HomeMy WebLinkAboutALB33- Energy CertIndiana 2�2� Perfarmance �ompliance
Praperty
358fl PERCIVAL �RIVE
CARMEL, IN 46074
Madel: CRESTWdO❑ BST GAM BC
Cammunity: ALBANY PLACE
9a9dREIN ALBANY PLACE 3580 PE
9a9aREIN ALBANY PLACE 358D PE
11D5
1102.4.1.2
11 D2.5
11 D2.5
1104.1
P�landatory Checklist
11 D3.6
11D3.B.1
Inspe�tion 5tatus
Results are projected
Annual Energy Cost
Design
Heating
Caoling
Water Heating
Mechanical Ventilatian
SubTotal - Used to determine �omplian�e
Lights & Appliances wlout Ventilation
�nsite generation
Total
Performance-based compliance passes by 9.8°:0
Air Leakage Testing
Area-weighted average fenestration SHGC
Area-weighted a�erage fenestration U-Factor
Lighting Equipment Efficiency
hlandatory code requirements that are not
checked by Ekotrope must be met.
Mechanical Ventilation Rate
Requirements
�
�
�
�
�
�
�
�
h�lechanical Ventilation Efficacy
❑rganixatian
Top6uild Home 5ervi�es, I
Eric Bjerre
Builder
dREES HDMES
Indiana 2020 Performance
$1,649
$2�0
$1�4
$29
$2,103
$1,113
$0
$3,216
a Build
Hame 5ervices
ENVIRCINMENTS FOf{ J �� � f�
As aesigned
$1,478
$225
$174
$19
$1,897
51,113
$0
$3,D1�
Air sealing is 3.04 ACH at 50 Pa. It must not exceed 5.00 ACH at 54 Pa.
Design exceeds requirements fvr Indiana 202� Perfvrmance compliance hy 9.8°Io.
As a 3rd party extension of the code jurisdi�tion utilizing these reports, I certify that this energy code complian�e document has been created in accordan�e with the requirements of
Chapter 4 of the adopted Intemational Energy Conservation Code based on Climate Zone 5. If rating is Projected; I certiTy that the building design des�ribed herein is consistent with
the building plans, specifications, and other �al�ulations submitted �tiith the permit application. If rating is Confirmed, I �ertiTy that the address referenced abo�e has been
inspected.+tested and that the mandatory provisions of the IECC have been installed to meet or exceed the intent of the IECC or will be verified as such by another party.
Name
❑rganization
Eric 8jerre
TopBuild Home 5erui�es. Inc
Signature: ��'�`G ����
❑igitally sig��ed: 2;'24.i20 at 9:�9 AM
Ekotro�e RATER - Vers.on 3.2.3.237�
Indiana 202� Perforinance compliance results calculated using Ekotrope RATER's energ}� and code compliance algorithm, including appropriate amendments.
Ekotrope RATER is a RESNET Accredited HERS Rating Tool. All results are 6ased on data entered 6y Ekotrope users.
Ekotrope disclaims all lia6ility for the information shown on this report.
3584 PERCIVAL DRIVE
Building Features
Ceiling Attic, R-40
Abo�e Grade Walls R-15
Foundation Walls R-11
Framed Floor R-3Q
Slab R-1Q.0 Perimeler, R-10.Q
Llnder
Infiltration 1.37 ELAI 10fl s.f. Shell Area
Window U-Value: 0.3. SHGC: 0.21
Model
CARMEL, IN 46074
Builder: DREES HOMES
CRESTWOOD B5T GAM BD4 9PL R Commun
Duct Leakage to Outside 193.85999999999999 CFM @ 25Pa (3 i 10fl s.f.)
Total duct Leakage 258.48 CFM @ 25Pa (Post-Construction)
Heating Furnace • Natural Gas • 93 AFUE
Cooling Air Conditioner � Electric • 13 SEER
Water Heating Water Healer • Natural Gas • fl.65 Energy Factor
ALBANY PLACE
Duct 5upply R-fi.D, Return R-6 0
�s = 3•c party extercicn of t�e code j�rsdc-cn �tlizirg thzcE i��rcrts. I certP; th=.t -his zner�y cctlz cc�ipli=.rce docu��ert �as C�een createtl in accc�cance �•,-.itl• t�e req�ire�izrts of
CY:.p�er 4 of tne atlopted Internatlonal Energy Conservation Catle dased on Climate Zone 5. If rating is Projectetl. I certify that the 6uiltlinp �esigi c=ccri�ec �ere n is corsictEit t.ill� -ie
bu Iding plans, speclficatlons. antl olher calculations sudmittetl wi[h [he permit appllcation. If ra[ing is ConfrmeQ I certlfy that the adtlress re'erei�ec abcde has beer I�speded-t�ted aid
tra: the mandatory provlsions of the IECC have deen installed to meet or exceed the ln?ent ofthe IECC or wll be venfied as such dy another par.;.
Name: Eric Bjerre Signature: �z't'G B1r��
J
Organization: TopBuild Home Services, Inc Digitally signed: 2�24�'20 at 9:29 AM
Ekotrope RATER - Version 3.2.3.2370
Irdiara 2C2� Cert'ficate compliance resu%s calculated uslnq EkoVope 44TER's anerqy and mde compliance zlgori'hm_ Induding aop�opriate amerdine�ta
Ekotrooe RATER is a RESNET ncredited HERS Rat rc� Tool.?.I resuls are baseC on data sn�.ered b; Ekotrope �sers.
=4:o1rc�:a ;_cla -�s all Ila6 :g i-r 1� = In-rma'ic- a�a;rn o- :h a r I:c4.
Energy �ode Inspectian Checklist
Property ❑rganixatian
358fl PERCIVAL �RIVE Top6uild Home 5ervi�es, I
CARMEL, IN 46074 Eric Bjerre
Madel: CRESTWdO❑ BST GAM BC
Cammunity: ALBANY PLACE Builder
dREES HDMES
9a9dREIN ALBANY PLACE 3580 PE
9a9aREIN ALBANY PLACE 358D PE
�eneral Building Infvrmatian
Conditioned Area �sq ft}
Canditioned Volume (�ubic ft)
Insulated Shell Area (sq fty
6,4G2
�7,78�
11,739.22
Inspe�tion 5tatus
Results are projected
a Build
Hame 5ervices
ENVIRCINMENTS FOf{ J �� � f�
The building energy model in Ekotrope reflects the building assemhlies and energy features listed below. Sometimes errergy
features will �hange in the field from what has been modeled. The inspection pro�ess should identify any �hanges and ensure
that the home continues to meet the applicable energy code.
51ab
� Name: 51ab[2,709 s.f., 257.3 ft. exterior perimetery
R-10 perimeter insulation, R-10 under slah insulation.
Framed Flvar
� Name: ❑ver Ambient (9 s.f.)
R-0 continuous insulation, R-30 cavity insulatian
Insulation Grade: I
Fvundatian Wall
� Name: Belaw-Grade �Exteriar Perimeter [ft]: 222.1, HeightAbave Grade [ft]: 1, ❑epth 6elow Grade [ft]: 6.8y
R: 11.00
Feet from top of wall ta top of insulation: 0, Feet fram top of wall to bottom of insulation: 4
� Name: Garage {Exteriar Perimeter [ft]: 35.3, HeightAbove Grade [ft]: 1, Depth 6elaw Grade [ft]: 6.8}
R: 11.00
Feet from top af wall to tap of insulation: 0, Feet from top of wall to battom of insulatian: 4
Abvve Grade Wall
� Name: Exterior �3,124.2 s.f.}
R-0 continuous insulation, R-15 cavity insulatian
Insulation Grade: I
� Name: Garage �32D s.f.y
R-a continuous insulation, R-15 cavity insulatian
Insulation Grade: I
Energy �ode Inspectian Checklist
Property ❑rganixatian
358fl PERCIVAL �RIVE Top6uild Home 5ervi�es, I
CARMEL, IN 46074 Eric Bjerre
Madel: CRESTWdO❑ BST GAM BC
Cammunity: ALBANY PLACE Builder
dREES HDMES
9a9dREIN ALBANY PLACE 3580 PE
9a9aREIN ALBANY PLACE 358D PE
� Name: Atti� {47D.3 s.f.}
R-0 continuous insulati�n, R-15 cavity insulatian
Insulati�n Grade: I
Rim Jaist
� Name: Ambient (309.7 s.f.}
R: 15.00
� Name: Atti� {71.3 s.f.}
R: 15.00
Ceiling 1 Raof
� Name: Flat Ceiling �2,i18 s.f.y
R-27 continuous insulatian, R-13 cavity insulation
Insulati�n Grade: I
❑paque Daar
� Name: Exteriar �24 s.f.}
U: 0.227
� Name: Garage {18 s.f.}
U: 0.227
�lazing
Inspe�tion 5tatus
Results are projected
� Name: Fr�nt {131 s.f.y, lJ: 0.3D0, SHGC: D.21, ❑rientation: ERST
� Name: Left (65 s.f.J, U: 0.300, SHGC: 0.21, �rientation: SDUTH
� Name: left sgd (48 s.f.}, U: D.300, SHGC: 0.21, �rientation: SDUTH
� Name: Back (254 s.f.}, Ll: D.30D, SHGC: 0.21, Drientatian: WEST
a Build
Hame 5ervices
ENVIRCINMENTS FOf{ J �� � f�
2
� Name: Right {18 s.f.}, Ll: 0.3DD, SHGC: 0.21, Drientation: NDRTH
Energy �ode Inspectian Checklist
Property ❑rganixatian
358fl PERCIVAL �RIVE Top6uild Home 5ervi�es, I
CARMEL, IN 46074 Eric Bjerre
Madel: CRESTWdO❑ BST GAM BC
Cammunity: ALBANY PLACE Builder
dREES HDMES
9a9dREIN ALBANY PLACE 3580 PE
9a9aREIN ALBANY PLACE 358D PE
5kylight
Nane Present
Me�hanical Ventilativn
Inspe�tion 5tatus
Results are projected
� Mechanical ventilation system rated for, and capable of, praviding cantinuous ventilation.
System shall include autamatic timing controls.
System type: Exhaust �nly, 24 hrslday, 22.5 lNatts
Mechanical Equiprnent
�
!�!
�
1Nater Heating {1 ]• Natural Gas • 100°/o Hot Water Load @ 0.65 Energy Factor
Fuel-fired air distribution {2} • Natural Gas • 10D°/o Heating Load �a 93 AFUE
Air conditioner (3} � Electric • 1 DD°Io Caoling Load [�7a 13 SEER
Air Leakage Cvntrvl
� Test Status: 6lower-door tested
House is air-sealed as to achieve 2,924 CFM50 �3.04 AGH50) ar less at final blower-doar test.
Infiltration Requirements for IECC in Climate Zone 5
2�09 IECC Infiltration limit fQr the design home is 7 ACHS�.
2a12 IECC Infiltratian limit for the design home is 3 ACHS�.
2a15 IECC Infiltration limit for the design hame is 3 ACHS�.
2a18 IECC Infiltration limit for the design hame is 3 ACHS�.
Duct Leakage
Duct System 1
NaT entirely within Gonditioned spa�e, testing required
Leakage to ❑utside spe�ified as: 193.85999999999999 CFM [�7a 25Pa �3 J 10D s.f.y
Total Leakage spe�ified as: 258.48 CFM aL? 25Pa (Past-Construction}
a Build
Hame 5ervices
ENVIRCINMENTS FOf{ J �� � f�
3
Energy �ode Inspectian Checklist
Property ❑rganixatian
358fl PERCIVAL �RIVE Top6uild Home 5ervi�es, I
CARMEL, IN 46074 Eric Bjerre
Madel: CRESTWdO❑ BST GAM BC
Cammunity: ALBANY PLACE Builder
dREES HDMES
9a9dREIN ALBANY PLACE 3580 PE
9a9aREIN ALBANY PLACE 358D PE
Duct Leakage Cvde Requirements fvr IECC
2009 IECC:
Inspe�tion 5tatus
Results are projected
Postconstruction Leakage Test: auct Leakage to Dutdoors t= 8 CFM251 100 sq ft CFA.
Rough in Test with AHU: Total auct Leakage �= 6 CFM251 100 sq ft CFA.
Rough in Test without AHU: Total Duct Leakage �= 4 CFM25 1 100 sq ft CFA.
2012 IECC and 2015 IECC Prescriptive Path:
Postconstructian Leakage Test: Tatal au�t Leaka�e �= 4 CFM251 100 sq ft CFA.
Rough in Test with AHU: Total auct Leakage �= 4 CFM251 100 sq ft CFA.
Rough in Test without AHU: Total Duct Leakage �= 3 CFM2� ! 1 QO sq ft CFA.
2Q15 Performance Path �Cost Campliance}:
a Build
Hame 5ervices
ENVIRCINMENTS FOf{ J �� � f�
Leakage testing is required UNLESS all ducts and air handlers are lo�ated entirely within the thermal envelope.
There is no passlfail threshold for duct leakage on the performance path.
Praject Nates
❑RG ID: 7752
ACC#: 909DREIN
BUILDER NAME: DREES HOMES
PR�7ECT ID: 32037
SUBDIVISIdN: ALBANY PLACE
PLAN ID: 835214
PLAN NAME: 3580 PERCIVAL DRIVE-CRESTW��D BST GAM BD4 9PL R-CC
REVISI�N DATE: 02J2��2020
PR�GRAM: HER5�100��CH5:N�
CREATED �N: 02�24J2020
4