HomeMy WebLinkAboutElevations - Elite Plan_3-European_31ST FLOOR
0' - 0"
1ST FLOOR
0' - 0"
1ST FLOOR PLATE
9' - 1 1/8"
1ST FLOOR PLATE
9' - 1 1/8"
1ST WINDOW HT.
6' - 8"
1ST WINDOW HT.
6' - 8"9'-1 1/8"6'-8"5/4"x6" CORNER TRIM
4'-0"
5/4"X6" WOOD TRIMBOARD AND BATTEN SIDING @ 16" O.C.
8
12
8
12 8
12
8:12ARCHITECTURAL SHINGLE
5/4"x8" FRIEZE
RIDGE VENT
DOWNSPOUT
STONE VENEER
GUTTER 8:121ST FLOOR
0' - 0"
1ST FLOOR
0' - 0"
1ST FLOOR PLATE
9' - 1 1/8"
1ST FLOOR PLATE
9' - 1 1/8"
1ST WINDOW HT.
6' - 8"
1ST WINDOW HT.
6' - 8"9'-1 1/8"6'-8"5/4"x6" CORNER TRIM
DOWNSPOUT
5/4"x4" TRIMEXTERIOR LIGHT
6'-7" A.F.F.8:128:128:128
12
8
12
8
12
ARCHITECTURAL SHINGLE
5/4"x8" FRIEZE
GUTTER
BOARD AND BATTEN SIDING @ 16" O.C.
SHEET NUMBERFOR:LOCATION:REV. NO. DATE REMARKSPROPRIETARY RIGHTS NOTICECOPYRIGHT 2007 EPCON COMMUNTIES FRANCHISING, INC.ALL RIGHTS ARE RESERVED IN THIS INFORMATION AND ALL RELATED ILLUSTATIONS, PLANS, BLUEPRINTS, SKETCHES, DRAWINGS, OR ANY OTHER TANGIBLE, EXPRESSIONS THEREOF, WHICH ARE THE PROPERTY OF EPCON COMMUNTIES FRANCHISING, INC., 500 STONEHENGE PARKWAY, DUBLIN, OHIO 43017, TELEPHONE 614.652.3527. NO ONE MAY BUILD, LICENSE, TRANSFER, REPRODUCE OR DUPLICATE THIS WORK IN ANY WAY WITHOUT THE WRITTEN AUTHORIZATION OF EPCON COMMUNITIES FRANCHISING, INC.THESE DRAWINGS SHALL BE USED IN CONFORMANCE WITH ALL LOCAL BUILDING, MECHANICAL, PLUMBING AND ELECTRICAL CODES AND SHALL MEET THE REQUIREMENTS OF THE HEALTH DEPARTMENT, FIRE MARSHALL, AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG), THE FAIR HOUSING ACT ACCESSIBILITY GUIDELINES (FHAAG), AND SHALL BE CONSTRUCTED IN CONFORMANCE WITH STATE AND LOCAL ENERGY REQUIREMENTS.PRINT DATE
LOT #:Architectural Style:Garage Handing:Pipeline Code:A-102PLAN 3 (E-1)CLIENT NAMEPROJECT ADDRESS GOES HEREELEVATIONSLEFTLOT NUMBERELITE3(ON ARCH D PAPER)1/4" = 1'-0"
LEFT VIEW2
(ON ARCH D PAPER)1/4" = 1'-0"
REAR VIEW1
SELECTED OPTIONS
OPTION CODE OPTION NAME YES/NO
ELEV_A ELEVATION A ✔
EURO EUROPEAN COUNTRY ✔
ELEVATION NOTES:
• GRADE CONDITIONS MAY VARY FOR INDIVIDUAL SITE
FROM THAT SHOWN. BUILDER SHALL VERIFY AND
COORDINATE PER ACTUAL SITE CONDITION.
• PROVIDE STEEL LINTELS ABOVE ALL OPENINGS IN
NATURAL BRICK OR NATURAL STONE.