HomeMy WebLinkAboutCarmel A151�
0
0
0
0
0
FINISH SCHEDULE
0
FINISHES-SYMBOLS LEGEND
Room name
xrax
W WaIIFin
B ease Fin
F FloorFin
,aosF
�-o,
Y
/
` PT-XX �
ROOM NAME AND
ROOM FINISHES
ROORING MATERIAL
TRANSITION
Itl[�Pl:�l�[H�]I:iYNI[�l�
ACCENT WALL FlNISH
DESIGNATION
�
FINISH PLAN NOTES
A THESEGENERALNOTESAPPLVTOSHEETA-151.FlNISH
DR4WINGS.
B PAINTALL WOOD FRAMED GLASS DOORS (TYPE FGi AND FG2)
PT-�9(ORANGE)UNLESSOTHERWISE INDICATED.
PAINT CEILING STEEL, BEAMS, STRUCTURE, ETC., EXPOSED TO
� VIEWMFINISHE�AREAS(PT40)UNLESSOTHERWISE
INDICATE�. EXPOSE� COWMNS TO BE PAINTE� PER FINISH
PLAN.
PAINT EXISTING METAL ACCE55 PANELS, LOWERS, UNIT
VENTILATORS ANO OTHER PAINTABLE SURFACES IN ORYWALL
D WALLORSOFRTTOMATCHWALL/SOFFlTUNLESSOTHERWISE
INDICATED.OVERHEAD DUCTW ORK AND DIFFUSERS ARE NOT
TO BE PAINTE�.
FINISH SOFFITS, BULKHEA�S, AND SIMILAR CONDITIONS TO
E MATCHSURROUNDINGSURFACESUNLESSOTHERWISE
INDICATED.
PROVIDE FINISHES BEHIND FIXE� EQUIPMENT SUCH AS
G CABINETRV, CASEWORK, DRY ERASE 80ARDS, TV'S. LOCKERS,
ETC.
ALIGN ROOR RNISH TRANSITIONS AT DOOR LOCATIONS W ITH
H CENTERLINEOFDOORSUCHTHATTRANSITIONMATERIALS
ARE NOT VISIBLE FROM EITHER SIDE W HEN DOOR IS IN
CLOSED POSITION.
REFER TO REFLECTED CEILING PLANS AND INTERIOR
� ELEVATIONS FOR ADDITIONAL FINISH MFORMATION.
FINISH LEVEL REQUIREMENTS FOR GVPSUM BOARD SURFACES
J IS LEVEL 4 UNLESS OTHERWISE INDICATED OR REQUIRED BY
MANUFACTURER (DRV ERASE WALLS).
DRV ERASE W ALLS TO MATCH �RV ERASE WALL RNISHED IN
CURRENTLV OCCUPIED PORTION OF TENANT SUITE.
K INSTALLATION�IRECTIONSMu5TBE5TRICTLVAOHEREDIN
ORDER TO AC W EVE E�UAL �UALITV TO EXISTING DRV ERASE
WALLS. LEVEL 5 FINISH REQUIRE� ON THESE W ALLS.
FROSTED WINDOW FlLM TO BE PROVIDED BV G G, SAMPLES
L TOBESUBMITTEDTOINTERIORDESIGNERAN�TENANTFOR
APPROVAL.
HOLLOW METAL DOOR FRAMES TO BE PAWTE� W ITH PAWT
TVPE TO MA%IMIZE ADHESION. AS NOTED, HOLLOW METAL
M FRAMES ON TENANT SIDE TO BE PAINTED TO MATCH
AW MATONE COLOR. HOLLOW METAL FRAMES ON PUBLIC
CORRIDOR SIDE TO BE PAINTED TO MATCH OTHER DOOR
FRAMES IN PUBLIC CORRIDOR.
EXPOSED DUCT IS NOTTO BE PAINTEO. PROTECT DURING
N PAINTINGOFCEILINGANDOVERHEADSTRUCTURE.OVERHEAD
AN� EXPOSED WALL CONDUITTO BE PAINTED TO MATCH
CEILING.
Blue Horseshoe
SOIUtIOC1S
11939 N. Meridian St.
Carmel, IN 46033
Blue Horseshoe Solutions
11939 N. Meridian Street
Carmel, IN 46033
(317)730-2641
RATIO Architects, Inc.
227 Fayetteville Street, Suite 301
Raleigh, North Carolina 27601
919-821-0805
CONSTRUCTION DOCUMENTS
04.04.2017
� �
Revisian 2
FINISH DESCRIPTION
PRODUCT
LOCATION FINISH TYPE TAG MANUFACTURER STYLE SIZE NUMBER COLOR INSTALL NOTES COMMENTS
WALL WOODLOOKWALLTILE MAT-01 FLORIMUSA CHARLESTON 3"X36" 1�959]6 GREY 30%OFFSETPATTERN GROUTTOBECUSTOMBUILIDNGPRODUCTS,COLOR:ll545BLEACHED
WOOD. INSTALL TILE PER IvNNUFACTURERS WRITTEN INSTRUCTIONS
WALL PAINT-TVP.WALL&CEILING PT-�i SHERWINWILLIAMS NIA N/A SW�648 BIGCHILL SHEENMUSTMATCHEXISTING
SUITE
WALL PAINT-TYP. DRV ERASE PT-�2 MATCH MFR USED IN E%ISTING MATCH STVLE 115ED IN EXISTWG N/A N/A MATCH COLOR 115ED IN INSTALL PER MANl1FACTURERS WHITE DRV ERASE PAINT FINISH PER FINISH NOTES. MUST MATCH
SUITE SUITE EXISTING SUITE WRITTEN INSTRUCTIONS FlNAL PRODUCT USED M EXISTING SUITE
WALL PAINT-ACCENT"OARKGREV" PT-�3 SHERWINWILLIAMS N/A N/A SW]650 ELLIEGRAV SHEENMUSTMATCHEXISTING
SUITE
WALL PAINT-ACCENT"LIGHTORANGE" PT-Oa SHERWINWILLIAMS N/A NIA SW63�6 GOLDCOAST SHEENMUSTMATCHEXISTING ATPRINTERSTATIONORVWALLSURROUND
SUITE
WALL PAINT-ACCENT"LIGHTBLUE" PT-OS SHERWINWILLIAMS N/A N/A SW0048 BUNGLEHOUSEBWE SHEENMUSTMATCHE%ISTING MSTALLON�RVWALLANDExPOSEDMETALCOLUMNS.PAINTTVPE
SUITE VARIES WITH SUBSTRATE FOR MAXIMUM ADHESION.
WALL PAINT-ACCENT"DARKBWE" PT-�6 SHERWINWILLIAMS N/A N/A SW6230 RAINSTORM SHEENMUSTMATCHEXISTING
SWTE
CEILING PAINT-DRVWALLCEILINGS PT-01 SHERWINWILLIAMS N/A NIA SW]00� CEILINGBRIGHTWHITE FLATSHEEN USEATUNDERSI�EOFBULKHEADSINPUBLICCORRIDOR
DOORS PAINT-ACCENT"DARKORANGE" PT-�9 SHERWINWILLIAMS NIA NIA SW]]09 COPPERPOT TVPICALDOORPAINT-MUSTUSESAMEPAINTSPECIFICATIONAS
WAS USED ON DOORS IN EXISTING SUITE FOR MN(IMUM ADHESION
ANO DURABILITY.
BASE WALL BASERUBBER RB-01 JOHNSONITE ROLLED GOODS. COVE BASE 4" H NIA 469 MVSTIFV
FLOOR CARPETTILE CPT-01 TANDUS ELEMENT 18'%36" �4468 PUREGRAVIb001 ASHLAR INSTALLATION
CEILING ACOUSTICALCEILINGTILE ACT-01 ARMSTRONG CORTEGASECONDLOOKII 2'X4' 2161 STANDARDWHITE BUILDINGSTANDARD
CEILING PAIMED DRVWALL GWB-01 5/e" DRYWALL PAINT PT-0� SEE RNISH PLAN AND RCP FOR SOFFlTS WITH ACCENT PAINT COLOR
CEILING PAINT-DRVFALL PT-1� SHERWINWILLIAMS N/A NIA SWI045 INTELLECTUALGRAV FOREXPOSEDDECKCEILINGS;FLATFINISH
MILLWORKICASEWORK PLASTICLAMINATE PL-01 FORMICA NIA REFERTODRAWINGS 928-58 MOUSE TYPICALPRINTCABS
MILLWORK/CASEWORK PLASTICLAMINATE PL02 WILSONART N/A REFERTO�RAWINGS 15�3-60 FROSTYWHITE TVPICALPRINTCOUNTERTOPS
CHECKEDBY
APPROVEDBY
PROJECTNO.
19124.000
r3'o
�£-
n? cz:-
''.�� � coarRicHrrvonce. rHisnacHirEcruan�
AN�ENGINEERINGDRAWINGISGIVENIN
GONRDENCEANDSHALLBEUSEDONLY
y� PlIRSUANTTOTHEAGREEMENTWITHRATlO
ARCHITECTS,INC. NOOTHERUSE,
OIssEMlNniION OR DUPLICATION MAY BE
RAT I O
ei SECOND FLOOR FINISH PLAN - OPTION 1
A.,s,
RELEA5E0 FOR CONSTRUCTION
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
`�y,:a���'.�`� �,�:;valo/„1��_
DATE: 03�Z��2O
SHEET TITLE
SECOND FLOOR
FINISH PLAN
SHEETNUMBER