Loading...
HomeMy WebLinkAbout18-0128 - Nort End Phase 1 - C1.3 PRE-CONST SWPPP AND DEMO PLANSP SPSP SP SPSP SP SP SPSP SPSP SP SP SP SP SP SP SPSP SP SP SP SP SP SP SPSP SPSP SP SP SP SP SPSP SP SP T EM EM T GM EM EM WC CO EM EM EM EM EM GM GM GM GM WC CO STL STL STL STL CO WMGMEM T E C I I MW SP VP STL WC ARV FP CHECKED BY: PROJECT NO.:DATE: DRAWN BY: SHEET TITLE: SHEET NO.:3/20/2020 12:09 PM, Ron Richardson|S:\Project Files\2018\18-0128\CADD\Design\Sheet Sets\North End\18-0128_Pre-Construction SWPPP.dwgTOTAL SHEETS:NO.DATEDESCRIPTIONCOPYRIGHTED BY SHREWSBERRY AND ASSOCIATESREVISIONS RDR KMB 02/19/2020 18-0128 ----HAMILTON COUNTYCARMEL, INDIANANORTH END - PHASE 17321 SHADELAND STATION, INDIANAPOLIS IN 46256 (p) 317.841.4799   (f) 317.841.4790 shrewsusa.com DRAWING STATUS: CONSTRUCTION PLANS IIND ANA T DE RE RE G I S 10302164 STATE OF No. PR ELI MI N A R Y NO T F O R CO N S T R U C TI O N102/19/20INITIAL CONSTRUCTION PLAN SUBMITTAL TO CARMEL FOR REVIEW203/20/20CITY OF CARMEL RESUBMITTALBENCHMARK INFORMATION:(NAVD 1988) C1.3 PRE-CONSTRUCTION SWPPP AND DEMOLITION PLAN N DEMOLITION GENERAL NOTES:CARMEL GENERAL NOTES: LEGEND: EXISTING LEGEND: SWPPP LEGEND: DEMOLITION KEYNOTES: PHASE 1 FUTURE PHASE 2 THIS SHEET TO BE USED FOR EROSION CONTROL ONLY. CONSTRUCTION ACTIVITIES CONSTRUCTION INFORMATION PRE-CONSTRUCTION ACTIVITIESDEVELOPMENT NOTES GENERAL NOTES SITE SPECIFIC SEQUENCE:STORMWATER POLLUTION PREVENTION PLAN GENERAL NOTES: