSETS OR OBLIQUE
BENDS WILL BE PERMIT?ED. DRAWWGS ARE DIAGRAMMA?IC AND SNOULD
NOT BE USED FOR LAYOUT WORK.
E. ALL LOW POINTS IN WATER PIPING TO NAVE DRAIN VAWES WITH
STANDARD NOSE ATTACHI'1ENTS. HOT AND COLD WATER PIPING IS TO PITCN
TOWARD TNE NEAREST DRAIN VALVE.
F. ALL PIPES TO BE INSTALLED SNALL BE LOCATED AT SUFFIQENT
DISTANCE FROM WALLS, OTNER PIPES, CONDUIT, DUCTWORK AND OTNER
OBSTACLES TO AVOID INTERFERENCE AND TO PERMIT TNE APPLICATION OF
FULL TNICKNE55 OF INSULATION SPECIFIED.
G. MECHANICAL JOINT TYPE PIPING SFIALL BE INSTALLED PER
MANUFACTURER'S RECOMMENDATIONS.
N_ FURNISN AND INSTALL IN TNE PIPING LEAVING ?NE WATER NEATERS,
THERMOMETERS AND WELLS FOR MEASURING TNE WATER TEMPERATURES.
TFIERMOMETERS ARE TO BE GLA55 WITN 9" SCALES AND GRADUATED 50
?NAT EXPECTED TEMPERATURE IS MIDWAY OF SCALE, STAMLESS STEEL
FRONT, SEPARABLE SOCKET AND GLA55 WINDOWS. THERMOMETERS BY
?RERICE, ASNCROFT, MARSNALL70WN, AND WEI55 ARE ACCEP?ABLE.
I. SANITARY PIPING - NO PVC ALLOWED (UNLE55 APPROVED BY LOCAL
JURISDICTION)
I. WASTE, DRAIN AND VENT PIPMG SNALL BE SERVICE WEIGFIT, CAST
IRON SOIL PIPE. VENT PIPING ABOVE FLOOR 2" OR SMALLER MAY BE
GAWANIZED STEEL UNLE55 OTNER TYPES ARE APPROVED BY LOCAL
CODES.
2 JOINTS: BELOW FLOOR SLAB - COMPRESSION TYPE PLASTIC SEAL
(NUB AND SPIGOT). ABOVE FLOOR SLAB - NEOPRENE SEALMG
SLEEVE WITN STAINLE55 STEEL SNIELD AND CLAMP WITN APPROVED
NEOPRENE - 6ASED WBRICANT, (NUBLE55). GALVANIZED VENT -
SCREWEG JOINTS WITN TEFLOW TAPE ON MALE TNREADS.
3. PITGN WASTE LWES 2" AND 51"IALLER NOT LESS TNAN I/4" PER POOT.
PITCN LARGER MAINS NOT LE55 THAN I/8" PER FOGT.
J.
�
4. WSTALL A CLEANOUT AT BASE OF EAC4! SOIL STACK, AT EAC4!
CNANGE IN DIRECTION, AT INTERVALS NOT OVER 50 FEET, AND
ELSEWFJERE AS SFJOWN ON DRAWINGS OR REQUIRED BY LOCAL CODE.
CLEAN OUTS SNALL NOT BE WSTALLED IN PUBLIC AREAS WITNOUT
SPEQFIC PERMISSION BY TENANT'S CONSTRUCTION MANAGER; BUT
WNERE NECESSARY, TNE WALL CGVERS ARE TO BE STAINLESS STEEL
AND TFIE PLOOR COVERS ARE TO 6E BRA55 (FLUSN WI?FI PINISNED
FLOOR). PROVIDE COVERS WITN INSET AREA FOR CARPETED FLOOR
LOCATIONS. ALL CLEAN-OUT LOCATIONS SNALL BE APPROVED BY TF1E
TENANT'S CONSTRUCTION MANAGER.
5. INSULATE ALL NORIZONTAL RUNS OF PIPING LOCATED IN CEILING
SPACES WNEN APPLICABLE. INSULATION TO BE AS SPECIFIED FOR
WATER PIPING.
CONDENSA?E PIPING
I. TYPE "L" DRAWN GOPPER TUBE WITH q5-5 TIN- ANTIMONY SOLDERED
JOWTS ANG WROUGNT COPPER FlTTINGS WITN DIELECTRIC SEPARATION
BETWEEN DISSIMILAR ME?ALS_ (ONLY IF REQUIRED 6Y LOCAL CODE)
2_ PVC PIPE: ASTM D2729.
FITTINGS: PVC_
JOINTS: ASTM D2855, SOLVENT WELD WI?FI ASTM D2564 SOWENT
CEMENT
POTABLE WATER PIPING�
I. BELOW GRADE TYPE 'K', ANNEALED TEMPERED COPPER TUBE FOR
PIPE SIZES 2 INCHES AND SI"IALLER. BRAZE ALL JOMTS.
2. ABOVE GRADE TYPE 'L' DRAWN COPPER TUBE WITH WROUGNT COPPER
PITTINGS AND 95-5 TIN-ANTIMONY SOLDER.
3. NSTALL AIR CNAMBER SNOCK ABSORBERS IN PIPWG SYSTEM TO
PREVENT NOISE AND DAMAGE DUE TO WATER NAMMER.
15130 EXGAVATION AND BAGKFILL
A. TNIS CONTRACTOR SNALL EXCAVATE AND BACKFILL ALL TRENCNES AND
OTNER EXCAVATIONS REQUIRED POR LAYMG DRAWS, SEWERS,
APPURTENANCES AND OTNER EXCAVATIONS REQUIRED FOR NIS WORK.
B. EARTN FILL: SOIL AS APPROVED BY TNE OWNER'S REPRESENTATIVE, FREE
OP ORGANIC SOIL, SOD, ROOTS, WOOD, METAL, RUBBISN, DEBRIS� LUMPS
OR EXCESSNE AMOUNTS OF CLAY AND ROCKS GREATER TNAN 2' IN
DIAMETER; CAPABLE OF BEMG COMPACTED MTO DENSE AND STABLE
CON I ION AS 5 CI I
D T PE F ED.
C. ALL UNDERGROUND PIPING SLIALL BE INSTALLED ON A MINIMUM OF A 3" BED
OF COMPACTED SAND. ALL UNDERGROUND FIPING SNALL BE BACKFILLED BY
NAND TO A LEVEL OF 6" ABOVE TNE PIPE WITFI CLEAN SAND. ALL
BACKFILL SNALL BE MADE W LIFTS NO? TO EXCEED 12". EACN LIFT SNALL
BE MECNANICALLY COMPACTED TO A MINIMUM OF 92% MODIFIED PROC?OR_
D. PROTECT ALL UTILITIES SNOWN ON DRAWINGS OR ENCOUNTERED M TNE
CONSTRUCTION WORK. ANY DAMAGE TO UTILITIES SNALL BE REPAIRED BY
TWS CONTRACTOR ?0 OWNER'S SATISFACTION, WI?NOUT COST ?0 TNE
OWNER.
E THIS CONTRACTOR SNALL REI"IOVE ANY UNUSABLE OR SURPLUS EXCAVATEG
MATERIAL FROM SITE.
15200 PLUMBING SYSTEMS
A_ SANITARY BUILDING DRAW, SOIL, WASTE AND VEN? LWES SFIALL 6E AS
DIRECTED IN SECTION 15100.
B.
�
D
E.
F
G.
N.
VENT STACKS SNALL EXTEND THROUGN THE BUILDING, TERMINATING 12"
ABOVE THE ROOF. STANDARD FLASNING SNALL BE EXTENDED 12" IN ALL
DIRECTIONS FROM TNE VENT TERMINAL AND TURNED DOWN MTO VENT.
FLASNING UNITS AS MADE BY STONEI'1AN CAULK TYPE N0. SII10-4 I"IAY BE
USEC IN LIEU OF FIELD FABRICATED FLASNINGS.
NORIZONTAL RUNS SNALL BE GIVEN AS STEEP A PIT�N TOWARD TNE
OUTLET AS CONDITIONS WILL PERMIT BUT NOT LE55 TNAN I/8" PER FOOT.
FULL "Y" BRANCN FlTTINGS AND EXTENSION WITN BRA55 NIPPLES AND
FINISLIED SCREW PWGS FOR QEANOUTS SLIALL BE PLACED IN ACCESSBLE
PO51?IONS A? ENDS OP NORIZONTAL LINES OP PIPE AND A? FOOT OF ALL
VERTICAL LMES OF PIPE OR ELSEW4IERE, AS MAY BE REQUIRED BY TNE
CODE.
WNERE CLEANOUTS OCCUR IN FINISNED AREAS, TNEY SNALL BE RECESSED
AND COVERS TO BE FLUSN WITN TNE FLOOR OR WALL.
NOT AND COLD WATER PIPING, ABOVE GROUND, SNALL BE AS DIRECTED IN
SECTION 15100 WITFI SOLDER FITTINGS. EXPOSED PIPING AT FIXTURES SFIALL
BE CNROME PLATED BRA55_
ALL COPPER TUBING SNALL NAVE SWEAT JOMTS AND BE CLEAN OF SCALE
AND FOREIGN MATTER BEFORE INSTALLATION. ALL ENDS OF TUBING TO BE
SWEATED SNALL BE REAP'IED, CLEANED AND BURNISNED TG REI'10VE DIRT
AND GXIDE. NARD 95-5 SOLDER SNALL BE USED AND APPLIED TG TNE
JOINTS ACCORDING TO STANDARD PRACTICE AND/OR MANUPACTURER'S
RECOMMENDATIONS. SUITABLE ADAPTERS SFIALL BE USED AT CONNECTION
TO EQUIPMENT.
EACN NOT AND COLD WATER BRANCN SNALL BE PROVIDED WITN A GATE
VALVE SNUT-OPF AND EAGN PIXTURE SNALL BE PROVIDED WIT4J A STOP
VA��/E.
15220 GAS PIPINC,r
A_ STANDARD WEIGFIT BLACK STEEL PIPE. FITTMGS FOR LMES I-I/2" AND
LARGER SNALL BE WELDED STEEL FITTINGS FOR LWES I-I/4" AND SMALLER,
EXCEPT WNEN LOCATED IN AIR PLENUMS, SNALL BE SCREWED STANDARD
WBGNT BLACK MALLEABLE. ALL GAS PIPWG LOCATED IN RE?URN AIR
PLENUMS SNALL BE STANDARD WEIGNT BLACK STEEL W/ STANDARD WEIGNT
WELDED ?YPE FITTINGS. NO VAWES ARE TO BE LOCATED IN RETURN AIR
PLENUMS_
6. GAS COCK'S I-V2" AND SMALLER SHALL BE ALL BRONZE, SCREWED, FLAT
NEAD, BRASS PLUG AND WASHER 200 LB. NOG.
C_ PROVIDE LINE SIZE 6" LONG DIRT LEG AND GAS COCK AT ALL EQUIPMENT
CONNECTIONS.
D_ ALL EQUIPMENT SNALL SNALL BE CONNEC?ED WITFI RIGID PIPING AS
SPEQ FlED ABOVE, FLEXIBLE CONNECTORS ARE NOT ACCEFTABLE.
E PROVIDE UNION AT ALL EQUIPMENT CONNECTIONS.
15250 EQUIPMENT IDENTIFIGATION
A. STENQLS, LABELS, TAGS, AND CGLOR CODES SNALL CONFORI"I TO ANSI AI3.
B. PRODUCTS SNALL BE SETON. EQUAL PRODUCTS BY BRADY MAY BE
FURNISNED AT CONTRAGTOR'S OPTION, ONLY IF EQUAL.
C. STENCILS SNALL BE REUSABLE AND 41AVE I" �IIC,4�1 CFIARACTERS.
C4IARACTERS 54lALL BE PAINTED WWTE OVER A BLACK BACKGROUND.
INGLUDE ON PIPING A WNITE (OR BLAGK) STENGILED ARROW M PLOW
DIRECTION NEXT TO STENCIL. STENQL ONLY AFTER FINAL PAWTING IS
COMPLETE CNARACTERS SNALL BE LEGIBLE FROM FLOOR. APPLY QEAR
ACRYLIG, LAGQUER, OR VARNIS41 OVER TNE PINISHED STENGIL.
D. PREPRINTED FLEXIBLE VINYL LABEL WITN PERMANENT PRESSURE SENSITIVE
ADNESIVE BACK MAY BE USED ON PIPE MSTEAD OF STENCIL LABEL SNALL
BE OF SUFFIQENT LENGTH TO ENCIRQE THE PIPE (AND INSULATION WHEN
APPLICABLE) AND OVERLAP ON ITSELF. EACN LABEL SNALL NAVE AT LEAST
ONE FLOW DIRECTION ARROW AND SNALL BE PERMANENTLY LABELED WITN
PIPE CONTENT.
E PIPING, VALVES, DRAINS, GONTROL PANELS AND SII"IILAR EQUIPI'9ENT SNALL
BE IDENTIFIED AS TO FUNCTION AND SYSTEM NUMBER AS GIRECTEG BY TNE
?ENANT'S REPRESENTATNE AND AS LISTED BELOW=
F
G
ITEM TYPE
IDENTIFICATION
FIPING STENQL OR PIPE LABEL
VA W ES TAG
PIPING SPECIALTY TAG
WATER NEATER AND OTNER STENCIL
EQUIPMENT
IDENTIFY PIPE LMES WITN STENQL OR PIPE LABEL WITN COLOR CODED
BANDS A? TNE FOLLOWING LOCA?IONS:
I. AT EQUIPMENT CONNECTION AT EACN VALVE.
2 AT BOTN SIDES OF WALLS TNROUGN WNICN PIPE PASSES.
3. AT EVERY 20 FT. INTERVAL ON CONTINUOUS PIPE LMES.
4. AT EACN BRANCN CONNECTION.
5. SFIOW FLOW DIRECTION ARROWS AT EACN IDENTIPICATION POINT.
PIPE STENQL SCNEDULE:
COLOR STENQL TAG
SERVICE CODE DESIGNATION DESI�NA?ION
D01'1ESTIC CGLD LIGNT D.C.W.S. D.C.W.S.
WATER SUPPLY BLUE
COMES?IC LIO? DARK D.LI.W.S. D.H.W.S.
WATER SUPPLY BLUE
SANITARY SEWER --- SAN. ---
LI. TAG ALL VAWES AND PIPE SPEQALTY WITH A NUMBER- FURNISN A
SCNEDULE OR SCl�EDULES OF ALL VAWES OR DEVICES ?AGGED WITFI
NUMBER, LOCATION AND PURFOSE OF EACN VAWE AND INCWGE IN
OPERA?ING AND MAINTENANCE MANUAL.
Z W w N
� � o
� F N N
> � w �
W W � N
� a o 0
w
N
�
O �
w p m
� � W W M
Vo c
3 �aa� �
N��Z u
�p W ��w o
V)OJJK �
� W (% U U (¢j .
r
Z �
C� �
h
w
�
z
�
U
�
W
�
�z
I--I
�
�
r"GE q, !HQ ^+,
�y`Z'� �V�STFkr��i
0
m
U
r
m
0
w
U
x
U
Y
a
�
m
¢
�
0
�
ENG JOB # 19-41-215 0
s
DRAWING NUMBER:
P6.1 r�
b